The development to which this permission relates must be begun not later than the expiration of three years beginning with the date of this permission.
Reason: By virtue of Sections 91 to 95 of the Town and Country Planning Act 1990 as amended by section 51 of the Planning and Compulsory Purchase Act 2004.
Related application(s):
P22/S4443/DISThat the development hereby approved shall be carried out in accordance with the details shown on the following approved plans, NTA 20 20002 P5, NTA 20 20000 P5, NTA_20_20098 P3, NTA_20_20051 P4, NTA_20_20050 P4, NTA_20_20052 P4, NTA_20_20003 P2, NTA_20_20053 P4, NTA_20_20300 P6, NTA_20_20301 P7, NTA_20_20302 P6, NTA_20_20101 P6, NTA_20_20100 P6, NTA_20_20102 P6, NTA_20_20103 P6, NTA_20_20200 P5, NTA_20_20201 P5 and NTA_20_20099 P7, except as controlled or modified by conditions of this permission.
Reason: To secure the proper planning of the area in accordance with Development Plan policies.
Related application(s):
P22/S4443/DISPrior to the commencement of development, with the exception of any demolition, a full surface water drainage scheme based on full infiltration unless evidenced exhausted, including details of the size, position and construction of drainage works, shall be submitted to, and approved in writing by, the Local Planning Authority. The drainage scheme shall be designed to accommodate a 1 in 100 year storm + 40% CC and shall be implemented in accordance with the approved details prior to the occupation of the development hereby approved.
Reason: To ensure the proper provision of surface water drainage and to ensure flooding is not exacerbated in the locality in accordance with Policy EP4 of the South Oxfordshire Local Plan 2035.
Related application(s):
P22/S4443/DISPrior to the commencement of development, with the exception of any demolition, a full foul water drainage scheme shall be submitted to and approved in writing by the Local Planning Authority. The scheme shall include details of the size, position and construction of the drainage scheme. Thereafter the scheme as approved shall be implemented prior to the occupation of the development hereby approved.
Note: The PTP must comply with BS EN 12566 achieving a minimum discharge effluent quality of 20:30:20. Furthermore, we will expect to see a Drainage Field designed in accordance with BS 6297.
Reason: To ensure the proper provision of foul water drainage and to ensure flooding and pollution is not exacerbated in the locality in accordance with policy EP4 of the South Oxfordshire Local Plan 2035.
Related application(s):
P22/S4443/DISDetails of all boundary walls, fences, gates and any other means of enclosure shall be submitted to and approved in writing by the Local Planning Authority prior to the commencement of development above slab level. All such approved means of enclosure shall be erected prior to the first occupation of the development, and shall thereafter be retained.
Reason: In the interests of the visual appearance of the development and neighbour amenity in accordance with Policies DES1, DES2 and DES6 of the South Oxfordshire Local Plan 2035.
Prior to first occupation, all carbon reduction energy efficiency measures shall be implemented in accordance with the Energy & Sustainability Statement by Darren Evans Ltd. dated March 2022 the and SAP Input Summary Sheet hereby approved and a Verification Report shall be submitted to the Local Planning Authority and approved in writing. The Verification Report shall demonstrate (with photographic evidence) that the energy efficiency measures have been implemented. These measures shall be retained and maintained as such thereafter in accordance with the Energy Statement and Verification Report.
Reason: To ensure high standards of sustainable design and construction in accordance with Policy DES10 of the South Oxfordshire Local Plan 2035.
Prior to the first occupation of the development hereby approved, the parking and turning areas shall be provided in accordance with the approved plan NTA_20_20099 P7 and shall be constructed, laid out, surfaced, drained and completed to be compliant with sustainable drainage (SuDS) principles, and shall be retained unobstructed except for the parking of vehicles associated with the development at all times.
Reason: In the interests of highway safety and in accordance with Policy TRANS5 of the South Oxfordshire Local Plan 2035.
The development hereby permitted shall be implemented in accordance with the recommendations of paragraph 5.3 of the Preliminary Ecological Appraisal and Building Assessment by Herdwick Ecology submitted with the application in all respects. All ecological mitigation and enhancement features shall be delivered on site prior to first use and retained as such thereafter. Any variation shall be agreed in writing by the Local Planning Authority before such change is made.
Reason: To secure a net gain in biodiversity, in accordance with Policies ENV2 and ENV3 of the South Oxfordshire Local Plan 2035.
Prior to the first occupation of the dwelling hereby approved, a scheme to provide the dwelling with an Electric Vehicle Charging Point shall be submitted to and approved in writing by the Local Planning Authority. Thereafter the Electric Vehicle Charging Point shall be implemented prior to the occupation of the dwelling it would serve.
Reason: To ensure sustainable forms of transport are provided in accordance with Policy TRANS5 of the South Oxfordshire Local Plan 2035.
The exterior of the development hereby permitted shall only be constructed in the materials specified on the plans/supporting documents hereby approved or in materials which shall previously have been approved in writing by the Local Planning Authority.
Reason: In the interests of the visual appearance of the development in accordance with Policies DES1 and DES2 of the South Oxfordshire Local Plan 2035.
Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 2015 (or any Order revoking or re-enacting that Order) no external alterations or extensions shall be carried out to the building(s) hereby approved.
Reason: To prevent harm to the openness of the Green Belt in accordance with Policy STRAT6 of the South Oxfordshire Local Plan 2035.