Planning Application Details

P97/W0019Application Type: No Type (Show Map - opens in new window)
Status Bar
 
 Completed stage
 
 Current stage
 
 Next stage
Application registered
Consultation period
Application under consideration
Decision made
Description
Demolition of conservatory and construction of new conservatory, store and kitchen extension. Replace existing aluminium with timber windows. Formation of new window to study. New insulated white render to external walls. Minor amendments to studio wing elevations. (As amended by drawing BCD.2b accompanying applicants letter dated 26 February 1997).
Location
7 Rotten Row, Dorchester
Grid Reference
457813/194060
Applicant
Mr M R Evans
7 Rotten Row
Dorchester
WALLINGFORD
Oxon,   OX10 7LJ
Agent
Mr M R Evans
7 Rotten Row
Dorchester
WALLINGFORD
Oxon,   OX10 7LJ
Constraints
Dorchester Conservation Area
Case Officer
Sharon Crawford
Telephone: 01235 422600
Email: planning@southoxon.gov.uk
Consultation / Notification
No further Representations on this application will be accepted.

Consultations / Notifications to date are shown below.

Name / Number
Date Sent
Response Date
 
c/o Mr. T. H. Carter
6 Jemmets Close,
Dorchester-on-Thames,
WALLINGFORD, Oxon    OX10 7RA
17 03 1997
 
Tech.Dir,Babtie Engineering S.
28 01 1997
 
County Archaeologist
 
Application Type
Other
Application Progress
Date Received  
20th January 1997
Registration Date  
20th January 1997
Start Consultation Period  
20th January 1997
End Consultation Period  
20th February 1997
Target Decision Date  
17th March 1997
Decision
Planning Permission on 24th March 1997
Conditions / Refusal Reasons
That the development must be begun not later than the expiration of five years beginning with the date of this permission and if this condition is not complied with this permission shall lapse. Reason: By virtue of Sections 91 to 95 of the Town and Country Planning Act 1990. That samples of the materials to be used for the external walls shall be submitted to and approved in writing by the Local Planning Authority before any development commences. Reason: To ensure that the details of the development are satisfactory. That a full archaeological watching brief shall be carried out during the period of construction works in accordance with details and by a professionally competent archaeological organisation which shall have been submitted to and approved in writing by the Local Planning Authority before development commences. The brief shall include the recording of any archaeological features revealed, limited archaeological excavation and the retrieval of artefactual evidence. Reason: As the site is of archaeological importance.
Appeal
No appeal lodged.
Updates
These Planning Application Details were returned live from our back office database, and as such are as up to date as when the page was retrieved.