Planning Application Details

P21/S2768/FULApplication Type: Full Application (Show Map - opens in new window)
Status Bar
 
 Completed stage
 
 Current stage
 
 Next stage
Application registered
Consultation period
Application under consideration
Decision made
Description
Demolition of existing single storey dwellinghouse and erection of a pair of 2- bedroom dwellinghouses and a detached 3-bedroom dwellinghouse with associated parking and amenity space provision and miniature orchard planted in a wildflower meadow (design and layout of dwellings and associated access and parking altered as shown on amended documents received 4th May 2022)
Location
The Bungalow Shirburn Road between Pyrton and Watlington OX49 5BZ
Grid Reference
469322/195079
Applicant
OPS Property Ltd
c/o JPPC
Bagley Croft
Hinksey Hill
Oxford
OX1 5BD
Agent
JPPC Chartered Town Planners
Bagley Croft
Hinksey Hill
Oxford
OX1 5BD
Case Officer
Paul Lucas
Telephone: 01235 422600
Email: planning@southoxon.gov.uk
Consultation / Notification
No further Representations on this application will be accepted.

Consultations / Notifications to date are shown below.

Name / Number
Date Sent
Response Date
 
Pyrton Parish Council
c/o Ian J. Parker
Magpies
Pyrton
WATLINGTON
Oxon
OX49 5AP
05 05 2022
16 05 2022
 
Countryside Officer (South and Vale)
05 05 2022
13 06 2022
 
Drainage - (South&Vale)
10 07 2021
23 08 2021
 
Forestry Officer (South and Vale)
05 05 2022
25 05 2022
 
South -Highways Liaison Officer (Oxfordshire County Council)
05 05 2022
22 06 2022
 
Contaminated Land
09 07 2021
23 07 2021
 
Shirburn Parish Meeting
c/o Roger  Beattie
2 Blenheim Road
Shirburn
WATLINGTON
OX49 5DN
05 05 2022
12 11 2021
 
Eastfield Farm
Shirburn Road
Watlington
OX49 5DA
05 05 2022
30 07 2021
 
Shirburn Castle
Castle Road
Shirburn
Watlington
OX49 5DL
05 05 2022
15 11 2021
 
Mike Andrews
05 05 2022
12 05 2022
 
Application Type
Minor (Full Application)
Application Progress
Date Received  
16th June 2021
Registration Date  
16th June 2021
Start Consultation Period  
9th July 2021
End Consultation Period  
19th May 2022
Target Decision Date  
1st July 2022
Decision
Planning Permission on 1st July 2022
Conditions / Refusal Reasons
The development to which this permission relates must be begun not later than the expiration of three years beginning with the date of this permission. Reason: By virtue of Sections 91 to 95 of the Town and Country Planning Act 1990 as amended by section 51 of the Planning and Compulsory Purchase Act 2004. Related application(s): P22/S2949/DIS

That the development hereby approved shall be carried out in accordance with the details shown on the following approved plans, PL09, PL-12, AEL-18366-TCP-A, PL-08-1, PL-04-1, PL-05-1, PL-07-1, PL-06-1, PL-01-1, PL-03, PL-02-1, PL-12-1, P21-78-003, PL-11-1, AEL-18366-TCNLP-C, AEL-18366-TIP-C, AEL-18366-TLP-C, AEL-18366-TPP-C, AEL-18366-TSP-C and AEL-18366-TWP-C, except as controlled or modified by conditions of this permission. Reason: To secure the proper planning of the area in accordance with Development Plan policies. Related application(s): P22/S2949/DIS

Except in the case of any building work hereby permitted, no change in the levels of the land shall take place unless in accordance with a detailed scheme which shall have been submitted to and approved in writing by the Local Planning Authority before any development commences on site. The scheme shall include details of existing and proposed ground levels. Reason: In the interests of the visual appearance of the development in accordance with Policies DES1 and DES2 of the South Oxfordshire Local Plan 2035. Related application(s): P22/S2949/DIS

No development above slab level shall take place until a photographic schedule of all materials to be used in the external construction and finishes of the development hereby permitted has been submitted to and approved in writing by the Local Planning Authority. Reason: In the interests of the visual appearance of the development in accordance with Policies DES1 and DES2 of the South Oxfordshire Local Plan 2035. Related application(s): P22/S2949/DIS

Notwithstanding the provisions of the Town and Country (General Permitted Development Order) 2015 (or any Order revoking or re-enacting that Order), no development as specified in Schedule 2, Part 1, Class A - Extensions; Class B - Roof Extensions; Class E - Outbuildings; Class F - Hardsurfacing shall be undertaken without obtaining planning permission from the Local Planning Authority. Reason: The specific circumstances of this site warrant the Local Planning Authority having control over any further development as specified in the condition to safeguard the amenities of the occupiers of the adjoining properties and the character of the area in accordance with Policies DES1, DES2 and DES6 of the South Oxfordshire Local Plan 2035. Related application(s): P22/S2949/DIS

Prior to first occupation, all carbon reduction energy efficiency measures shall be implemented in accordance with the Energy Statement hereby approved and a Verification Report shall be submitted to the Local Planning Authority and approved in writing. The Verification Report shall demonstrate (with photographic evidence) that the energy efficiency measures have been implemented. These measures shall be retained and maintained as such thereafter in accordance with the Energy Statement and Verification Report. Reason: To ensure high standards of sustainable design and construction in accordance with Policy DES10 of the South Oxfordshire Local Plan 2035.

Prior to occupation of the development hereby permitted the proposed means of access onto the private drive is to be formed and laid out and constructed strictly in accordance with the local highway authority's specifications and all ancillary works specified shall be undertaken. Reason: In the interest of highway safety in accordance with Policy TRANS5 of the South Oxfordshire Local Plan 2035.

The vision splays shown on the approved plan PL-03 shall not be obstructed by any object, structure, planting or other material with a height exceeding or growing above 0.9 metres as measured from carriageway level. Reason: In the interest of highway safety in accordance with Policy TRANS5 of the South Oxfordshire Local Plan 2035.

Prior to the first occupation of the development hereby permitted, a 'rumble-strip' should be laid in a 1.0 metre strip from the boundary of the driveway with the road to the start of the gravelled area. Reason: In the interest of highway safety in accordance with Policy TRANS5 of the South Oxfordshire Local Plan 2035.

Prior to the first occupation of the development hereby approved, the parking and turning areas shall be provided in accordance with the approved plan PL-03 and shall be constructed, laid out, surfaced, drained and completed to be compliant with sustainable drainage (SuDS) principles, and shall be retained unobstructed except for the parking of vehicles associated with the development at all times. Reason: In the interests of highway safety and in accordance with Policy TRANS5 of the South Oxfordshire Local Plan 2035.

The landscaping scheme as shown on the approved plan Tree Landscape Plan Rev C shall be implemented prior to the first occupation or use of the approved development and thereafter be maintained in accordance with the approved scheme. In the event of any of the soft landscaping so planted dying or being seriously damaged or destroyed within 5 years of the completion of the development, replacement planting, as the case may be, of a species first approved by the Local Planning Authority, shall be planted and properly maintained in a position or positions first approved in writing by the Local Planning Authority. Reason: To help to assimilate the development into its surroundings in accordance with Policies ENV1, DES1 and DES2 of the South Oxfordshire Local Plan 2035.

Prior to the commencement of any site works or operations, including demolition and site clearance relating to the development hereby permitted, an Arboricultural Method Statement and accompanying Tree Protection Plan shall be submitted to and approved in writing by the Local Planning Authority. The Arboricultural Method Statement must include the following: (1) A specification of any pruning or tree surgery works to any trees to be retained, to prevent accidental damage by construction or demolition activities; (2) The specification and location of temporary tree protective fencing and any ground protection required to protect all retained trees in accordance with the current edition of BS 5837 ''Trees in relation to design, demolition and construction'', and details of the timing and duration of its erection; (3) The definition of areas for the storage or stockpiling of materials, temporary on-site parking, site offices and huts, mixing of cement or concrete, and fuel storage; (4) The means of demolition of any existing site structures, and of the re-instatement of the area currently occupied thereby; (5) The route and method of installation of drainage or any underground services in the vicinity of retained trees; Consideration will be made to avoid siting of utilities and service runs within the Root Protection Area (RPA) of all trees to be retained. Only where it can be demonstrated that there is no alternative location for the laying of utilities, will encroachment into the RPA be considered. Methodology for any installation works within the RPA will be provided and must be in compliance with the current edition of NJUG 'Guidelines for the planning and installation and maintenance of utility apparatus in proximity to trees'. (6) The details and method of construction of any other structures such as boundary walls in the RPA of retained trees and how these relate to existing ground levels; (7) The details of materials and method of construction of any roadway, driveway, parking, pathway or other surfacing within the RPA, which is to be of a 'No Dig' construction method, in accordance with the principles with in Arboricultural Association Guidance Note 12 "The use of cellular confinement systems near trees" and in accordance with current industry best practice; and is appropriate for the type of roadway required in relation to its usage. (8) Provision for the supervision of ANY works within the RPA of trees to be retained, and for the monitoring of continuing compliance with the protective measures specified, by an appropriately qualified arboricultural consultant, to be appointed at the developer's expense and notified to the Local Planning Authority, prior to the commencement of development; and provision for the regular reporting of continued compliance or any departure there from to the Local Planning Authority. Thereafter the development shall be carried out in accordance with the approved details with the agreed measures being kept in place during the entire course of development. Reason: To safeguard trees which are visually important in accordance with Policies ENV1, DES1, and DES2 of the South Oxfordshire Local Plan 2035.

The development hereby approved shall be implemented in accordance with the recommendations made in section 4.2 of the supporting Preliminary Ecological Appraisal (Midland Ecology, Updated June 2021). Bat boxes and soft landscaping shall be provided on site prior to first occupation. Reason: To minimise the ecological impacts of development and secure biodiversity enhancement on site, in accordance with Policies ENV2 and ENV3 of the South Oxfordshire Local Plan 2035 and paragraphs 174 and 180 of the NPPF.

Prior to the commencement of the development a phased risk assessment shall be carried out by a competent person in accordance with current government and Environment Agency Guidance and Approved Codes of Practice such as Land Contamination: Risk Management 2020 and BS10175:2011 +A2:2017 'Investigation of potentially contaminated sites'. Each phase shall be submitted to and approved in writing by the Local Planning Authority. Phase 1 shall incorporate a desk study and site walk over to identify all potential contaminative uses on site, and to inform the conceptual site model. If potential contamination is identified in Phase 1 then a Phase 2 investigation shall be undertaken. Phase 2 shall include a comprehensive intrusive investigation in order to characterise the type, nature and extent of contamination present, the risks to receptors and if significant contamination is identified to inform the remediation strategy. Phase 3 requires that a remediation strategy be submitted to and approved by the LPA to ensure the site will be rendered suitable for its proposed use. Reason: To ensure that any ground, water and associated gas contamination is identified and adequately addressed to ensure the safety of the development, the environment and to ensure the site is suitable for the proposed use in accordance with Policy ENV11 of the South Oxfordshire Local Plan 2035.

The developer shall confirm in writing to the Local Planning Authority the presence of any unsuspected contamination encountered during the development. In the event of any contamination to the land and/or water being encountered, no development shall continue until a programme of investigation and/or remedial works to include methods of monitoring and certification of such works undertaken. Where land contamination investigation/remedial works are required this must be carried out by a competent person in accordance with current government and Environment Agency Guidance and Approved Codes of Practice such as Land Contamination: Risk Management 2020 and BS10175:2011 +A2:2017 'Investigation of potentially contaminated sites' and submitted to and approved in writing by the local planning authority. Reason: To ensure that any ground, water and associated gas contamination is identified and adequately addressed to ensure the safety of the development, the environment and to ensure the site is suitable for the proposed use in accordance with Policy ENV11 of the South Oxfordshire Local Plan 2035.

The development shall not be occupied until any previously approved remediation strategy has been carried out in full and a validation report confirming completion of these works has been submitted to and approved in writing by the Local Planning Authority. Reason: To ensure that any ground, water and associated gas contamination is identified and adequately addressed to ensure the safety of the development, the environment and to ensure the site is suitable for the proposed use in accordance with Policy ENV11 of the South Oxfordshire Local Plan 2035.

No external lighting shall be installed on the site other than in accordance with details, which have first been submitted to and approved in writing by the Local Planning Authority. Details shall include location of the external lights and product specification. Reason: To protect the appearance of the area, the environment and wildlife, and local residents from light pollution in accordance with Policy ENV12 of the South Oxfordshire Local Plan 2035.

Prior to the commencement of development, with the exception of any demolition, a full surface water drainage scheme in accordance with the surface water drainage hierarchy as set out in Part H of the Building Regulations, including details of the size, position and construction of drainage works, shall be submitted to, and approved in writing by, the Local Planning Authority. The drainage scheme shall be designed to accommodate a 1 in 100 year storm + 40% CC and shall be implemented in accordance with the approved details prior to the occupation of the development hereby approved. Reason: To ensure the proper provision of surface water drainage and to ensure flooding is not exacerbated in the locality in accordance with Policy EP4 of the South Oxfordshire Local Plan 2035.

Prior to the commencement of development, with the exception of any demolition, a full foul water drainage scheme shall be submitted to and approved in writing by the Local Planning Authority. The scheme shall include details of the size, position and construction of the drainage scheme, all coupled with calculations to evidence this. Thereafter the scheme as approved shall be implemented prior to the occupation of the development hereby approved. Reason: To ensure the proper provision of foul water drainage and to ensure flooding and pollution is not exacerbated in the locality in accordance with policy EP4 of the South Oxfordshire Local Plan 2035.

Prior to the first occupation of the development hereby approved, an Electric Vehicle Charging Point shall be installed for each dwelling and thereafter retained as such. Reason: To ensure sustainable forms of transport in accordance with Policy TRANS5 of the South Oxfordshire Local Plan 2035.
Appeal
No appeal lodged.
Updates
These Planning Application Details were returned live from our back office database, and as such are as up to date as when the page was retrieved.