Description
Proposed demolition of the existing garage and conservatory, and the erection of two-storey side and rear extension. Subsequent subdivision to provide new two-storey two bed dwelling. Provision of amenity space and off-street parking with new highway access off Elton Crescent.
Conditions / Refusal Reasons
The development to which this permission relates must be begun not later than the expiration of three years beginning with the date of this permission.
Reason: By virtue of Sections 91 to 95 of the Town and Country Planning Act 1990 as amended by section 51 of the Planning and Compulsory Purchase Act 2004.
That the development hereby approved shall be carried out in accordance with the details shown on the following approved plans, 21-033-SU01, 21-033-P21, 21-033-P20 and 21-033-L01A, except as controlled or modified by conditions of this permission.
Reason: To secure the proper planning of the area in accordance with Development Plan policies.
No development shall commence, except for demolition and site clearance until a full surface water drainage scheme, including details of the size, position and construction of drainage works have been submitted to, and approved in writing by, the Local Planning Authority. The drainage scheme shall be designed to accommodate a 1 in 100 year storm + 40% CC and shall be implemented in accordance with the approved details prior to the occupation of the dwellings hereby approved.
Reason: To ensure the proper provision of surface water drainage and to ensure flooding is not exacerbated in the locality in accordance with policy EP4 of the South Oxfordshire Local Plan 2035.
No above ground development (with the exception of demolition works) shall commence until details of all boundary walls, fences and any other means of enclosure have been submitted to and approved in writing by the Local Planning Authority. All such approved means of enclosure shall be erected prior to the first occupation of the development.
Reason: In the interests of the visual appearance of the development in accordance with Policies DES1 and DES2 of the South Oxfordshire Local Plan 2035.
Prior to the first occupation of the dwelling hereby approved, the parking and turning areas shall be provided in accordance with the approved plan (21-033-P01 B) and shall be constructed, laid out, surfaced, drained and completed to be compliant with sustainable drainage (SuDS) principles, and shall be retained unobstructed except for the parking of vehicles associated with the development at all times.
Reason: In the interests of highway safety and in accordance with policy TRANS5 of the South Oxfordshire Local Plan 2035.
Prior to the first occupation of the development vision splays measuring 2.0 metres by 2.0 metres shall be provided to each side of the access and the vision splays shall not be obstructed by any object, structure, planting or other material with a height exceeding or growing above 0.9 metres as measured from carriageway level.
Reason: In the interest of highway safety in accordance with Policy TRANS5 of the South Oxfordshire Local Plan 2035.
Prior to the first occupation of the dwelling, the proposed means of access onto Elton Crescent shall be formed and laid out and constructed strictly in accordance with the local highway authority's specifications and all ancillary works specified shall be undertaken.
Reason: In the interest of highway safety in accordance with policy TRANS5 of the South Oxfordshire Local Plan 2035.
Prior to the first occupation of the dwelling, the existing means of access onto Elton Crescent shall be improved and laid out and constructed strictly in accordance with the local highway authority's specifications and all ancillary works specified shall be undertaken.
Reason: In the interest of highway safety in accordance with policy TRANS5 of the South Oxfordshire Local Plan 2035.
Prior to the first occupation of the dwelling hereby approved an Electric Vehicle Charging Point shall be installed.
Reason: To ensure sustainable forms of transport are provided in accordance with Policy DES8 of the South Oxfordshire Local Plan 2035.
Prior to first occupation, all carbon reduction energy efficiency measures shall be implemented in accordance with the Energy Statement and SAP calculations (produced by MH Energy Consultants dated 20 February 2022) hereby approved and a Verification Report shall be submitted to the Local Planning Authority and approved in writing. The Verification Report shall demonstrate (with photographic evidence) that the energy efficiency measures have been implemented. These measures shall be retained and maintained as such thereafter in accordance with the Energy Statement and Verification Report.
Reason: To ensure high standards of sustainable design and construction in accordance with Policy DES10 of the South Oxfordshire Local Plan 2035.
The development hereby permitted shall only be constructed in the materials specified on the plan hereby approved or in materials which shall previously have been approved in writing by the Local Planning Authority.
Reason: In the interests of the visual appearance of the development in accordance with policies DES1 and DES2 of the South Oxfordshire Local Plan 2035.
Notwithstanding the provisions of Class A of Part 1 Schedule 2 of the Town and Country Planning (General Permitted Development) Order 2015 (or the equivalent provisions of any order revoking and re-enacting that Order), there shall be no extension to the dwelling hereby permitted without the prior grant of planning permission.
Reason: To safeguard the amenities of the occupiers of the adjoining properties and the character of the area in accordance with Policies DES1, DES2 and DES6 of the South Oxfordshire Local Plan 2035.