Application registered
Consultation period
Application under consideration
Decision made
Description
The erection of a new detached dwelling and carport.(amended plans received 8th August 2021 relocating proposed car port, together with an additional planning statement. Further arboricultural information received 12th August 2021 Energy statement received 10th September 2021. Revised energy statement submitted 20th September 2021)
Location
Land Adjacent to Queensgate Butts Way Aston Rowant OX49 5SZ
Grid Reference
472397/198316
Applicant
Mr Mark Griffiths
Threelands Cottage
Chalford Road
Postcombe
OX9 7EB
Agent
Lynn Palmer Architects Ltd
109 High Street
Thame
OX9 3DZ
Case Officer
Simon Kitson
Telephone: 01235 422600
Email: planning@southoxon.gov.uk
Consultation / Notification
No further Representations on this application will be accepted.

Consultations / Notifications to date are shown below.

Name / Number
Date Sent
Response Date
 
Aston Rowant Parish Council
c/o Tracy Lambourne
The Cottage
High Street
Kingston Blount
Oxon
OX39 4SJ
13 08 2021
17 07 2021
 
Countryside Officer (South and Vale)
13 08 2021
21 09 2021
 
Forestry Officer (South and Vale)
13 08 2021
09 09 2021
 
South -Highways Liaison Officer (Oxfordshire County Council)
13 08 2021
09 07 2021
 
Aston Park Stud
Aston Rowant
Watlington
OX49 5SR
13 08 2021
 
Queensgate
Butts Way
Aston Rowant
Watlington
OX49 5SZ
13 08 2021
 
Hailands
Butts Way
Aston Rowant
Watlington
OX49 5SZ
13 08 2021
 
Icknield Cottage
Butts Way
Aston Rowant
Watlington
OX49 5SZ
13 08 2021
 
Limewood House
Butts Way
Aston Rowant
Watlington
OX49 5SZ
13 08 2021
 
Mike Andrews
12 10 2021
13 10 2021
 
Application Type
Minor (Full Application)
Application Progress
Date Received  
16th June 2021
Registration Date  
16th June 2021
Start Consultation Period  
25th June 2021
End Consultation Period  
27th August 2021
Target Decision Date  
10th September 2021
Decision
Planning Permission on 22nd October 2021
Conditions / Refusal Reasons
The development to which this permission relates must be begun not later than the expiration of three years beginning with the date of this permission. Reason: By virtue of Sections 91 to 95 of the Town and Country Planning Act 1990 as amended by section 51 of the Planning and Compulsory Purchase Act 2004. Related application(s): P22/S3046/DIS

That the development hereby approved shall be carried out in accordance with the details shown on the following approved plans, PL 103 Rev A, PL 104 Rev A, PL 200 Rev A, PL 201 Rev A, PL 300 Rev A, PL 400 Rev A, TPP Rev B, SU 200, PL 101, SU 100, PL 100 and PL 102, except as controlled or modified by conditions of this permission. Reason: To secure the proper planning of the area in accordance with Development Plan policies. Related application(s): P22/S3046/DIS

No development above slab level shall take place until a photographic schedule of all materials to be used in the external construction and finishes of the development hereby permitted has been submitted to and approved in writing by the Local Planning Authority. Reason: In the interests of the visual appearance of the development in accordance with Policies DES1 and DES2 of the South Oxfordshire Local Plan 2035. Related application(s): P22/S3046/DIS

Prior to first occupation, all carbon reduction energy efficiency measures shall be implemented in accordance with the Energy Statement hereby approved and a Verification Report shall be submitted to the Local Planning Authority and approved in writing. The Verification Report shall demonstrate (with photographic evidence) that the energy efficiency measures have been implemented. These measures shall be retained and maintained as such thereafter in accordance with the Energy Statement and Verification Report. Reason: To ensure high standards of sustainable design and construction in accordance with Policy DES10 of the South Oxfordshire Local Plan 2035. Related application(s): P22/S3046/DIS

Prior to the commencement of the development hereby approved a scheme for the landscaping of the site, including the planting of live trees and shrubs, the treatment of the access road and hard standings, and the provision of boundary treatment shall be submitted to and approved in writing by the Local Planning Authority. These details shall include schedules of new trees and shrubs to be planted (noting species, plant sizes and numbers/densities), the identification of the existing trees and shrubs on the site to be retained (noting species, location and spread), any earth moving operations and finished levels/contours, and an implementation programme. The scheme shall be implemented prior to the first occupation or use of development and thereafter be maintained in accordance with the approved scheme. In the event of any of the trees or shrubs so planted dying or being seriously damaged or destroyed within 5 years of the completion of the development, a new tree or shrub or equivalent number of trees or shrubs, as the case may be, of a species first approved by the Local Planning Authority, shall be planted and properly maintained in a position or positions first approved in writing by the Local Planning Authority. Reason: To help to assimilate the development into its surroundings in accordance with Policies ENV1, DES1 and DES2 of the South Oxfordshire Local Plan 2035. Related application(s): P22/S3046/DIS

Prior to the commencement of any site works or operations, including demolition and site clearance relating to the development hereby permitted, an Arboricultural Method Statement and accompanying Tree Protection Plan shall be submitted to and approved in writing by the Local Planning Authority. The Arboricultural Method Statement must include the following: (1) A specification of any pruning or tree surgery works to any trees to be retained, to prevent accidental damage by construction or demolition activities; (2) The specification and location of temporary tree protective fencing and any ground protection required to protect all retained trees in accordance with the current edition of BS 5837 ''Trees in relation to design, demolition and construction'', and details of the timing and duration of its erection; (3) The definition of areas for the storage or stockpiling of materials, temporary on-site parking, site offices and huts, mixing of cement or concrete, and fuel storage; (4) The means of demolition of any existing site structures, and of the re-instatement of the area currently occupied thereby; (5) The route and method of installation of drainage or any underground services in the vicinity of retained trees; Consideration will be made to avoid siting of utilities and service runs within the Root Protection Area (RPA) of all trees to be retained. Only where it can be demonstrated that there is no alternative location for the laying of utilities, will encroachment into the RPA be considered. Methodology for any installation works within the RPA will be provided and must be in compliance with the current edition of NJUG 'Guidelines for the planning and installation and maintenance of utility apparatus in proximity to trees'. (6) The details and method of construction of any other structures such as boundary walls in the RPA of retained trees and how these relate to existing ground levels; (7) The details of materials and method of construction of any roadway, driveway, parking, pathway or other surfacing within the RPA, which is to be of a 'No Dig' construction method, in accordance with the principles with in Arboricultural Association Guidance Note 12 "The use of cellular confinement systems near trees" and in accordance with current industry best practice; and is appropriate for the type of roadway required in relation to its usage. (8) Provision for the supervision of ANY works within the RPA of trees to be retained, and for the monitoring of continuing compliance with the protective measures specified, by an appropriately qualified arboricultural consultant, to be appointed at the developer's expense and notified to the Local Planning Authority, prior to the commencement of development; and provision for the regular reporting of continued compliance or any departure there from to the Local Planning Authority. Thereafter the development shall be carried out in accordance with the approved details with the agreed measures being kept in place during the entire course of development. Reason: To safeguard trees which are visually important in accordance with Policies ENV1, DES1, and DES2 of the South Oxfordshire Local Plan 2035. Related application(s): P22/S3046/DIS

A proportionate and specific biodiversity mitigation and enhancement strategy (BMES), as informed by a suitably qualified ecologist, shall be submitted to and agreed in writing the Local Planning Authority prior to the commencement of the development hereby approved.. Thereafter, the development shall be implemented in accordance with the approved BMES and all ecological mitigation and enhancement features shall be delivered on site prior to first use and retained as such thereafter. Reason: To ensure that there is no net loss of biodiversity, in accordance with Policies ENV2 and ENV3 of the South Oxfordshire Local Plan 2035. Related application(s): P22/S3046/DIS

Prior to the commencement of development, a full surface water drainage scheme, including details of the size, position and construction of drainage works, shall be submitted to, and approved in writing by, the Local Planning Authority. The drainage scheme shall be designed to accommodate a 1 in 10 year storm + 40% CC and shall be implemented in accordance with the approved details prior to the occupation of the development hereby approved. Reason: To prevent pollution and flooding in accordance with Policies ENV12 and EP4 of the South Oxfordshire Local Plan 2035.

That, prior to the commencement of development, a full foul water drainage scheme shall be submitted to and approved in writing by the Local Planning Authority. The scheme shall include details of the size, position and construction of the drainage scheme, all coupled with calculations to evidence this. Thereafter the development shall be carried out in accordance with the approved details. Reason: To ensure the proper provision of foul water drainage and to ensure flooding and pollution is not exacerbated in the locality in accordance with policy EP4 of the South Oxfordshire Local Plan 2035.

Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 2015 (or any Order revoking or re-enacting that Order), the enlargement, improvement or other alteration of any dwellinghouse as described in Schedule 2, Part 1, Class A of the Order shall not be undertaken without obtaining planning permission from the Local Planning Authority. Reason: To safeguard the amenities of the occupiers of the adjoining properties and the character of the area in accordance with Policies DES1, DES2 and DES6 of the South Oxfordshire Local Plan 2035.

Prior to occupation of the dwelling hereby permitted the proposed means of access onto Butts Way is to be formed and laid out and constructed strictly in accordance with the local highway authority's specifications and all ancillary works specified shall be undertaken. Reason: In the interest of highway safety in accordance with Policy TRANS5 of the South Oxfordshire Local Plan 2035.

Before the proposed access is first used, the existing access onto Butts Way shall be permanently stopped up by the means of reinstatement of the highway verge and proposed planting to the approval of the Local Planning Authority and in accordance with the local highway authority's specifications. Thereafter the closed access shall not be used by any vehicular traffic whatsoever. Reason: In the interest of highway safety in accordance with Policy TRANS5 of the South Oxfordshire Local Plan 2035.

The vision splays shown on the approved plan 20026 (PL) 103A shall not be obstructed by any object, structure, planting or other material with a height exceeding or growing above 0.9 metres as measured from carriageway level. Reason: In the interest of highway safety in accordance with Policy TRANS5 of the South Oxfordshire Local Plan 2035.

Prior to the first occupation of the development hereby permitted, concrete or blacktop should be laid in a 1 metre strip from the boundary of the driveway with the road to the start of the gravelled area. Reason: In the interest of highway safety in accordance with Policy TRANS5 of the South Oxfordshire Local Plan 2035.

Prior to the first occupation of the development hereby approved, the parking and turning areas shall be provided in accordance with the approved plan 20026 (PL) 103A and shall be constructed, laid out, surfaced, drained and completed to be compliant with sustainable drainage (SuDS) principles, and shall be retained unobstructed except for the parking of vehicles associated with the development at all times. Reason: In the interests of highway safety and in accordance with Policy TRANS5 of the South Oxfordshire Local Plan 2035.
Appeal