The development hereby approved shall be carried out in accordance with the details shown on the following approved plans,
3138.P.300 Rev E - Site Location Plan
Existing Plans
3138.P.324 Rev A - Existing Site Plan
3138.P.325 Rev B - Demolition Plan
3138.P.327 - Existing Building 1 Plans and Elevations
3138.P.328 - Existing Building 2 Plans and Elevations
3138.P.329 - Existing Building 3, 4 and 5 Plans and Elevations
Proposed Layout Plans
3138.P.301 Rev Y - Site Layout
3138.P.302 Rev K - Colour Site Plan
3138.P.303 Rev N - Enclosures Plan
3138.P.326 Rev E - Site Layout with Ground Floor Plans
3138.P.331 Rev K - Open Space and Garden Size Plan
3138.P.332 Rev J - Materials Plan
3138.P.333 Rev J - Parking Plan
3138.P.335 Rev C - Tenure Plan
3138.P.336 Rev B - EV Charging Plan
3138.P.337 Rev C - Hardstanding Plan
Proposed Landscaping Plans
BEE23526-11R 1 of 3
BEE23526-11R 2 of 3
BEE23526-11R 3 of 3
Proposed Housetypes
3138.P.304 Rev C - Plots 1-3 Plans and Elevations
3138.P.305 Rev C - Plots 6-7 Plans and Elevations
3138.P.306 Rev A - Plots 8-9 Plans and Elevations
3138.P.307 Rev D - Plots 10-15 Plans and Elevations
3138.P.308 Rev F - Plots 16-17 and 18-19 Plans and Elevations
3138.P.309 Rev B - Plots 20 and 24 Plans and Elevations
3138.P.310 Rev C - Plot 21 Plans and Elevations
3138.P.311 Rev E - Plot 22 Plans and Elevations
3138.P.312 Rev C - Plots 27-28 Plans and Elevations
3138.P.313 Rev C - Plots 4-5 Plans and Elevations
3138.P.314 Rev C - Plots 29-30 Plans and Elevations
3138.P.315 Rev D - Plots 31-32 Plans and Elevations
3138.P.316 Rev A - Plots 33-36 Plans and Elevations
3138.P.317 Rev C - Plots 37-40 Plans and Elevations
3138.P.318 Rev A - Commercial Building Plans and Elevations
3138.P.322 Rev E - Plot 23 Plans and Elevations
3138.P.323 Rev E - Plots 25-26 Plans and Elevations
Other plans
3138.P.320 Rev K - Contextual Section A-A
3138.P.321 Rev H - Contextual Section B-B
3138.SK141222 Rev B Swale Sections and Site Extract
3138.P.319 Rev E - Bike and Bin Stores and Garages
except as controlled or modified by conditions of this permission.
Reason: To secure the proper planning of the area in accordance with Development Plan policies.
Related application(s):
P23/S0967/DIS,
P23/S0993/DIS,
P23/S0994/DIS,
P23/S2024/DISPrior to the commencement of the development, details of measures to prevent the potential for damage to subsurface potable water infrastructure, shall be submitted to and approved in writing by the Local Planning Authority. Any construction must be undertaken in accordance with the terms of the approved information.
Reason: To ensure that the development does not impact on local underground water utility infrastructure in accordance with Policy INF4 and ENV11 of the South Oxfordshire Local Plan 2035.
Prior to the commencement of the development, a Source Protection Strategy detailing how the developer intends to ensure the water abstraction source is not detrimentally affected by the proposed development both during and after its construction, shall be submitted to and approved in writing by the Local Planning Authority. The development shall be constructed and maintained in accordance with the recommendations of the strategy.
Reason - To ensure that the water resource is not detrimentally affected by the development in accordance with Policies INF4 and ENV11 of the South Oxfordshire Local Plan 2035.
Piling using penetrative methods shall not be carried out other than with the written consent of the Local Planning Authority. In the event that piling is required a piling method statement shall be submitted to and approved in writing by the Local Planning Authority prior to the commencement of the development. The development shall be implemented in accordance with the approved details.
Reason: To ensure that the proposal does not harm groundwater resources in accordance with Policies INF4 and ENV12 of the South Oxfordshire Local Plan 2035.
Prior to any development above slab level, a schedule of all materials to be used in the external construction and finishes of the development hereby permitted shall be submitted to and approved in writing by the Local Planning Authority. The development shall be implemented in accordance with the approved details.
Reason: In the interests of the visual appearance of the development in accordance with Policies DES1 and DES2 of the South Oxfordshire Local Plan 2035 and Policies SD3 and H1 of the Joint Henley and Harpsden Neighbourhood Plan 2020 - 2035.
Prior to any development above slab level, a detailed lighting scheme including a programme for its delivery, shall be submitted to and approved in writing by the Local Planning Authority. The development shall be implemented in accordance with the approved scheme.
Reason: To minimise the impacts of development on the surrounding landscape in accordance with Policy ENV1 of the South Oxfordshire Local Plan 2035.
Prior to occupation, a detailed planting scheme for the site, including the planting of live trees and shrubs, shall be submitted to and approved in writing by the Local Planning Authority. These details shall include schedules of new trees and shrubs to be planted (noting species, plant sizes and numbers/densities), the identification of the existing trees and shrubs on the site to be retained (noting species, location and spread), and an implementation programme. The scheme shall be implemented prior to the first occupation or use of the development hereby approved and thereafter be maintained in accordance with the approved scheme. In the event of any of the trees or shrubs so planted dying or being seriously damaged or destroyed within 5 years of the completion of the development, a new tree or shrub or equivalent number of trees or shrubs, as the case may be, of a species first approved by the Local Planning Authority, shall be planted and properly maintained in a position or positions first approved in writing by the Local Planning Authority.
Reason: To help to assimilate the development into its surroundings in accordance with Policies ENV1, DES1 and DES2 of the South Oxfordshire Local Plan 2035 and Policies ENV2 and ENV3 of the Joint Henley and Harpsden Neighbourhood Plan 2020 - 2035.
The following windows shall be glazed in obscure glass with a minimum of level 3 obscurity and shall be fixed shut with the exception of a top hung openable fanlight (or other means of opening to be first agreed in writing by the Local Planning Authority) prior to the first occupation of the relevant plot:
- First floor en-suite in plot 24 (south elevation)
- First floor bathroom in plot 39 (north elevation)
- First floor stairwell serving plots 39 and 40 (north elevation)
- First floor rear windows in commercial building (west elevation)
The windows shall be retained as such thereafter.
Reason: To ensure that the development is not unneighbourly in accordance with Policy DES6 of the South Oxfordshire Local Plan 2035.
The privacy screens on the balconies of Plots 4, 5, 6, 7, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27 and 28 shall be provided prior to the first occupation of the relevant plot. The screens shall be retained as such thereafter.
Reason: To ensure that the development is not unneighbourly in accordance with Policy DES6 of the South Oxfordshire Local Plan 2035.
The garage accommodation hereby approved shall be retained as such and shall not be adapted for living purposes without planning permission from the Local Planning Authority.
Reason: In the interests of highway safety and to ensure the provision of adequate off-street car parking in accordance with Policy TRANS5 of the South Oxfordshire Local Plan 2035 and Policy T6 of the Joint Henley and Harpsden Neighbourhood Plan 2020 - 2035.