The development to which this permission relates must be begun not later than the expiration of three years beginning with the date of this permission.
Reason: By virtue of Sections 91 to 95 of the Town and Country Planning Act 1990 as amended by section 51 of the Planning and Compulsory Purchase Act 2004.
Related application(s):
P22/S4198/DISThat the development hereby approved shall be carried out in accordance with the details shown on the following approved plans, 20041 206 G, 20041 272 G, 20041 236 G, 20041 216 G, 20041 215 H, 20041 235 H, 20041 211 G, 20041 231 G, 20041 271 G, 20041 210 G, 20041 230 G, 20041 212 G, 20041 232 G, 0041/205 rev O and 20041/170 rev I, except as controlled or modified by conditions of this permission.
Reason: To secure the proper planning of the area in accordance with Development Plan policies.
Related application(s):
P22/S4198/DISThat the development shall, unless otherwise agreed in writing beforehand with the Local Planning Authority (LPA), be carried out in phases as follows:
1. Demolition of the existing buildings on site and removal of associated hard surfaces and supporting
engineering works (other than those required for the development hereby permitted)
2. Construction of Plot 1
3. Construction of Plot 2
The developer(s) shall before commencing each phase notify the LPA of the date of commencement of each phase by exchange of letter/email.
Reason: To allow flexibility in delivering the scheme and opportunity for potential self-build or custom build dwellings.
Related application(s):
P22/S4198/DISThe development must be implemented strictly in accordance with the contaminated land remediation strategy set out in the report approved under application ref: P22/S1859/DIS. Prior to first occupation of the development hereby approved, a verification report that demonstrates the effectiveness of the remediation carried out must be submitted to, and approved in writing by, the Local Planning Authority.
Reason: To ensure that any ground, water and associated gas contamination is identified and adequately addressed to ensure the safety of the development, the environment and to ensure the site is suitable for the proposed use in accordance with Policy ENV11 of the South Oxfordshire Local Plan 2035.
Related application(s):
P22/S4198/DISPrior to the commencement of any works of construction, a photographic schedule of all external materials and finishes shall be submitted to and approved in writing by the Local Planning Authority. Thereafter, the works shall be implemented in accordance with the approved details, unless otherwise agreed in writing by the Local Planning Authority.
Reason: In the interests of the visual appearance of the development in accordance with Policies DES1,DES2 or ENV1 of the South Oxfordshire Local Plan 2035.
Related application(s):
P22/S4198/DISPrior to the commencement of any works of construction, details of the specification of the external glazing for all windows on the south east (main road facing) elevation shall be submitted to and approved in writing by the Local Planning Authority. For the avoidance of doubt, this condition requires the provision of a scheme to minimise visible light transmittance from inside to out. Thereafter, the glazing approved shall be installed and maintained in perpetuity in accordance with the approved details, unless otherwise agreed in writing by the Local Planning Authority.
Reason: To protect the appearance of the area, the environment and wildlife, and local residents from light pollution in accordance with Policies ENV1, and ENV12 of the South Oxfordshire Local Plan 2035.
The tree protection details as described within the submitted Tree Survey Report, Impact Appraisal, Tree Protection Details report shall be put in place prior to the commencement of each phase of development on site, including any works of demolition, and thereafter retained in situ for the duration of each phase of development.
Reason: To safeguard trees which are visually important in accordance with Policies ENV1, DES1, and DES2 of the South Oxfordshire Local Plan 2035.
Prior to first occupation of each dwelling, all carbon reduction energy efficiency measures shall be implemented in accordance with the Energy Statement hereby approved. Each Verification Report shall be submitted to the Local Planning Authority and approved in writing. Each Verification Report shall demonstrate (with photographic evidence) that the energy efficiency measures have been implemented. These measures shall be retained and maintained as such thereafter in accordance with the Energy Statement and Verification Report.
Reason: To ensure high standards of sustainable design and construction in accordance with Policy DES10 of the South Oxfordshire Local Plan 2035.
Prior to the commencement of any works of construction, a full surface water drainage scheme shall be submitted to and approved in writing by the Local Planning Authority. Thereafter, the development shall be implemented in accordance with the approved details.
Reason: To prevent pollution and flooding in accordance with Policies ENV12 and EP4 of the South Oxfordshire Local Plan 2035.
Prior to the commencement of any works of construction, a full foul water drainage scheme shall be submitted to and approved in writing by the Local Planning Authority. The scheme shall include details of the size, position and construction of the drainage scheme. Thereafter, the development shall be implemented in accordance with the approved details.
Reason: To ensure the proper provision of foul water drainage and to ensure flooding and pollution is not exacerbated in the locality in accordance with policy EP4 of the South Oxfordshire Local Plan 2035.
The vision splays shown on the approved plan (20041/206, Rev G) shall not be obstructed by any object, structure, planting or other material with a height exceeding or growing above 0.9 metres as measured from carriageway level.
Reason: In the interest of highway safety in accordance with Policy TRANS5 of the South Oxfordshire Local Plan 2035.
Prior to the final occupation of the development, all parking and turning areas within the site shall be provided in accordance with the approved site plan and shall be constructed, laid out, surfaced, drained and completed to be compliant with sustainable drainage (SuDS) principles, and shall be retained unobstructed except for the parking of vehicles associated with the development at all times.
Reason: In the interests of highway safety and in accordance with Policy TRANS5 of the South Oxfordshire Local Plan 2035.
Prior to the commencement of any works of construction, details (including specification and position as shown on plan) of the biodiversity enhancements stated in sections 5.2.2.1 and 5.2.2.2 of the supporting Preliminary Ecological Appraisal (Windrush Ecology Ltd, 01/02/2022) shall be submitted to and approved in writing by the local planning authority. For the avoidance of doubt, this condition requires the provision of a minimum of one integrated bat box and one integrated bird box within the fabric of each new dwelling.
Reason: To ensure that there is no net loss of biodiversity, in accordance with Policies ENV2 and ENV3 of the South Oxfordshire Local Plan 2035.
No external lighting shall be provided on site other than that which has first been permitted in accordance with a lighting scheme submitted to and approved in writing by the Local Planning Authority prior to the installation of any external lighting. Any external lighting provided shall be implemented only in accordance with the approved details and directed downwards to prevent undue light spread/spillage, and shall thereafter be retained as such.
Reason: To protect the appearance of the area, the environment and wildlife, and local residents from light pollution in accordance with Policy ENV12 of the South Oxfordshire Local Plan 2035.