Planning Application Details

P22/S4238/FULApplication Type: Full Application (Show Map - opens in new window)
Status Bar
 
 Completed stage
 
 Current stage
 
 Next stage
Application registered
Consultation period
Application under consideration
Decision made
Description
Removal of existing steel framed Dutch barn and replacement with three two-bedroom dwellings with parking and amenity space. Provision of new pedestrian link into Sonning Common. (Further ecological information received 26th January 2023)
Location
Bishopswood Farm Reade's Lane Gallowstree Common RG4 9DR
Grid Reference
470002/180190
Applicant
Investfront Ltd
c/o agent
Agent
Davis Planning Ltd
19  Woodlands Avenue
Wokingham
RG41 3HL
Case Officer
Simon Kitson
Telephone: 01235 422600
Email: planning@southoxon.gov.uk
Consultation / Notification
No further Representations on this application will be accepted.

Consultations / Notifications to date are shown below.

Name / Number
Date Sent
Response Date
 
Sonning Common Parish Council
Philip Collings (Parish Clerk)
Village Hall
Wood Lane
Sonning Common
Oxon
RG4 9SL
30 11 2022
21 12 2022
 
South and Vale Countryside Officer
30 01 2023
07 03 2023
 
Drainage - (South&Vale)
30 11 2022
19 12 2022
 
Forestry Officer (South and Vale)
30 11 2022
06 12 2022
 
South -Highways Liaison Officer (Oxfordshire County Council)
01 12 2022
19 12 2022
 
Contaminated Land
30 11 2022
14 12 2022
 
SGN Plant Protection Team
30 11 2022
30 11 2022
 
Waste Management Officer (District Council)
30 11 2022
19 12 2022
 
4 Pearman Place
Sonning Common
Reading
RG4 9DW
30 11 2022
 
Energy Assessor (ESE Ltd)
30 11 2022
13 12 2022
 
Application Type
Minor (Full Application)
Application Progress
Date Received  
22nd November 2022
Registration Date  
22nd November 2022
Start Consultation Period  
30th November 2022
End Consultation Period  
21st December 2022
Target Decision Date  
17th January 2023
Decision
Planning Permission on 7th March 2023
Conditions / Refusal Reasons
The development to which this permission relates must be begun not later than the expiration of three years beginning with the date of this permission. Reason: By virtue of Sections 91 to 95 of the Town and Country Planning Act 1990 as amended by section 51 of the Planning and Compulsory Purchase Act 2004.

That the development hereby approved shall be carried out in accordance with the details shown on the following approved plans, 22-P058-08, 22-P058-06, 22-P058-05, 22-P058-04, 22-P058-02, 22-P058-03, 22-P058-01 Rev A and 22-P058-07, except as controlled or modified by conditions of this permission. Reason: To secure the proper planning of the area in accordance with Development Plan policies.

No development above slab level shall take place until a photographic schedule of all materials to be used in the external construction and finishes of the development hereby permitted has been submitted to and approved in writing by the Local Planning Authority. Reason: In the interests of the visual appearance of the development in accordance with Policies DES1 and DES2 of the South Oxfordshire Local Plan 2035.

Prior to the commencement of the development a phased risk assessment shall be carried out by a competent person in accordance with current government and Environment Agency Guidance and Approved Codes of Practice such as Land Contamination: Risk Management 2020 and BS10175:2011 +A2:2017 'Investigation of potentially contaminated sites'. Each phase shall be submitted to and approved in writing by the Local Planning Authority. Phase 1 shall incorporate a desk study and site walk over to identify all potential contaminative uses on site, and to inform the conceptual site model. If potential contamination is identified in Phase 1 then a Phase 2 investigation shall be undertaken. Phase 2 shall include a comprehensive intrusive investigation in order to characterise the type, nature and extent of contamination present, the risks to receptors and if significant contamination is identified to inform the remediation strategy. Phase 3 requires that a remediation strategy be submitted to and approved by the LPA to ensure the site will be rendered suitable for its proposed use. Reason: To ensure that any ground, water and associated gas contamination is identified and adequately addressed to ensure the safety of the development, the environment and to ensure the site is suitable for the proposed use in accordance with Policy ENV11 of the South Oxfordshire Local Plan 2035.

The development shall not be occupied until any previously approved remediation strategy has been carried out in full and a validation report confirming completion of these works has been submitted to and approved in writing by the Local Planning Authority. Reason: To ensure that any ground, water and associated gas contamination is identified and adequately addressed to ensure the safety of the development, the environment and to ensure the site is suitable for the proposed use in accordance with Policy ENV11 of the South Oxfordshire Local Plan 2035.

Prior to the commencement of development, with the exception of any demolition, a full surface water drainage scheme following the surface water drainage hierarchy as set out in Ciria C753 and by providing infiltration testing undertaken in accordance with BRE 365, shall be submitted to, and approved in writing by, the Local Planning Authority. The design of the surface water drainage system will be in accordance with the non-statutory technical standards for sustainable drainage systems, including details of the levels, size, position and construction of drainage works. The drainage scheme shall be sized to accommodate a minimum of the worst case 1 in 30 year storm, with evidence to demonstrate that the site can accommodate the worst case 1:100 year storm + 40% Climate Change storm, without any flows exiting up to this storm event and any storage on site not causing a nuisance or flooding to property. The approved scheme shall be implemented in accordance with the approved details prior to the occupation of the development hereby approved. Reason: To prevent pollution and flooding in accordance with Policies ENV12 and EP4 of the South Oxfordshire Local Plan 2035.

Prior to the commencement of development, a full foul water drainage scheme shall be submitted to and approved in writing by the Local Planning Authority. The development shall be carried out in accordance with the approved details prior to the first occupation of the development hereby approved.The scheme shall include details of the size, position and construction of the drainage scheme. Reason: To ensure the proper provision of foul water drainage and to ensure flooding and pollution is not exacerbated in the locality in accordance with policy EP4 of the South Oxfordshire Local Plan 2035.

Prior to the commencement of any site works (including demolition or site clearance) a protected area shall be designated for all existing trees which are shown to be retained, and the trees shall be protected in accordance with a scheme which complies with the current edition of BS 5837: "Trees in relation to design, demolition and construction" that shall first have been submitted to, and approved in writing by, the Local Planning Authority. The agreed measures shall be kept in place during the entire course of development. Reason: To safeguard trees which are visually important in accordance with Policies ENV1, DES1, and DES2 of the South Oxfordshire Local Plan 2035.

Prior to the construction of any development above slab level a scheme for the landscaping of the site, including the planting of live trees and shrubs, boundary treatments and the treatment of the access road and hard standings, shall be submitted to and approved in writing by the Local Planning Authority prior to the commencement of the development hereby permitted. These details shall include schedules of new trees and shrubs to be planted (noting species, plant sizes and numbers/densities), the identification of the existing trees and shrubs on the site to be retained (noting species, location and spread), any earth moving operations and finished levels/contours, and an implementation programme. The scheme shall be implemented prior to the first occupation or use as approved within 12 months of the commencement of the approved development and thereafter be maintained in accordance with the approved scheme. In the event of any of the trees or shrubs so planted dying or being seriously damaged or destroyed within 5 years of the completion of the development, a new tree or shrub or equivalent number of trees or shrubs, as the case may be, of a species first approved by the Local Planning Authority, shall be planted and properly maintained in a position or positions first approved in writing by the Local Planning Authority. Reason: To help to assimilate the development into its surroundings in accordance with Policies ENV1, DES1 and DES2 of the South Oxfordshire Local Plan 2035.

Prior to the occupation of the development, details of biodiversity enhancements, to include integral bird and bat boxes, tiles or bricks in each of the new buildings and native and wildlife friendly landscaping (including gaps at the bases of fences to allow hedgehogs to traverse between the gardens), shall be submitted to and approved in writing by the council. The development shall thereafter be implemented in accordance with the approved details. Reason: To ensure that there is no net loss of biodiversity, in accordance with Policies ENV2 and ENV3 of the South Oxfordshire Local Plan 2035 and Paragraphs 179-180 of the National Planning Policy Framework.

No external lighting shall be installed on the site other than in accordance with details, which have first been submitted to and approved in writing by the Local Planning Authority. Details shall include location of the external lights and product specification. Reason: To protect the appearance of the area, the environment and wildlife, and local residents from light pollution in accordance with Policies ENV1, ENV2, ENV3 and ENV12 of the South Oxfordshire Local Plan 2035.

Prior to the commencement of any works of construction above slab level, full details of the proposed construction and surfacing for the footpath connection leading to Pearmans place shall be submitted to, and approved in writing by, the Local Planning Authority. The development shall not be occupied until the approved works have been fully implemented. The footpath shall be retained unobstructed thereafter. Reason: In the interests of pedestrian safety and convenience in accordance with Policies TRANS2 and TRANS5 of the South Oxfordshire Local Plan 2035.

Prior to the first occupation of the development hereby approved, the parking and turning areas shall be provided in accordance with the approved plan (22-P058-01A) and shall be constructed, laid out, surfaced, drained and completed to be compliant with sustainable drainage (SuDS) principles, and shall be retained unobstructed except for the parking of vehicles associated with the development at all times. Reason: In the interests of highway safety and in accordance with Policy TRANS5 of the South Oxfordshire Local Plan 2035.

The vision splays shown on the approved plan (22-P058-03) shall not be obstructed by any object, structure, planting or other material with a height exceeding or growing above 0.9m as measured from carriageway level. Reason: In the interest of highway safety in accordance with Policy TRANS5 of the South Oxfordshire Local Plan 2035.

Prior to first occupation, all carbon reduction energy efficiency measures shall be implemented in accordance with the Energy Statement hereby approved and a Verification Report shall be submitted to the Local Planning Authority and approved in writing. The Verification Report shall demonstrate (with photographic evidence) that the energy efficiency measures have been implemented. These measures shall be retained and maintained as such thereafter in accordance with the Energy Statement and Verification Report. Reason: To ensure high standards of sustainable design and construction in accordance with Policy DES10 of the South Oxfordshire Local Plan 2035.
Appeal
No appeal lodged.