Description
Outline application for demolition of existing buildings and erection of single dwelling and associated works including garaging and provision of new access onto Bridle Path with matters of appearance, landscaping, layout and scale reserved.
Location
No14a Bridle Path Woodcote RG8 0SE
Grid Reference
464211/181551
Applicant
  Mr J Gupta & Mrs E Gupta
c/o Agent- JPPC
c/o agent
Agent
JPPC Chartered Town Planners
Bagley Croft
Hinksey Hill
Oxford
OX1 5BD
Case Officer
Paul Lucas
Telephone: 01235 422600
Email: planning@southoxon.gov.uk
Consultation / Notification
No further Representations on this application will be accepted.

Consultations / Notifications to date are shown below.

Name / Number
Date Sent
Response Date
 
Woodcote Parish Council
c/o Ms J Welham
Village Hall
Reading Road
Woodcote Oxon
RG8 0QY
18 02 2021
04 03 2021
 
18 Bridle Path
Woodcote
Reading
RG8 0SE
17 02 2021
 
Countryside Officer (South and Vale)
18 02 2021
08 03 2021
 
Drainage - (South&Vale)
18 02 2021
11 03 2021
 
South -Highways Liaison Officer (Oxfordshire County Council)
18 02 2021
04 03 2021
 
SGN Plant Protection Team
17 02 2021
17 03 2021
 
8 Bridle Path
Woodcote
Reading
RG8 0SE
17 02 2021
 
Japonica Acre
Goring Road
Woodcote
Reading
RG8 0QE
17 02 2021
20 02 2021
 
16 Bridle Path
Woodcote
Reading
RG8 0SE
17 02 2021
 
12 Bridle Path
Woodcote
Reading
RG8 0SE
17 02 2021
 
10 Bridle Path
Woodcote
Reading
RG8 0SE
17 02 2021
 
14 Bridle Path
Woodcote
Reading
RG8 0SE
17 02 2021
 
consulted by email
09 03 2021
 
Application Type
Minor (Outline)
Application Progress
Date Received  
29th January 2021
Registration Date  
29th January 2021
Start Consultation Period  
17th February 2021
End Consultation Period  
10th March 2021
Target Decision Date  
1st April 2021
Decision
Outline Planning Permission on 1st April 2021
Conditions / Refusal Reasons
Development shall not commence until details of the reserved matters [Appearance, Landscaping Layout and Scale] have been submitted to and approved in writing by the Local Planning Authority. In the case of any reserved matter, application for approval must be made not later than the expiration of three years beginning with the date of the grant of outline planning permission. Thereafter the development shall commence not later than whichever is the later of the following dates: (a) the expiration of three years from the date of this permission; or (b) the expiration of two years from the final approval of the reserved matters, or in the case of approval on different dates, the final approval of the last such matter to be approved. Reason: By virtue of Sections 91 to 95 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004. Related application(s): P22/S2017/DIS, P22/S2906/DIS

That the development hereby approved shall be carried out in accordance with the details shown on the following approved plans, 8026-BP1, 8026-Lo1, 8026-A and S616-0406-P-0001, except as controlled or modified by conditions of this permission. Reason: To secure the proper planning of the area in accordance with Development Plan policies. Related application(s): P22/S2017/DIS

That all existing buildings on the site shall be demolished before the new development hereby permitted commences, and any demolished material which is not to be utilised in the new development shall be removed from the land, unless an alternative scheme for the phased demolition of the buildings and removal of materials is first submitted to and approved in writing by the Local Planning Authority. Reason: To ensure satisfactory comprehensive development in accordance with Policies DES1, DES2, ENV1, H1 and H16 of the South Oxfordshire Local Plan 2035. Related application(s): P22/S2017/DIS

Prior to the commencement of development or concurrent with the submission of reserved matters for appearance and scale, detailed plans showing the existing and proposed ground levels of the site together with the slab and ridge levels of the proposed development, relative to a fixed datum point on the boundary of the application site, within 25m of the proposed dwelling footprint, shall be submitted to and approved in writing by the Local Planning Authority. Thereafter the development shall be carried out in accordance with the approved details. Reason: To ensure a satisfactory form of development in accordance with Policies DES1, DES2, ENV1, H1 and H16 of the South Oxfordshire Local Plan 2035.

Prior to the first commencement of any development above slab level or concurrent with the submission of reserved matters for appearance, a schedule of all materials to be used in the external construction and finishes of the development hereby permitted shall be submitted to and approved in writing by the Local Planning Authority. Reason: In the interests of the visual appearance of the development in accordance with Policies DES1, DES2, ENV1, H1 and H16 of the South Oxfordshire Local Plan 2035.

Save for the carrying out of demolition, prior to the commencement of the development hereby approved, an Energy Statement, including SAP calculations in line with the recognised methodology set by Government, demonstrating how the development will achieve at least a 40% reduction in carbon emissions compared with code 2013 Building Regulations and details of how this will be monitored shall be submitted to the local planning authority and approved in writing. Reason: To ensure high standards of sustainable design and construction in accordance with Policy DES10 of the South Oxfordshire Local Plan 2035.

Prior to occupation of the development hereby permitted the proposed means of access onto Bridle Path is to be formed and laid out and constructed strictly in accordance with the local highway authority's specifications and all ancillary works specified shall be undertaken. Reason: In the interest of highway safety in accordance with Policy TRANS5 of the South Oxfordshire Local Plan 2035.

Prior to the first occupation of the development, vision splays measuring 2.4 metres by 43 metres shall be provided to each side of the access and the vision splays shall not be obstructed by any object, structure, planting or other material with a height exceeding or growing above 0.9 metres as measured from carriageway level. Reason: In the interest of highway safety in accordance with Policy TRANS5 of the South Oxfordshire Local Plan 2035.

Concurrent with the submission of reserved matters for landscaping, a maintenance schedule and a long term management plan for the soft landscaping works shall be submitted to and approved in writing by the Local Planning Authority. The schedule and plan shall be implemented in accordance with the agreed programme. Reason: To help to assimilate the development into its surroundings in accordance with Policies ENV1, DES1 and DES2 of the South Oxfordshire Local Plan 2035.

Prior to the commencement of any site works or operations, including demolition and site clearance relating to the development hereby permitted, an Arboricultural Method Statement and accompanying Tree Protection Plan shall be submitted to and approved in writing by the Local Planning Authority. The Arboricultural Method Statement must include the following: (1) A specification of any pruning or tree surgery works to any trees to be retained, to prevent accidental damage by construction or demolition activities; (2) The specification and location of temporary tree protective fencing and any ground protection required to protect all retained trees in accordance with the current edition of BS 5837 ''Trees in relation to design, demolition and construction'', and details of the timing and duration of its erection; (3) The definition of areas for the storage or stockpiling of materials, temporary on-site parking, site offices and huts, mixing of cement or concrete, and fuel storage; (4) The means of demolition of any existing site structures, and of the re-instatement of the area currently occupied thereby; (5) The route and method of installation of drainage or any underground services in the vicinity of retained trees; Consideration will be made to avoid siting of utilities and service runs within the Root Protection Area (RPA) of all trees to be retained. Only where it can be demonstrated that there is no alternative location for the laying of utilities, will encroachment into the RPA be considered. Methodology for any installation works within the RPA will be provided and must be in compliance with the current edition of NJUG 'Guidelines for the planning and installation and maintenance of utility apparatus in proximity to trees'. (6) The details and method of construction of any other structures such as boundary walls in the RPA of retained trees and how these relate to existing ground levels; (7) The details of materials and method of construction of any roadway, driveway, parking, pathway or other surfacing within the RPA, which is to be of a 'No Dig' construction method, in accordance with the principles with in Arboricultural Association Guidance Note 12 "The use of cellular confinement systems near trees" and in accordance with current industry best practice; and is appropriate for the type of roadway required in relation to its usage. (8) Provision for the supervision of ANY works within the RPA of trees to be retained, and for the monitoring of continuing compliance with the protective measures specified, by an appropriately qualified arboricultural consultant, to be appointed at the developer's expense and notified to the Local Planning Authority, prior to the commencement of development; and provision for the regular reporting of continued compliance or any departure there from to the Local Planning Authority. Thereafter the development shall be carried out in accordance with the approved details with the agreed measures being kept in place during the entire course of development. Reason: To safeguard trees which are visually important in accordance with Policies ENV1, DES1 and DES2 of the South Oxfordshire Local Plan 2035.

Any external lighting will only be permitted in accordance with a lighting scheme to be submitted to and approved in writing by the Local Planning Authority prior to the first occupation of the development hereby approved. Details shall include: a) Details of all the equipment uses, specific lamps, luminaries and columns with images. b) For each luminaire a full technical specifications (e.g. wattage, colour rating) c) Isolux diagrams overlaid over the site and adjacent areas d) Details of lighting operation hours e) Confirmation to which Institution of Lighting Engineers Environmental Management Zones the scheme conforms to. Any such lighting shall be implemented in accordance with the approved details and directed downwards to prevent nuisance to adjoining residential occupiers from light spillage. Reason: To protect the appearance of the area, the environment and wildlife, and local residents from light pollution in accordance with Policy ENV12 of the South Oxfordshire Local Plan 2035.

Prior to the commencement of development, a full surface water drainage scheme in accordance with the surface water drainage hierarchy as set out in Part H of the Building Regulations, including details of the size, position and construction of drainage works, shall be submitted to, and approved in writing by, the Local Planning Authority. The drainage scheme shall be designed to accommodate a 1 in 30 year storm + 40% CC and shall be implemented in accordance with the approved details prior to the occupation of the development hereby approved. Reason: To ensure the proper provision of surface water drainage and to ensure flooding is not exacerbated in the locality in accordance with Policy EP4 of the South Oxfordshire Local Plan 2035.

Prior to the commencement of development, a full foul water drainage scheme shall be submitted to and approved in writing by the Local Planning Authority. The scheme shall include details of the size, position and construction of the drainage scheme, all coupled with calculations to evidence this. Thereafter the scheme as approved shall be implemented prior to the occupation of the development hereby approved. Reason: To ensure the proper provision of foul water drainage, to ensure no encroachment with the surface water drainage system and to ensure flooding and pollution is not exacerbated in the locality in accordance with policy EP4 of the South Oxfordshire Local Plan 2035.
Appeal
No appeal lodged.