Conditions / Refusal Reasons
Development shall not commence until details of the reserved matters [Appearance, Landscaping Layout and Scale] have been submitted to and approved in writing by the Local Planning Authority.
In the case of any reserved matter, application for approval must be made not later than the expiration of three years beginning with the date of the grant of outline planning permission.
Thereafter the development shall commence not later than whichever is the later of the following dates:
(a) the expiration of three years from the date of this permission; or
(b) the expiration of two years from the final approval of the reserved matters, or in the case of approval on different dates, the final approval of the last such matter to be approved.
Reason: By virtue of Sections 91 to 95 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004.
That the development hereby approved shall be carried out in accordance with the details shown on the following approved plans, 3856-210 Rev G only in so far as it shows the Location Plan and 3856-211S only in so far as it shows details of access, except as controlled or modified by conditions of this permission.
Reason: To secure the proper planning of the area in accordance with Development Plan policies.
Concurrent with the submission of any reserved matters, detailed plans showing the existing and proposed ground levels of the site together with the slab and ridge levels of the proposed development, relative to a fixed datum point on adjoining land outside of the application site, shall be submitted to and approved in writing by the Local Planning Authority. Thereafter the development shall be carried out in accordance with the approved details.
Reason: To ensure a satisfactory form of development in accordance with Policies DES1, DES2, ENV1, H1 and H16 of the South Oxfordshire Local Plan 2035.
Concurrent with the submission of any reserved matters application for layout or scale, details of a mix of dwelling types and sizes to meet the needs of current and future households shall be submitted to and approved in writing by the local planning authority. Thereafter, the development shall be implemented in accordance with the agreed mix.
Reason: In accordance with Policy H11 of the South Oxfordshire Local Plan 2035.
Concurrent with the submission of any reserved matters application, details of a phased programme of works to the Kennylands Gym shall be submitted to and approved in writing by the Local Planning Authority. Thereafter, the development shall proceed in accordance with the approved programme of works, unless otherwise agreed in writing by the Local Planning Authority.
Reason: To ensure satisfactory comprehensive development in accordance with Policies CF4, DES1, DES2 and ENV1 of the South Oxfordshire Local Plan 2035.
Concurrent with the submission of the reserved matters application for appearance, an Energy Statement, including SAP calculations in line with the recognised methodology set by Government, demonstrating how each dwelling within the development will achieve at least a 40% reduction in carbon emissions compared with code 2013 Building Regulations and details of how this will be monitored shall be submitted to the local planning authority and approved in writing.
Reason: To ensure high standards of sustainable design and construction in accordance with Policy DES10 of the South Oxfordshire Local Plan 2035.
The on-site carriageway works shown on drawing no. 3856/211, Rev S, or as otherwise agreed in writing with the Local Planning Authority shall be implemented in full before the first occupation/use of the development or in accordance with a programme of implementation agreed in writing with the Local Planning Authority.
Reason: In the interest of highway safety in accordance with Policy TRANS5 of the South Oxfordshire Local Plan 2035.
Concurrent with the submission of reserved matters for landscaping, a maintenance schedule and a long term management plan for the soft landscaping works, including the details secured by Condition 10, shall be submitted to and approved in writing by the Local Planning Authority. The schedule and plan shall be implemented in accordance with the agreed programme.
Reason: To help to assimilate the development into its surroundings in accordance with Policies ENV1, DES1 and DES2 of the South Oxfordshire Local Plan 2035.
Prior to the commencement of any site works or operations, including demolition and site clearance relating to the development hereby permitted, an Arboricultural Method Statement and accompanying Tree Protection Plan shall be submitted to and approved in writing by the Local Planning Authority.
The Arboricultural Method Statement must include the following:
(1) A specification of any pruning or tree surgery works to any trees to be retained, to prevent accidental damage by construction or demolition activities;
(2) The specification and location of temporary tree protective fencing and any ground protection required to protect all retained trees in accordance with the current edition of BS 5837 ''Trees in relation to design, demolition and construction'', and details of the timing and duration of its erection;
(3) The definition of areas for the storage or stockpiling of materials, temporary on-site parking, site offices and huts, mixing of cement or concrete, and fuel storage;
(4) The means of demolition of any existing site structures, and of the re-instatement of the area currently occupied thereby;
(5) The route and method of installation of drainage or any underground services in the vicinity of retained trees; Consideration will be made to avoid siting of utilities and service runs within the Root Protection Area (RPA) of all trees to be retained. Only where it can be demonstrated that there is no alternative location for the laying of utilities, will encroachment into the RPA be considered. Methodology for any installation works within the RPA will be provided and must be in compliance with the current edition of NJUG 'Guidelines for the planning and installation and maintenance of utility apparatus in proximity to trees'.
(6) The details and method of construction of any other structures such as boundary walls in the RPA of retained trees and how these relate to existing ground levels;
(7) The details of materials and method of construction of any roadway, driveway, parking, pathway or other surfacing within the RPA, which is to be of a 'No Dig' construction method, in accordance with the principles with in Arboricultural Association Guidance Note 12 "The use of cellular confinement systems near trees" and in accordance with current industry best practice; and is appropriate for the type of roadway required in relation to its usage.
(8) Provision for the supervision of ANY works within the RPA of trees to be retained, and for the monitoring of continuing compliance with the protective measures specified, by an appropriately qualified arboricultural consultant, to be appointed at the developer's expense and notified to the Local Planning Authority, prior to the commencement of development; and provision for the regular reporting of continued compliance or any departure there from to the Local Planning Authority.
Thereafter the development shall be carried out in accordance with the approved details with the agreed measures being kept in place during the entire course of development.
Reason: To safeguard trees which are visually important in accordance with Policies ENV1, DES1 and DES2 of the South Oxfordshire Local Plan 2035.
The wildlife corridor shown on the indicative site plan 3856-211 Rev S shall form the safeguarding parameter plan for an Ecological Enhancement Plan (EEP), which responds to the recommendations of Section 4.7 of the PEA report. Concurrent with the reserved matters application for layout or landscaping, the EEP along with an updated Biodiversity Metric Assessment shall be submitted to and approved in writing by the Local Planning Authority. The development shall thereafter proceed in accordance with the approved details. Any variation shall be agreed in writing by the Local Planning Authority before such change is made.
Reason: To ensure that there is no net loss of biodiversity, in accordance with Policies ENV2 and ENV3 of the South Oxfordshire Local Plan 2035.
A construction management plan detailing measures to be taken to protect nearby residents from noise and dust shall be submitted to and approved by the Local Planning Authority prior to the commencement of any construction or demolition works. The hours of operation for such works shall be restricted to 8:00 am - 6.00 pm Monday to Friday and 8.00 am - 1.00 pm on a Saturday. No work shall take place on Sundays or Public Holidays without the prior written authority of the Local Planning Authority. Thereafter, the development shall proceed in accordance with the approved details.
Reason: To ensure that the development is not unneighbourly in accordance with Policy DES6 of the South Oxfordshire Local Plan 2035.
Prior to the commencement of the development a phased risk assessment shall be carried out by a competent person in accordance with current government and Environment Agency Guidance and Approved Codes of Practice such as Land Contamination: Risk Management 2020 and BS10175:2011 +A2:2017 'Investigation of potentially contaminated sites'. Each phase shall be submitted to and approved in writing by the Local Planning Authority.
Phase 2 shall include a comprehensive intrusive investigation in order to characterise the type, nature and extent of contamination present, the risks to receptors and if significant contamination is identified to inform the remediation strategy.
Phase 3 requires that a remediation strategy be submitted to and approved by the LPA to ensure the site will be rendered suitable for its proposed use.
Reason: To ensure that any ground, water and associated gas contamination is identified and adequately addressed to ensure the safety of the development, the environment and to ensure the site is suitable for the proposed use in accordance with Policy ENV11 of the South Oxfordshire Local Plan 2035.
The developer shall confirm in writing to the Local Planning Authority the presence of any unsuspected contamination encountered during the development. In the event of any contamination to the land and/or water being encountered, no development shall continue until a programme of investigation and/or remedial works to include methods of monitoring and certification of such works undertaken. Where land contamination investigation/remedial works are required this must be carried out by a competent person in accordance with current government and Environment Agency Guidance and Approved Codes of Practice such as Land Contamination: Risk Management 2020 and BS10175:2011 +A2:2017 'Investigation of potentially contaminated sites' and submitted to and approved in writing by the local planning authority.
Reason: To ensure that any ground, water and associated gas contamination is identified and adequately addressed to ensure the safety of the development, the environment and to ensure the site is suitable for the proposed use in accordance with Policy ENV11 of the South Oxfordshire Local Plan 2035.
The development shall not be occupied until any previously approved remediation strategy has been carried out in full and a validation report confirming completion of these works has been submitted to and approved in writing by the Local Planning Authority.
Reason: To ensure that any ground, water and associated gas contamination is identified and adequately addressed to ensure the safety of the development, the environment and to ensure the site is suitable for the proposed use in accordance with Policy ENV11 of the South Oxfordshire Local Plan 2035.
No external lighting shall be installed on the site other than in accordance with details, which have first been submitted to and approved in writing by the Local Planning Authority. Details shall include location of the external lights and product specification.
Reason: To protect the appearance of the area, the environment and wildlife, and local residents from light pollution in accordance with Policies ENV1, ENV2, ENV3 and ENV12 of the South Oxfordshire Local Plan 2035.
Prior to the commencement of development, with the exception of any demolition, a full surface water drainage scheme, shall be submitted to, and approved in writing by, the Local Planning Authority. The design of the surface water drainage system will be in accordance with the non-statutory technical standards for sustainable drainage systems, including details of BRE 365 soakage testing/falling head testing, levels, size, position and construction of all drainage works. The drainage scheme shall be sized to accommodate a minimum of the worst case 1 in 30 year storm, with evidence to demonstrate that the site can accommodate the worst case 1:100 year storm + 40% Climate Change storm, without any flows exiting up to this storm event and any storage on site not causing a nuisance or flooding to property. Any borehole soakaway will be sited a minimum of 20 m from any foundations either on or off site unless dynamic probe testing demonstrates that the offset distance can be reduced. A surface water discharge to a Thames Water recorded foul sewer will not be permitted under any circumstance. The development shall be implemented in accordance with the approved details prior to the occupation of the development hereby approved.
Reason: To ensure the proper provision of surface water drainage and to ensure flooding is not exacerbated in the locality in accordance with Policy EP4 of the South Oxfordshire Local Plan 2035.
Prior to the commencement of development, with the exception of any demolition and in accordance with paragraph 4.22 of doc The Dorian Centre SuDS Technical Report Rev B, a discharge permit from the Environment Agency for any borehole soakaway shall be submitted to the Local Planning Authority.
Reason: To ensure the proper provision of surface water drainage and to ensure flooding is not exacerbated in the locality in accordance with Policy EP4 of the South Oxfordshire Local Plan 2035.
Prior to the commencement of development, with the exception of any demolition, a construction phase surface water management strategy scheme shall be submitted to and approved in writing by the Local Planning Authority. The strategy must demonstrate how surface water will be managed throughout the construction phase. The development shall be implemented in accordance with the approved details.
Reason: To ensure the proper provision of surface water drainage and to ensure flooding is not exacerbated in the locality in accordance with Policy EP4 of the South Oxfordshire Local Plan 2035.
Prior to the commencement of development, with the exception of any demolition, a full foul water drainage scheme shall be submitted to and approved in writing by the Local Planning Authority. The drainage scheme shall be designed in accordance with Thames Waters design and construction guidance and include details of method, levels, size, position and construction of the drainage scheme. The development shall be implemented in accordance with the approved details prior to the occupation of the development hereby approved.
Reason: To ensure the proper provision of foul water drainage and to ensure flooding and pollution is not exacerbated in the locality in accordance with policy EP4 of the South Oxfordshire Local Plan 2035.
Prior to the occupation of any dwelling, a SUDS compliance report prepared by an appropriately qualified engineer must be submitted to and approved by the Local Planning Authority. This report shall evidence that a sustainable drainage system has been installed and completed in accordance with the approved scheme (or detail any minor variations). This report should as a minimum cover the following;
1) Inclusion of as-built drawings in AOD. Levels of all drainage works and FFL must be included. As-built drawings must be provided in PDF and DWG format.
2) Inspection details of SUDS features such as flow controls, storage features and volumes and critical linking features or pipework undertaken, with appropriate photographs and evidence of inspections incorporated,
3) Maintenance responsibilities,
4) Details of any remediation works required following the initial inspection,
5) Evidence that that remedial works have been completed,
6) Full CCTV survey of the whole network.
Reason: To ensure the proper provision of surface water drainage and to ensure flooding and pollution is not exacerbated in the locality in accordance with policy EP4 of the South Oxfordshire Local Plan 2035.
Prior to the occupation of any dwellings, a foul water drainage compliance report prepared by an appropriately qualified engineer must be submitted to and approved by the Local Planning Authority. This must suitably demonstrate that the foul water drainage system has been installed and completed in accordance with the approved scheme (or detail any minor variations). This report should as a minimum cover the following;
1) Inclusion of as-built drawings in DWG or DXF format,
2) Inspection details of key foul water drainage features such as the manhole chambers, and critical linking features or pipework undertaken, with appropriate photographs and evidence of inspections incorporated,
3) Details of any remediation works required following the initial inspection,
4) Evidence that that remedial works have been completed,
5) CCTV survey.
Reason: To ensure the proper provision of foul water drainage and to ensure flooding and pollution is not exacerbated in the locality in accordance with policy EP4 of the South Oxfordshire Local Plan 2035.
Prior to the first occupation of the development hereby approved, an Electric Vehicle Charging Point shall be installed for each dwelling and thereafter retained as such.
Reason: To ensure sustainable forms of transport in accordance with Policies TRANS5, ENV12 and EP1 of the South Oxfordshire Local Plan 2035.