Planning Application Details

P21/S2114/FULApplication Type: Full Application (Show Map - opens in new window)
Status Bar
 
 Completed stage
 
 Current stage
 
 Next stage
Application registered
Consultation period
Application under consideration
Decision made
Description
Demolition of the existing agricultural barn and the erection of a single dwelling with associated works and landscaping. (As amended by plans and documents received 6 July 2022 to amend design of dwelling and landscaping of the site and energy statement received 8 August 2022).
Location
Tetsworth Barn Judds Lane Tetsworth OX9 7BN
Grid Reference
/
Applicant
Mr and Mrs Michael
c/o Agent
Agent
JCPC Ltd
5 Buttermarket
Thame
OX9 3EW
Case Officer
Marc Pullen
Telephone: 01235 422600
Email: planning@southoxon.gov.uk
Consultation / Notification
No further Representations on this application will be accepted.

Consultations / Notifications to date are shown below.

Name / Number
Date Sent
Response Date
 
Tetsworth Parish Council
Helen Croxford (Clerk and RFO)
111 High Street
Chalgrove
Oxford
OX44 7SS
02 12 2021
14 12 2021
 
Countryside Officer (South and Vale)
29 05 2021
25 06 2021
 
Drainage - (South&Vale)
29 05 2021
05 07 2021
 
Forestry Officer (South and Vale)
02 12 2021
03 12 2021
 
South -Highways Liaison Officer (Oxfordshire County Council)
29 05 2021
15 06 2021
 
Landscape Architect (South and Vale)
07 07 2022
20 07 2022
 
Horsenden Hill Kennels
High Street
Tetsworth
Thame
OX9 7AD
28 05 2021
 
Horsedon Hill House
Tetsworth
Thame
OX9 7FA
28 05 2021
 
South Oxfordshire District of CPRE
02 12 2021
19 12 2021
 
Energy Assessor (ESE Ltd)
09 08 2022
10 08 2022
 
Application Type
Minor (Full Application)
Application Progress
Date Received  
6th May 2021
Registration Date  
20th May 2021
Start Consultation Period  
28th May 2021
End Consultation Period  
16th December 2021
Target Decision Date  
19th August 2022
Decision
Planning Permission on 19th August 2022
Conditions / Refusal Reasons
The development to which this permission relates must be begun not later than the expiration of three years beginning with the date of this permission. Reason: By virtue of Sections 91 to 95 of the Town and Country Planning Act 1990 as amended by section 51 of the Planning and Compulsory Purchase Act 2004. Related application(s): P23/S0435/DIS

That the development hereby approved shall be carried out in accordance with the details shown on the following approved plans, PP0011, L01, PP0030C, P0031C, PP0025A, PS0010B, PP0010B, PP0010A, PE0011E and PE0010E, except as controlled or modified by conditions of this permission. Reason: To secure the proper planning of the area in accordance with Development Plan policies. Related application(s): P23/S0435/DIS

No development above slab level shall take place until a photographic schedule of all materials to be used in the external construction and finishes of the development hereby permitted has been submitted to and approved in writing by the Local Planning Authority. Reason: In the interests of the visual appearance of the development in accordance with Policies DES1, DES2 and ENV1 of the South Oxfordshire Local Plan 2035.

Prior to the first occupation of the development, the existing means of access onto Judds Lane, shall be improved and laid out and constructed strictly in accordance with the local highway authority's specifications and all ancillary works specified shall be undertaken. Reason: In the interest of highway safety in accordance with Policy TRANS5 of the South Oxfordshire Local Plan 2035.

Prior to the first occupation of the development vision splays measuring 2.4 metres by 120 metres shall be provided to each side of the access and the vision splays shall not be obstructed by any object, structure, planting or other material with a height exceeding or growing above 0.9 metres as measured from carriageway level. Reason: In the interest of highway safety in accordance with Policy TRANS5 of the South Oxfordshire Local Plan 2035.

Prior to the first occupation of the development hereby permitted, concrete or blacktop should be laid in a 1.0 metre strip from the boundary of the driveway with the road to the start of the gravelled area Reason: In the interest of highway safety in accordance with Policy TRANS5 of the South Oxfordshire Local Plan 2035.

Prior to the commencement of development, except for demolition works, a full surface water drainage scheme based on full infiltration unless evidenced exhausted, including details of the size, position and construction of drainage works, shall be submitted to, and approved in writing by, the Local Planning Authority. The drainage scheme shall be designed to accommodate a 1 in 100 year storm + 40% CC and shall be implemented in accordance with the approved details prior to the occupation of the development hereby approved. Reason: To prevent pollution and flooding in accordance with Policies ENV12 and EP4 of the South Oxfordshire Local Plan 2035.

That, prior to the commencement of development, except for demolition works, a full foul water drainage scheme shall be submitted to and approved in writing by the Local Planning Authority. The scheme shall include details of the size, position and construction of the drainage scheme. Thereafter the agreed scheme shall be implemented in full prior to the occupation of the development hereby approved. Note: We will expect to see a Package Treatment Plant fabricated to BS EN 12566 achieving a minimum discharge effluent quality of 20:30:20. Furthermore, we will expect to see a Drainage Field designed in accordance with BS 6297 Reason: To ensure the proper provision of foul water drainage and to ensure flooding and pollution is not exacerbated in the locality in accordance with policy EP4 of the South Oxfordshire Local Plan 2035.

The landscaping scheme and measures as shown on the approved plan Landscape Management Plan (Report, June 2022, ref: 1682/R/Rev C), Wider Landscape Masterplan (Drawing ref: 1682-L-2-Rev G and Lighting and Surface Materials Details (Drawing ref: 1682-A-1-Rev D) shall be implemented prior to the first occupation or use of the approved development and thereafter be maintained in accordance with the approved scheme. In the event of any of the soft landscaping so planted dying or being seriously damaged or destroyed within 5 years of the completion of the development, replacement planting, as the case may be, of a species first approved by the Local Planning Authority, shall be planted and properly maintained in a position or positions first approved in writing by the Local Planning Authority. Reason: To help to assimilate the development into its surroundings in accordance with Policies ENV1, DES1 and DES2 of the South Oxfordshire Local Plan 2035.

Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 2015 (or any Order revoking or re-enacting that Order), any development as described in Schedule 2, Part 1, Class A, Class B, Class C, Class E of the Order shall not be undertaken without obtaining planning permission from the Local Planning Authority. Reason: To safeguard the character of the area in accordance with Policies DES1, DES2 and ENV1 of the South Oxfordshire Local Plan 2035.

Notwithstanding the provisions of the Town and Country Planning (General Permitted Development Order) 2015 (or any Order revoking or re-enacting that Order) the erection or construction of gates, fences, walls or other means of enclosure or painting the dwelling as described in Schedule 2, Part 2, Class A and Class C of the Order shall not be undertaken without obtaining planning permission from the Local Planning Authority. Reason: To safeguard the character of the area in accordance with Policies DES1, DES2 and ENV1 of the South Oxfordshire Local Plan 2035.

Prior to first occupation, all carbon reduction energy efficiency measures shall be implemented in accordance with the Energy Statement hereby approved and a Verification Report shall be submitted to the Local Planning Authority and approved in writing. The Verification Report shall demonstrate (with photographic evidence) that the energy efficiency measures have been implemented. These measures shall be retained and maintained as such thereafter in accordance with the Energy Statement and Verification Report. Reason: To ensure high standards of sustainable design and construction in accordance with Policy DES10 of the South Oxfordshire Local Plan 2035.

Prior to the first occupation of the development hereby approved, an Electric Vehicle Charging Point shall be installed for the dwelling and thereafter retained as such. Reason: To ensure sustainable forms of transport in accordance with Policy TRANS5 of the South Oxfordshire Local Plan 2035.
Appeal
No appeal lodged.
Updates
These Planning Application Details were returned live from our back office database, and as such are as up to date as when the page was retrieved.