The development to which this permission relates must be begun not later than the expiration of three years beginning with the date of this permission.
Reason: By virtue of Sections 91 to 95 of the Town and Country Planning Act 1990 as amended by section 51 of the Planning and Compulsory Purchase Act 2004.
Related application(s):
P21/S4531/DIS,
P23/S1171/DISThat the development hereby approved shall be carried out in accordance with the details shown on the following approved plans, P10 REV D, SU02 Rev A, P12 REV A, P11, L01 and SU01, except as controlled or modified by conditions of this permission.
Reason: To secure the proper planning of the area in accordance with Development Plan policies.
Prior to the commencement of development, a full surface water drainage scheme in accordance with the surface water drainage hierarchy as set out in Part H of the Building Regulations, including details of the size, position and construction of drainage works, shall be submitted to, and approved in writing by, the Local Planning Authority. The drainage scheme shall be designed to accommodate a 1 in 100 year storm + 40% CC and shall be implemented in accordance with the approved details prior to the occupation of the development hereby approved.
Reason: To ensure the proper provision of surface water drainage and to ensure flooding is not exacerbated in the locality in accordance with Policy EP4 of the South Oxfordshire Local Plan 2035.
The dwelling shall not be occupied until all biodiversity features have been delivered and implemented in accordance with the details shown in the supporting Biodiversity Plan (drawing no: 21006-p14-, 27/07/2021) and "Biodiversity Compensation and Enhancement Details document. The biodiversity features shall be retained and maintained as such thereafter in accordance with the approved Biodiversity Plan and Biodiversity Compensation and Enhancement Details document.
Reason: To secure the delivery of biodiversity features on site, in accordance with Policies ENV2 and ENV3 of the SOLP35 and paragraphs 174 and 180 of the NPPF.
Prior to the first occupation of the development, hereby approved, the parking and turning areas shall be provided in accordance with drawing no. 21006 - P10 - D, and shall be constructed, laid out, surfaced, drained and completed to be compliant with sustainable drainage (SuDS) principles, and shall be retained unobstructed except for the parking of vehicles associated with the development at all times.
Reason: In the interests of highway safety and in accordance with Policy TRANS5 of the South Oxfordshire Local Plan 2035.
Prior to first occupation of the dwelling house, all carbon reduction energy efficiency measures shall be implemented in accordance with the energy statement produced by MH Energy Consultants and SAP calculations (ref: 7375) hereby approved and a verification report shall be submitted to the local planning authority and approved in writing. The verification report shall demonstrate (with photographic evidence) that the energy efficiency measures have been implemented. These measures shall be retained and maintained as such thereafter in accordance with the energy statement and verification report.
Reason: To ensure high standards of sustainable design and construction in accordance with Policy DES10 of the South Oxfordshire Local Plan 2035.
The dwelling shall not be occupied until an Electric Vehicle Charging Point has been installed.
Reason: To ensure sustainable forms of transport are provided in accordance with Policy TRANS5 of the South Oxfordshire Local Plan 2035.
The development hereby permitted shall only be constructed in the materials specified on the plans hereby approved or in materials which shall previously have been approved in writing by the Local Planning Authority.
Reason: In the interests of the visual appearance of the development in accordance with policies DES1 and DES2 of the South Oxfordshire Local Plan 2035.
Notwithstanding the provisions of Classes A, B, C, D and E of Part 1 Schedule 2 of the Town and Country Planning (General Permitted Development) Order 2015 (or the equivalent provisions of any order revoking and re-enacting that Order), there shall be no extension or roof alteration to the dwelling hereby permitted and no ancillary buildings or structures shall be erected within the curtilage of the dwelling without the prior grant of planning permission.