The development to which this permission relates must be begun not later than the expiration of three years beginning with the date of this permission.
Reason: By virtue of Sections 91 to 95 of the Town and Country Planning Act 1990 as amended by section 51 of the Planning and Compulsory Purchase Act 2004.
Related application(s):
P21/S0860/DISThat the development hereby approved shall be carried out in accordance with the details shown on the following approved plans, P-B01-2, P-B01-1, P-B02, P004, P005, P002, P001, L-E01, L-P001, L-P02, P003, P006, P007, P008 and 126MP01, except as controlled or modified by conditions of this permission.
Reason: To secure the proper planning of the area in accordance with Development Plan policies.
Related application(s):
P21/S0860/DISThe exterior of the development hereby permitted shall only be constructed in the materials specified on the planning application form and within the Design and Access Statement or in materials which shall previously have been approved in writing by the Local Planning Authority.
Reason: In the interests of the visual appearance of the development in accordance with Policies DES1 and DES2 the South Oxfordshire Local Plan 2035.
Related application(s):
P21/S0860/DISPrior to occupation of the dwelling hereby permitted the proposed means of access onto the highway is to be formed and laid out and constructed strictly in accordance with the local highway authority's specifications and all ancillary works specified shall be undertaken.
Reason: In the interest of highway safety in accordance with Policy TRANS5 of the South Oxfordshire Local Plan 2035.
Related application(s):
P21/S0860/DISPrior to the first occupation of the development hereby approved, the parking and turning areas shall be provided in accordance with the approved plans and shall be constructed, laid out, surfaced, drained and completed to be compliant with sustainable drainage (SuDS) principles, and shall be retained unobstructed except for the parking of vehicles associated with the development at all times.
Reason: In the interests of highway safety and in accordance with Policy TRANS5 of the South Oxfordshire Local Plan 2035.
Related application(s):
P21/S0860/DISThe garage accommodation hereby approved shall be retained as such and shall not be adapted for living purposes without planning permission from the Local Planning Authority.
Reason: In the interests of highway safety and to ensure the provision of adequate off-street car parking in accordance with Policy TRANS5 of the South Oxfordshire Local Plan 2035.
Related application(s):
P21/S0860/DISThat a scheme for the landscaping of the site, including the planting of live trees and shrubs, shall be submitted to and approved in writing by the Local Planning Authority prior to the commencement of the development hereby permitted. This shall include a scheme for the replacement of Yew Trees at the front of the site. The scheme shall be implemented prior to the first occupation or use of the development hereby approved and thereafter be maintained in accordance with the approved scheme. In the event of any of the trees or shrubs so planted dying or being seriously damaged or destroyed within 5 years of the completion of the development, a new tree or shrub or equivalent number of trees or shrubs, as the case may be, of a species first approved by the Local Planning Authority, shall be planted and properly maintained in a position or positions first approved in writing by the Local Planning Authority.
Reason: To help to assimilate the development into its surroundings in accordance with Policies ENV1 and DES1 of the South Oxfordshire Local Plan 2035.
The submitted tree protection measures contained within the tree survey report form Venners Architecture, March 2020,shall be erected prior to the any works beginning on site and shall remain in place during the construction of the development.
Reason: To safeguard trees which are visually important in accordance with Policy ENV1 of the South Oxfordshire Local Plan 2035.
Prior to the commencement of development, a full surface water drainage scheme, including details of the size, position and construction of drainage works, shall be submitted to, and approved in writing by, the Local Planning Authority. The drainage scheme shall be designed to accommodate a 1 in 100 year storm + 40% CC and shall be implemented in accordance with the approved details prior to the occupation of the development hereby approved.
Reason: To ensure the proper provision of surface water drainage and to ensure flooding is not exacerbated in the locality in accordance with policy EP4 of the South Oxfordshire Local Plan 2035.
That, prior to the commencement of development, a full foul water drainage scheme shall be submitted to and approved in writing by the Local Planning Authority. The scheme shall include details of the size, position and construction of the drainage scheme, all coupled with calculations to evidence this. Thereafter the scheme as approved shall be implemented prior to the occupation of the development hereby approved.
Reason: To ensure the proper provision of foul water drainage and to ensure flooding and pollution is not exacerbated in the locality in accordance with policy EP4 of the South Oxfordshire Local Plan 2035.
Notes:
- Any Package Treatment Plant must be fabricated to BS EN12566, with treated discharge of minimum 20:30:20 standards in accordance with General Binding Rules.
- Any Drainage Field must be designed in accordance with BS 6297
Prior to the commencement of development an Energy Statement demonstrating how the development will achieve at least a 40% reduction in carbon emissions compared with code 2013 Building Regulations and details of how this will be monitored shall be submitted to the local planning authority and approved in writing.
Reason: To ensure high standards of sustainable design and construction in accordance with Policy DES10 of the South Oxfordshire Local Plan 2035.