Planning Application Details

P22/S3382/FULApplication Type: Full Application (Show Map - opens in new window)
Status Bar
 
 Completed stage
 
 Current stage
 
 Next stage
Application registered
Consultation period
Application under consideration
Decision made
Description
Demolition of existing sheds and garage and construction of two bedroom house. (As clarified by drawing no ABBT.P10F received 25 October 2022).
Location
88 Abbott Road Didcot OX11 8HY
Grid Reference
/
Applicant
Mr Jim Marsh
88 Abbott Road
Didcot
OX11 8HY
Agent
Duncan Wolage Architects Ltd
Room 19
Boston House
Grove Business Park
Wantage
OX12 9FF
Case Officer
Kim Gould
Telephone: 01235 422600
Email: planning@southoxon.gov.uk
Consultation / Notification
No further Representations on this application will be accepted.

Consultations / Notifications to date are shown below.

Name / Number
Date Sent
Response Date
 
Didcot Town Council
Council Offices
Britwell Road
DIDCOT
Oxon
OX11 7JN
24 09 2022
06 10 2022
 
1 Glebe Road
Didcot
OX11 8PL
23 09 2022
 
88 Abbott Road
Didcot
OX11 8HY
23 09 2022
 
88A Abbott Road
Didcot
OX11 8HY
23 09 2022
05 10 2022
 
86 Abbott Road
Didcot
OX11 8HY
23 09 2022
 
South -Highways Liaison Officer (Oxfordshire County Council)
24 09 2022
07 10 2022
 
Energy Assessor (ESE Ltd)
24 09 2022
29 09 2022
 
Application Type
Minor (Full Application)
Application Progress
Date Received  
15th September 2022
Registration Date  
15th September 2022
Start Consultation Period  
23rd September 2022
End Consultation Period  
14th October 2022
Target Decision Date  
10th November 2022
Decision
Planning Permission on 25th October 2022
Conditions / Refusal Reasons
The development to which this permission relates must be begun not later than the expiration of three years beginning with the date of this permission. Reason: By virtue of Sections 91 to 95 of the Town and Country Planning Act 1990 as amended by section 51 of the Planning and Compulsory Purchase Act 2004.

That the development hereby approved shall be carried out in accordance with the details shown on the following approved plans, ABBT.P10F, except as controlled or modified by conditions of this permission. Reason: To secure the proper planning of the area in accordance with Development Plan policies.

The exterior of the development hereby permitted shall only be constructed in the materials specified on the plans/supporting documents hereby approved or in materials which shall previously have been approved in writing by the Local Planning Authority. Reason: In the interests of the visual appearance of the development in accordance with Policies DES1 and DES2 of the South Oxfordshire Local Plan 2035.

Prior to occupation of the development hereby permitted the proposed means of access onto 'Glebe Road' is to be formed and laid out and constructed strictly in accordance with the local highway authority's specifications and all ancillary works specified shall be undertaken. Reason: In the interest of highway safety in accordance with Policy TRANS5 of the South Oxfordshire Local Plan 2035.

Before the proposed access is first used, the existing access onto 'Glebe Road', shall be permanently stopped up by the means of reinstatement of the highway verge and proposed planting to the approval of the Local Planning Authority and in accordance with the local highway authority's specifications. Thereafter the closed access shall not be used by any vehicular traffic whatsoever. Reason: In the interest of highway safety in accordance with Policy TRANS5 of the South Oxfordshire Local Plan 2035.

The vision splays shown on drawing no. ABBT.P10, Rev F, shall not be obstructed by any object, structure, planting or other material with a height exceeding or growing above 0.6 metres as measured from carriageway level. Reason: In the interest of highway safety in accordance with Policy TRANS5 of the South Oxfordshire Local Plan 2035.

Prior to the first occupation of the development, hereby approved, the parking and turning areas shall be provided in accordance with drawing no. ABBT.P10, Rev F, and shall be constructed, laid out, surfaced, drained and completed to be compliant with sustainable drainage (SuDS) principles, and shall be retained unobstructed except for the parking of vehicles associated with the development at all times. Reason: In the interests of highway safety and in accordance with Policy TRANS5 of the South Oxfordshire Local Plan 2035.

Prior to the first occupation of the dwelling hereby approved, an Electric Vehicle Charging Point shall have been provided on the site for use by occupants. Thereafter the Electric Vehicle Charging Point shall be implemented prior to the occupation of the dwelling it would serve. Reason: To ensure sustainable forms of transport are provided in accordance with Policy TRANS5 of the South Oxfordshire Local Plan 2035.

Prior to the commencement of development, with the exception of any demolition, a full surface water drainage scheme in accordance with the surface water drainage hierarchy as set out in Part H of the Building Regulations, including details of the size, position and construction of drainage works, shall be submitted to, and approved in writing by, the Local Planning Authority. The drainage scheme shall be designed to accommodate a 1 in 100 year storm + 40% CC and shall be implemented in accordance with the approved details prior to the occupation of the development hereby approved. Reason: To ensure the proper provision of surface water drainage and to ensure flooding is not exacerbated in the locality in accordance with Policies ENV12 and EP4 of the South Oxfordshire Local Plan 2035. .

The first floor bathroom windows in the southern and northern elevations of the building hereby permitted shall be glazed in obscure glass with a minimum of level 3 obscurity, and shall be fixed shut with the exception of a top hung openable fanlight (or other means of opening to be first agreed in writing by the Local Planning Authority) prior to the first occupation of the accommodation and it shall be retained as such thereafter. Reason: To ensure that the development is not unneighbourly in accordance with Policy DES6 of the South Oxfordshire Local Plan 2035.

Prior to first occupation, all carbon reduction energy efficiency measures shall be implemented in accordance with the Energy Statement hereby approved and a Verification Report shall be submitted to the Local Planning Authority and approved in writing. The Verification Report shall demonstrate (with photographic evidence) that the energy efficiency measures have been implemented. These measures shall be retained and maintained as such thereafter in accordance with the Energy Statement and Verification Report. Reason: To ensure high standards of sustainable design and construction in accordance with Policy DES10 of the South Oxfordshire Local Plan 2035.

Prior to the first occupation of the dwellings hereby approved, a bat box and a bird box shall be provided for each flat and thereafter retained. Reason: To increase biodiversity within the site in accordance with policy ENV3 of the SOLP.

That within 6 months of the first occupation of the dwelling hereby approved, the planting as shown on plan ref ABBT.P1OF shall have been completed and thereafter retained. Reason: To help to assimilate the development into its surroundings in accordance with Policies ENV1, DES1 and DES2 of the South Oxfordshire Local Plan 2035.

Notwithstanding the provisions of the Town and Country (General Permitted Development Order) 2015 (or any Order revoking or re-enacting that Order), no development as specified in Schedule 2, Part 1, Classes A,B,C and E shall be undertaken without obtaining planning permission from the Local Planning Authority. Reason: The specific circumstances of this site warrant the Local Planning Authority having control over any further development as specified in the condition to safeguard the amenities of the occupiers of the adjoining properties and the character of the area in accordance with Policies DES1, DES2 and DES6 of the South Oxfordshire Local Plan 2035.
Appeal
No appeal lodged.
Updates
These Planning Application Details were returned live from our back office database, and as such are as up to date as when the page was retrieved.