Planning Application Details

P23/S2422/FULApplication Type: Full Application (Show Map - opens in new window)
Status Bar
 
 Completed stage
 
 Current stage
 
 Next stage
Application registered
Consultation period
Application under consideration
Decision made
Description
Proposed demolition of existing former farmyard buildings & erection of a detached 1.5 storey barn-style dwelling house with attached double car port.
Location
Hook End Farm Park Lane Checkendon RG8 0UH
Grid Reference
467095/181280
Applicant
Greatwood Investments Ltd T/A
Hook End Farm
Park Lane
Checkendon
Reading
RG8 0UH
Agent
JPPC
Bagley Croft
Hinksey Hill
Oxford
OX1 5BD
Case Officer
Marc Pullen
Telephone: 01235 422600
Email: planning@southoxon.gov.uk
Consultation / Notification
No further Representations on this application will be accepted.

Consultations / Notifications to date are shown below.

Name / Number
Date Sent
Response Date
 
Checkendon Parish Council
Matthew Wickens (Chaiman)
28 07 2023
21 08 2023
 
South and Vale Countryside Officer
28 07 2023
04 09 2023
 
Drainage - (South&Vale)
28 07 2023
30 08 2023
 
Forestry Officer (South and Vale)
28 07 2023
12 09 2023
 
South -Highways Liaison Officer (Oxfordshire County Council)
29 07 2023
22 08 2023
 
Contaminated Land
28 07 2023
11 08 2023
 
Hook End Farm
Park Lane
Checkendon
Reading
RG8 0UH
28 07 2023
 
Application Type
Minor (Full Application)
Application Progress
Date Received  
17th July 2023
Registration Date  
24th July 2023
Start Consultation Period  
28th July 2023
End Consultation Period  
18th August 2023
Target Decision Date  
18th September 2023
Decision
Planning Permission on 18th September 2023
Conditions / Refusal Reasons
The development to which this permission relates must be begun not later than the expiration of three years beginning with the date of this permission. Reason: By virtue of Sections 91 to 95 of the Town and Country Planning Act 1990 as amended by section 51 of the Planning and Compulsory Purchase Act 2004.

That the development hereby approved shall be carried out in accordance with the details shown on the following approved plans, 22-012-P01, 22-012-P06, 22-012-SU01, 22-012-P05, 22-012-L01, 22-012-P03, 22-012-F01B, 22-012-P04, 22-012-P02 and 21218-200A, except as controlled or modified by conditions of this permission. Reason: To secure the proper planning of the area in accordance with Development Plan policies.

The exterior of the development hereby permitted shall only be constructed in the materials specified on the plans/supporting documents hereby approved or in materials which shall previously have been approved in writing by the Local Planning Authority. Reason: In the interests of the visual appearance of the development in accordance with Policies DES1 and DES2 of the South Oxfordshire Local Plan 2035.

Prior to the commencement of the development a phased risk assessment shall be carried out by a competent person in accordance with current government and Environment Agency Guidance and Approved Codes of Practice such as Land Contamination: Risk Management 2020 and BS10175:2011 +A2:2017 'Investigation of potentially contaminated sites'. Each phase shall be submitted to and approved in writing by the Local Planning Authority. Phase 1 shall incorporate a desk study and site walk over to identify all potential contaminative uses on site, and to inform the conceptual site model. If potential contamination is identified in Phase 1 then a Phase 2 investigation shall be undertaken. Phase 2 shall include a comprehensive intrusive investigation in order to characterise the type, nature and extent of contamination present, the risks to receptors and if significant contamination is identified to inform the remediation strategy. Phase 3 requires that a remediation strategy be submitted to and approved by the LPA to ensure the site will be rendered suitable for its proposed use. Reason: To ensure that any ground, water and associated gas contamination is identified and adequately addressed to ensure the safety of the development, the environment and to ensure the site is suitable for the proposed use in accordance with Policy ENV11 of the South Oxfordshire Local Plan 2035.

The development shall not be occupied until any previously approved remediation strategy has been carried out in full and a validation report confirming completion of these works has been submitted to and approved in writing by the Local Planning Authority Reason: To ensure that any ground, water and associated gas contamination is identified and adequately addressed to ensure the safety of the development, the environment and to ensure the site is suitable for the proposed use in accordance with Policy ENV11 of the South Oxfordshire Local Plan 2035.

The developer shall confirm in writing to the Local Planning Authority the presence of any unsuspected contamination encountered during the development. In the event of any contamination to the land and/or water being encountered, no development shall continue until a programme of investigation and/or remedial works to include methods of monitoring and certification of such works undertaken. Where land contamination investigation/remedial works are required this must be carried out by a competent person in accordance with current government and Environment Agency Guidance and Approved Codes of Practice such as Land Contamination: Risk Management 2020 and BS10175:2011 +A2:2017 'Investigation of potentially contaminated sites' and submitted to and approved in writing by the local planning authority. Reason: To ensure that any ground, water and associated gas contamination is identified and adequately addressed to ensure the safety of the development, the environment and to ensure the site is suitable for the proposed use in accordance with Policy ENV11 of the South Oxfordshire Local Plan 2035.

Prior to the commencement of development, with the exception of any demolition, a full surface water drainage scheme, shall be submitted to, and approved in writing by, the Local Planning Authority. The design of the surface water drainage system will be in accordance with the non-statutory technical standards for sustainable drainage systems, including details of BRE 365soakage testing, levels, size, position and construction of drainage works. The drainage scheme shall be sized to accommodate a minimum of the worst case 1 in 30 year storm, with evidence to demonstrate that the site can accommodate the worst case 1:100 year storm + 40% Climate Change storm, without any flows exiting up to this storm event and any storage on site not causing a nuisance or flooding to property. A surface water discharge to a Thames Water recorded foul sewer will not be permitted under any circumstance. The approved scheme shall be implemented in accordance with the approved details prior to the occupation of the development hereby approved. Reason: To prevent pollution and flooding in accordance with Policies ENV12 and EP4 of the South Oxfordshire Local Plan 2035.

Prior to the commencement of development, with the exception of any demolition, a full foul water drainage scheme shall be submitted to and approved in writing by the Local Planning Authority. The drainage scheme shall include details of soakage testing (if necessary), method, levels, size, position and construction of the drainage scheme. Reason: To ensure the proper provision of foul water drainage and to ensure flooding and pollution is not exacerbated in the locality in accordance with policy EP4 of the South Oxfordshire Local Plan 2035.

Prior to occupation of the development, the existing means of access onto 'Park Lane', shall be improved and laid out and constructed strictly in accordance with the local highway authority's specifications and all ancillary works specified shall be undertaken. Reason: In the interest of highway safety in accordance with Policy TRANS5 of the South Oxfordshire Local Plan 2035.

Prior to the first occupation of the development, hereby approved, the parking and turning areas shall be provided in accordance with drawing no. 22-012-P02-, and shall be constructed, laid out, surfaced, drained and completed to be compliant with sustainable drainage (SuDS) principles, and shall be retained unobstructed except for the parking of vehicles associated with the development at all times Reason: In the interests of highway safety and in accordance with Policy TRANS5 of the South Oxfordshire Local Plan 2035.

The development hereby permitted shall be implemented in accordance with Section 6.3.1.1, 6.3.2 and 6.3.4 of the Preliminary Ecological Appraisal (PEA) report (Windrush Ecology, July 2023), with respect to working methods to protect fauna. Reason: To protect the important species on the site, in accordance with Policies ENV2 and ENV3 of the South Oxfordshire Local Plan 2035.

The development hereby permitted shall be implemented in accordance with the external lighting recommendations as set out in Section 6.3.3.2 of the Preliminary Ecological Appraisal (July 2023, windrush ecology). Reason: To protect the important species on the site, in accordance with Policies ENV2 and ENV3 of the South Oxfordshire Local Plan 2035.

A minimum of one integrated bird box and one integrated bat box (as per specifications as per Section 6.3 of the Preliminary Ecological Appraisal (July 2023, windrush ecology) should be installed within the dwelling. Provision for a 2TF Schwegler Kestrel Nest Box should also be installed on the external surface of the dwelling or installed on retained trees provided there is a suitable mature tree with good structural integrity and available installation height of 6 - 8 metres. Bird and bat boxes should be installed under guidance from a suitably qualified ecologist and should be secured as planning conditions. Reason: To protect the important species on the site, in accordance with Policies ENV2 and ENV3 of the South Oxfordshire Local Plan 2035.

Prior to the construction of the development hereby approved above slab level, details of the specification of glass coating to be applied to the external glazing of openings on all elevation(s), shall be submitted to and approved in writing by the Local Planning Authority, and thereafter the glazing shall be implemented and retained in perpetuity in accordance with the approved details. Reason: To minimise visible light transmittance and prevent illumination and light spill for the protection of the appearance of the area, the environment and wildlife, and local residents from light pollution in accordance with Policies ENV1 and ENV12 of the South Oxfordshire Local Plan 2035.

Prior to the commencement of the development hereby approved/Prior to the construction of any development above slab level a scheme for the landscaping of the site, including the planting of live trees and shrubs, shall be submitted to and approved in writing by the Local Planning Authority. These details shall include schedules of new trees and shrubs to be planted (noting species, plant sizes and numbers/densities), the identification of the existing trees and shrubs on the site to be retained (noting species, location and spread), any earth moving operations and finished levels/contours, and an implementation programme. The scheme shall be implemented prior to the first occupation or use of the development hereby approved and thereafter be maintained in accordance with the approved scheme. In the event of any of the trees or shrubs so planted dying or being seriously damaged or destroyed within 5 years of the completion of the development, a new tree or shrub or equivalent number of trees or shrubs, as the case may be, of a species first approved by the Local Planning Authority, shall be planted and properly maintained in a position or positions first approved in writing by the Local Planning Authority. Reason: To help to assimilate the development into its surroundings in accordance with Policies ENV1, DES1 and DES2 of the South Oxfordshire Local Plan 2035.

Prior to the commencement of any site works or operations, including demolition and site clearance relating to the development hereby permitted, an Arboricultural Method Statement and accompanying Tree Protection Plan shall be submitted to and approved in writing by the Local Planning Authority. The Arboricultural Method Statement must include the following: (1) A specification of any pruning or tree surgery works to any trees to be retained, to prevent accidental damage by construction or demolition activities; (2) The specification and location of temporary tree protective fencing and any ground protection required to protect all retained trees in accordance with the current edition of BS 5837 ''Trees in relation to design, demolition and construction'', and details of the timing and duration of its erection; (3) The definition of areas for the storage or stockpiling of materials, temporary on-site parking, site offices and huts, mixing of cement or concrete, and fuel storage; (4) The means of demolition of any existing site structures, and of the re-instatement of the area currently occupied thereby; (5) The route and method of installation of drainage or any underground services in the vicinity of retained trees; Consideration will be made to avoid siting of utilities and service runs within the Root Protection Area (RPA) of all trees to be retained. Only where it can be demonstrated that there is no alternative location for the laying of utilities, will encroachment into the RPA be considered. Methodology for any installation works within the RPA will be provided and must be in compliance with the current edition of NJUG 'Guidelines for the planning and installation and maintenance of utility apparatus in proximity to trees'. (6) The details and method of construction of any other structures such as boundary walls in the RPA of retained trees and how these relate to existing ground levels; (7) The details of materials and method of construction of any roadway, driveway, parking, pathway or other surfacing within the RPA, which is to be of a 'No Dig' construction method, in accordance with the principles with in Arboricultural Association Guidance Note 12 "The use of cellular confinement systems near trees" and in accordance with current industry best practice; and is appropriate for the type of roadway required in relation to its usage. (8) Provision for the supervision of ANY works within the RPA of trees to be retained, and for the monitoring of continuing compliance with the protective measures specified, by an appropriately qualified arboricultural consultant, to be appointed at the developer's expense and notified to the Local Planning Authority, prior to the commencement of development; and provision for the regular reporting of continued compliance or any departure there from to the Local Planning Authority. Thereafter the development shall be carried out in accordance with the approved details with the agreed measures being kept in place during the entire course of development. Reason: To safeguard trees which are visually important in accordance with Policies ENV1, DES1, and DES2 of the South Oxfordshire Local Plan 2035.

Prior to first occupation, all carbon reduction energy efficiency measures shall be implemented in accordance with the Energy Statement hereby approved and a Verification Report shall be submitted to the Local Planning Authority and approved in writing. The Verification Report shall demonstrate (with photographic evidence) that the energy efficiency measures have been implemented. These measures shall be retained and maintained as such thereafter in accordance with the Energy Statement and Verification Report. Reason: To ensure high standards of sustainable design and construction in accordance with Policy DES10 of the South Oxfordshire Local Plan 2035.
Appeal
No appeal lodged.
Updates