Application registered
Consultation
period
Application under consideration
Decision
made
Description
Refurbishment of outbuildings and construction of covered carport ancillary to existing dwelling (as amended by drawing nos BH/003 Rev.A and BH/004 Rev.A accompanying agent's letter dated 19 July 1999 and as amplified by agent's letter dated 30 July 1999 and as clarified by plans and schedule of works accompanying agent's letter dated 25 August 1999).
Location
Barn House, Sonning Eye, Eye & Dunsden
Grid Reference
475111/175851
Applicant
J Flindall
Barn House
Sonning Eye
READING
Berks
Agent
Gebler Tooth Architects
9 Ledbury Mews North
LONDON
W11 2AF
Constraints
Sonning Eye Conservation Area
Consultation / Notification
No further Representations on this application will be accepted.
Consultations / Notifications to date are shown below.
Name / Number
Date Sent
Response Date
c/o Mr D R Hepburn,
Wyeval,
Kennylands Road,
Sonning Common,
READING.
RG4 9JT
11 08 1999
Tech.Dir,Babtie Engineering S.
17 06 1999
The Old Cottage
Sonning Eye
READING
RG4 OTN
Long Gardens
Sonning Eye
READING
RG4 6TR
10 08 1999
S.Clarke,Snr.Pl.Liaison Off.
07 07 1999
Dept.of Env.Services - MIN
13 08 1999
Application Progress
Date Received
9th June 1999
Registration Date
9th June 1999
Start Consultation Period
9th June 1999
End Consultation Period
16th July 1999
Target Decision Date
4th August 1999
Decision
Planning Permission on 8th September 1999
Conditions / Refusal Reasons
That the development must be begun not later than the expiration of five
years beginning with the date of this permission and if this condition
is not complied with this permission shall lapse.
Reason: By virtue of Sections 91 to 95 of the Town and Country Planning
Act 1990.
That, notwithstanding the details shown on drawings BH/003 Rev A and
BH/004 Rev A, the walls on the eastern elevation of the outbuilding
shall be constructed of brick and dark stained weatherboarding and
shall thereafter be retained as such.
Reason: To ensure that the details of the development are satisfactory.
That the materials to be used for the making good of the walls and roofs
shall be of the same colour, type and texture as those used on the
existing building.
Reason: To ensure that the details of the development are satisfactory.
That samples of the materials to be used for the external walls and roof
of the carport shall be submitted to and approved in writing by the
Local Planning Authority before any development commences.
Reason: To ensure that the details of the development are satisfactory.
That development shall not begin until a detailed specification of the
type, design and external finish of all windows (including rooflights),
external doors and rainwater goods has been submitted to and
approved in writing by the Local Planning Authority.
Reason: To ensure that the details of the development are satisfactory.
That notwithstanding the provisions of the Town and Country Planning
General Permitted Development Order 1995 (or any order revoking or
re-enacting that Order) no additional windows or doors shall be
inserted in the building (except any that may be included on the plans
hereby permitted) unless planning permission has been granted by the
Local Planning Authority on a formal application submitted for such
development.
Reason: To ensure that the development is not unneighbourly and to
safeguard the character of the area.
That the additional living accommodation hereby permitted shall be
occupied and used only in connection with and ancillary to the occupation
and use of the existing property Barn House as a single dwellinghouse,
as specified in the application, and shall not be occupied or used
separately therefrom.
Reason: As the separate occupation of the accommodation would represent
an undesirable sub-division of the property and result in
inadequate standards of amenity and privacy.
That existing ground levels on the site shall not be raised.
Reason: To prevent the increased risk of flooding due to impedance of
flood flows and reduction of flood storage capacity.
That no spoil or materials shall be deposited or stored on that part of
the site lying within the area of land liable to flood as shown on maps
held by the Environment Agency.
Reason: To prevent the increased risk of flooding due to impedance of
flood flows and reduction of flood storage capacity.
That the refurbishment of the existing outbuilding shall be carried out
in accordance with the schedule of works accompanying the Agent's
letter dated 25 August 1999, unless otherwise agreed in writing by
the Local Planning Authority.
Reason: To ensure that the work is carried out in accordance with
the submitted information as a refurbishment of the existing
building and in line with the Council's adopted planning policies.
Updates