Description
Erection of a detached single and two-storey dwelling with access, parking and amenity space (As amplified by additional Information - Visibility splays and Agent's email received 9 April 2024).
Location
Land at 25A Oakley Road Chinnor Oxon OX39 4ND
Grid Reference
475318/200633
Applicant
M.A.Daly Building Contractors Ltd
C/O Agent
Agent
JCPC Ltd
4 Hawthorne Avenue
Thame
OX9 2AS
Case Officer
Lilua Iheozor-Ejiofor
Telephone: 01235 422600
Email: planning@southoxon.gov.uk
Consultation / Notification
No further Representations on this application will be accepted.

Consultations / Notifications to date are shown below. If the response has been scanned, you can access the document by clicking the folder icon alongside the relevant consultee. Folders with a
*
alongside them indicate new content within the folders (i.e. new documents added within the last 7 days)

Name / Number
Date Sent
Response Date
Scanned Response
 
Chinnor Parish Council
c/o Ms L Folley
Community Pavilion
Station Road
Chinnor
Oxfordshire
OX39 4PU
08 03 2024
11 04 2024
 
Drainage - (South&Vale)
08 03 2024
25 04 2024
 
South -Highways Liaison Officer (Oxfordshire County Council)
11 04 2024
30 04 2024
 
25 Oakley Road
Chinnor
OX39 4HD
08 03 2024
 
33 Timber Way
Chinnor
OX39 4EU
08 03 2024
 
25A Oakley Road
Chinnor
OX39 4HD
08 03 2024
 
3 Timber Way
Chinnor
OX39 4EU
08 03 2024
19 04 2024
 
2 Timber Way
Chinnor
OX39 4EU
08 03 2024
 
22 Oakley Road
Chinnor
OX39 4HB
08 03 2024
 
24A Oakley Road
Chinnor
OX39 4HB
08 03 2024
 
30 Timber Way
Chinnor
OX39 4EU
08 03 2024
 
31 Timber Way
Chinnor
OX39 4EU
08 03 2024
 
32 Timber Way
Chinnor
OX39 4EU
08 03 2024
 
23 Oakley Road
Chinnor
OX39 4HD
08 03 2024
 
6 Timber Way
Chinnor
OX39 4EU
28 03 2024
 
6 Timber Way
Chinnor
OX39 4EU
02 05 2024
 
Application Type
Minor (Full Application)
Application Progress
Date Received  
15th February 2024
Registration Date  
15th February 2024
Start Consultation Period  
8th March 2024
End Consultation Period  
30th March 2024
Target Decision Date  
7th May 2024
Decision
Planning Permission on 7th May 2024
Conditions / Refusal Reasons
The development to which this permission relates must be begun not later than the expiration of three years beginning with the date of this permission. Reason: By virtue of Sections 91 to 95 of the Town and Country Planning Act 1990 as amended by section 51 of the Planning and Compulsory Purchase Act 2004.

That the development hereby approved shall be carried out in accordance with the details shown on the following approved plans, 19, 17, 16 and 18, except as controlled or modified by conditions of this permission. Reason: To secure the proper planning of the area in accordance with Development Plan policies.

No development above slab level shall take place until a photographic schedule of all materials to be used in the external construction and finishes of the development hereby permitted has been submitted to and approved in writing by the Local Planning Authority. Reason: In the interests of the visual appearance of the development in accordance with Policies DES1 and DES2 of the South Oxfordshire Local Plan 2035.

Notwithstanding any details shown on the approved drawings, the bathroom and ensuite windows at first floor in the south east elevation of the development hereby permitted shall be glazed in obscure glass with a minimum of level 3 obscurity, and shall be fixed shut with the exception of a top hung openable fanlight (or other means of opening to be first agreed in writing by the Local Planning Authority) prior to the first occupation of the accommodation and it shall be retained as such thereafter. Reason: To ensure that the development is not unneighbourly in accordance with Policy DES6 of the South Oxfordshire Local Plan 2035.

Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 2015 (or any order revoking or re-enacting that Order), no window(s), door(s) or other openings other than those shown on the approved plan(s) shall be inserted above ground floor in the south east elevation of the development hereby permitted. Reason: To ensure that the development is not unneighbourly in accordance with Policy DES6 of the South Oxfordshire Local Plan 2035.

Prior to commencement of the development above slab level, details of hedge planting along the southwest boundary of the site shall be submitted to and approved in writing by the Local Planning Authority. Such hedge shall be so tended as to grow to and remain at a height of at least 1.5metres, and any plant which may die or be seriously damaged or destroyed within 5 years of the completion of the development shall be replaced and the replacement shall be properly maintained. Reason: To help to assimilate the development into its surroundings in accordance with Policies ENV1, DES1 and DES2 of the South Oxfordshire Local Plan 2035.

Prior to first occupation, all carbon reduction energy efficiency measures shall be implemented in accordance with the Energy Statement hereby approved and a Verification Report shall be submitted to the Local Planning Authority and approved in writing. The Verification Report shall demonstrate (with photographic evidence) that the energy efficiency measures have been implemented. These measures shall be retained and maintained as such thereafter in accordance with the Energy Statement and Verification Report. Reason: To ensure high standards of sustainable design and construction in accordance with Policy DES10 of the South Oxfordshire Local Plan 2035.

The air source heat pumps hereby approved shall meet Microgeneration Installation Standard: MCS 020 to qualify as permitted development. If this MCS Certification cannot be met, the approved air source heat pumps shall be so installed, maintained, and operated so as to ensure that the rating noise level from the equipment does not exceed the background noise level at the boundary of the premises. Measurement and rating of noise for the purposes of this condition shall be in accordance with BS4142 (2014) 'Method for rating industrial and commercial sound'. The measurement location shall be 1 metre from the facade of the nearest noise sensitive receptor. In the event of unacceptable noise or vibration being caused by the installed plant, machinery and equipment, the persons responsible/owner shall investigate and undertake works to resolve the problem to the satisfaction of the local planning authority. Reason: To protect the occupants of nearby residential properties from loss of amenity due to noise disturbance and in accordance with Policy ENV12 of the South Oxfordshire Local Plan 2035.

Prior to the commencement of development, with the exception of any demolition, a full surface water drainage scheme shall be submitted to, and approved in writing by, the Local Planning Authority. The design of the surface water drainage system shall be in accordance with the non-statutory technical standards for sustainable drainage systems, including details of BRE 365 soakage testing, levels, size, position and construction of all drainage works. The drainage scheme shall be sized to accommodate a minimum of the worst case 1 in 30 year storm, with evidence to demonstrate that the site can accommodate the worst case 1:100 year storm + 40% Climate Change storm, without any flows exiting up to this storm event and any storage on site not causing a nuisance or flooding to property. Should an outflow be required, then this must be restricted to QBAR. A surface water discharge to a Thames Water recorded foul sewer will not be permitted under any circumstance. The approved scheme shall be implemented in accordance with the approved details prior to the occupation of the development hereby approved. Notes Cv values must be set at 0.95. An exceedance plan must be provided. The building must contain a bio retention feature. This could be in the form of a rain water planter. Full construction details of all surface water drainage components including hard standing areas, must be provided. Drainage layout from RWP must be provided. Reason: To ensure the proper provision of surface water drainage and to ensure flooding is not exacerbated in the locality in accordance with Policy EP4 of the South Oxfordshire Local Plan 2035.

Prior to occupation of the development hereby permitted the proposed means of access onto 'Timber Way', is to be formed and laid out and constructed strictly in accordance with the local highway authority's specifications and all ancillary works specified shall be undertaken. Reason: In the interest of highway safety in accordance with Policy TRANS5 of the South Oxfordshire Local Plan 2035.

The vision splays shown on drawing no. 19 shall not be obstructed by any object, structure, planting or other material with a height exceeding or growing above 0.9 metres as measured from carriageway level. Reason: In the interest of highway safety in accordance with Policy TRANS5 of the South Oxfordshire Local Plan 2035.

Prior to the first occupation of the development hereby approved, the parking and turning areas shall be provided in accordance with drawing no. 18 and shall be constructed, laid out, surfaced, drained and completed to be compliant with sustainable drainage (SuDS) principles, and shall be retained unobstructed except for the parking of vehicles associated with the development at all times. Reason: In the interests of highway safety and in accordance with Policy TRANS5 of the South Oxfordshire Local Plan 2035.

Prior to the construction of the development hereby approved above slab level, details of cycle parking facilities shall be submitted to and approved in writing by the Local Planning Authority. The cycle parking shall be implemented prior to first use of the development and thereafter retained in accordance with the approved details. Reason: To encourage the use of cycles as a means of transport in accordance with Policy TRANS5 of the South Oxfordshire Local Plan 2035.

Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 2015 (or any Order revoking or re-enacting that Order), the enlargement, improvement or other alteration of any dwellinghouse as described in Schedule 2, Part 1, Class A of the Order shall not be undertaken without obtaining planning permission from the Local Planning Authority. Reason: To safeguard the amenities of the occupiers of the adjoining properties and the character of the area in accordance with Policies DES1, DES2 and DES6 of the South Oxfordshire Local Plan 2035.

Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 2015 (or any Order revoking or re-enacting that Order) the provision within the curtilage of the dwelling of any building, enclosure or swimming pool as described in Schedule 2, Part 1, Class E of the Order shall not be undertaken without obtaining planning permission from the Local Planning Authority. Reason: To safeguard the amenities of the occupiers of the adjoining properties and the character of the area in accordance with Policies DES1, DES2 and DES6 of the South Oxfordshire Local Plan 2035.

Prior to the first occupation of the development hereby approved, an Electric Vehicle Charging Point shall be installed for the dwelling and thereafter retained as such. Reason: To ensure sustainable forms of transport in accordance with Policies TRANS5, ENV12 and EP1 of the South Oxfordshire Local Plan 2035.
Appeal
No appeal lodged.
Updates
These Planning Application Details were returned live from our back office database, and as such are as up to date as when the page was retrieved.