Planning Application Details

P22/S2723/FULApplication Type: Full Application (Show Map - opens in new window)
Status Bar
 
 Completed stage
 
 Current stage
 
 Next stage
Application registered
Consultation period
Application under consideration
Decision made
Description
Construction of a replacement dwelling house and ancillary accommodation. Relocation of tennis court. (Revised scheme to that approved in 2020 under application ref. P20/S1372/FUL)
Location
Highwood Greenfield OX49 5HG
Grid Reference
470784/191785
Applicant
Mr M Spink
4 Syon Gate Way
Brentford
TW8 9DD
Agent
TJR Planning
Suite 3 The Mansion
Wall Hall Drive
Aldenham
WD25 8BZ
Case Officer
Simon Kitson
Telephone: 01235 422600
Email: planning@southoxon.gov.uk
Consultation / Notification
No further Representations on this application will be accepted.

Consultations / Notifications to date are shown below.

Name / Number
Date Sent
Response Date
 
Watlington Parish Council
c/o Ms K Tynan
Watlington Parish Office
1 Old School Place
Gorwell
WATLINGTON, Oxon
OX49 5QH
04 08 2022
08 09 2022
 
Chilterns Conservation Board
04 08 2022
 
CPRE South Oxfordshire District Committee
04 08 2022
10 08 2022
 
South and Vale Countryside Officer
04 08 2022
05 10 2022
 
Drainage - (South&Vale)
04 08 2022
02 09 2022
 
Forestry Officer (South and Vale)
04 08 2022
09 09 2022
 
South -Highways Liaison Officer (Oxfordshire County Council)
04 08 2022
23 08 2022
 
Landscape Architect (South and Vale)
04 08 2022
27 09 2022
 
Highwood Lodge
Greenfield
Christmas Common
Watlington
OX49 5HG
03 08 2022
 
Energy Assessor (ESE Ltd)
04 08 2022
08 08 2022
 
Application Type
Minor (Full Application)
Application Progress
Date Received  
25th July 2022
Registration Date  
2nd August 2022
Start Consultation Period  
3rd August 2022
End Consultation Period  
24th August 2022
Target Decision Date  
19th October 2022
Decision
Planning Permission on 19th October 2022
Conditions / Refusal Reasons
The development to which this permission relates must be begun not later than the expiration of three years beginning with the date of this permission. Reason: By virtue of Sections 91 to 95 of the Town and Country Planning Act 1990 as amended by section 51 of the Planning and Compulsory Purchase Act 2004. Related application(s): P23/S0739/DIS

No development above slab level shall take place until a photographic schedule of all materials to be used in the external construction and finishes of the development hereby permitted has been submitted to and approved in writing by the Local Planning Authority. Reason: In the interests of the visual appearance of the development in accordance with Policies DES1 and DES2 of the South Oxfordshire Local Plan 2035.

Prior to the first occupation of the development hereby approved, the parking and turning areas shall be provided in accordance with the approved site plan and shall be constructed, laid out, surfaced, drained and completed to be compliant with sustainable drainage (SuDS) principles, and shall be retained unobstructed except for the parking of vehicles associated with the development at all times. Reason: In the interests of highway safety and in accordance with Policy TRANS5 of the South Oxfordshire Local Plan 2035.

Prior to the commencement of development, except for any demolition, a full surface water drainage scheme shall be submitted to and approved in writing by the Local Planning Authority. The development shall be carried out in accordance with the approved details prior to the first occupation of the development hereby approved. Reason: To prevent pollution and flooding in accordance with Policies ENV12 and EP4 of the South Oxfordshire Local Plan 2035.

Prior to the commencement of development, except for any demolition, a full foul water drainage scheme shall be submitted to and approved in writing by the Local Planning Authority. The development shall be carried out in accordance with the approved details prior to the first occupation of the development hereby approved. Reason: To ensure the proper provision of foul water drainage and to ensure flooding and pollution is not exacerbated in the locality in accordance with policy EP4 of the South Oxfordshire Local Plan 2035.

Prior to the construction of any development above slab level a scheme for the landscaping of the site, including the planting of live trees and shrubs, shall be submitted to and approved in writing by the Local Planning Authority. These details shall include schedules of new trees and shrubs to be planted (noting species, plant sizes and numbers/densities), the identification of the existing trees and shrubs on the site to be retained (noting species, location and spread), any earth moving operations and finished levels/contours, and an implementation programme. The scheme shall be implemented prior to the first occupation or use of the development hereby approved and thereafter be maintained in accordance with the approved scheme. In the event of any of the trees or shrubs so planted dying or being seriously damaged or destroyed within 5 years of the completion of the development, a new tree or shrub or equivalent number of trees or shrubs, as the case may be, of a species first approved by the Local Planning Authority, shall be planted and properly maintained in a position or positions first approved in writing by the Local Planning Authority. Reason: To help to assimilate the development into its surroundings in accordance with Policies ENV1, DES1 and DES2 of the South Oxfordshire Local Plan 2035.

Prior to the commencement of any site works or operations, including demolition and site clearance relating to the development hereby permitted, an Arboricultural Method Statement and accompanying Tree Protection Plan shall be submitted to and approved in writing by the Local Planning Authority. The Arboricultural Method Statement must include the following: (1) A specification of any pruning or tree surgery works to any trees to be retained, to prevent accidental damage by construction or demolition activities; (2) The specification and location of temporary tree protective fencing and any ground protection required to protect all retained trees in accordance with the current edition of BS 5837 ''Trees in relation to design, demolition and construction'', and details of the timing and duration of its erection; (3) The definition of areas for the storage or stockpiling of materials, temporary on-site parking, site offices and huts, mixing of cement or concrete, and fuel storage; (4) The means of demolition of any existing site structures, and of the re-instatement of the area currently occupied thereby; (5) The route and method of installation of drainage or any underground services in the vicinity of retained trees; Consideration will be made to avoid siting of utilities and service runs within the Root Protection Area (RPA) of all trees to be retained. Only where it can be demonstrated that there is no alternative location for the laying of utilities, will encroachment into the RPA be considered. Methodology for any installation works within the RPA will be provided and must be in compliance with the current edition of NJUG 'Guidelines for the planning and installation and maintenance of utility apparatus in proximity to trees'. (6) The details and method of construction of any other structures such as boundary walls in the RPA of retained trees and how these relate to existing ground levels; (7) The details of materials and method of construction of any roadway, driveway, parking, pathway or other surfacing within the RPA, which is to be of a 'No Dig' construction method, in accordance with the principles with in Arboricultural Association Guidance Note 12 "The use of cellular confinement systems near trees" and in accordance with current industry best practice; and is appropriate for the type of roadway required in relation to its usage. (8) Provision for the supervision of ANY works within the RPA of trees to be retained, and for the monitoring of continuing compliance with the protective measures specified, by an appropriately qualified arboricultural consultant, to be appointed at the developer's expense and notified to the Local Planning Authority, prior to the commencement of development; and provision for the regular reporting of continued compliance or any departure there from to the Local Planning Authority. Thereafter the development shall be carried out in accordance with the approved details with the agreed measures being kept in place during the entire course of development. Reason: To safeguard trees which are visually important in accordance with Policies ENV1, DES1, and DES2 of the South Oxfordshire Local Plan 2035.

Prior to any works of construction above slab level, details of all biodiversity enhancement measures shall be submitted to, and agreed in writing by, the Local Planning Authority. The measures shall be fully implemented prior to first occupation of the development. Reason: To ensure that the development delivers a net gain in biodiversity, in accordance with Policies ENV2 and ENV3 of the South Oxfordshire Local Plan 2035.

The development hereby permitted shall be implemented in accordance with the recommendations under Section 5 of the submitted Preliminary Ecological Assessment (ASW Ecology, ASW/SP/026/26/2022) in all respects. Any variation shall be agreed in writing by the Local Planning Authority before such change is made. Reason: To protect the important species on the site, in accordance with Policies ENV2 and ENV3 of the South Oxfordshire Local Plan 2035.

No external lighting shall be installed on the site other than in accordance with details, which have first been submitted to and approved in writing by the Local Planning Authority. Details shall include location of the external lights and product specification. Reason: To protect the appearance of the area, the environment and wildlife, and local residents from light pollution in accordance with Policies ENV1, ENV2, ENV3 and ENV12 of the South Oxfordshire Local Plan 2035.

Prior to first occupation, all carbon reduction energy efficiency measures shall be implemented in accordance with the Energy Statement hereby approved and a Verification Report shall be submitted to the Local Planning Authority and approved in writing. The Verification Report shall demonstrate (with photographic evidence) that the energy efficiency measures have been implemented. These measures shall be retained and maintained as such thereafter in accordance with the Energy Statement and Verification Report. Reason: To ensure high standards of sustainable design and construction in accordance with Policy DES10 of the South Oxfordshire Local Plan 2035.

Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 2015 (or any Order revoking or re-enacting that Order) the provision within the curtilage of the dwelling of any building, enclosure or swimming pool as described in Schedule 2, Part 1, Class E of the Order shall not be undertaken without obtaining planning permission from the Local Planning Authority. Reason: To safeguard the amenities of the occupiers of the adjoining properties and the character of the area in accordance with Policies DES1, DES2 and DES6 of the South Oxfordshire Local Plan 2035.

Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 2015 (or any Order revoking or re-enacting that Order), the enlargement, improvement or other alteration of any dwellinghouse as described in Schedule 2, Part 1, Class A of the Order shall not be undertaken without obtaining planning permission from the Local Planning Authority. Reason: To safeguard the amenities of the occupiers of the adjoining properties and the character of the area in accordance with Policies DES1, DES2 and DES6 of the South Oxfordshire Local Plan 2035.
Appeal
No appeal lodged.
Updates
These Planning Application Details were returned live from our back office database, and as such are as up to date as when the page was retrieved.