The development to which this permission relates must be begun not later than the expiration of three years beginning with the date of this permission.
Reason: By virtue of Sections 91 to 95 of the Town and Country Planning Act 1990 as amended by section 51 of the Planning and Compulsory Purchase Act 2004.
Related application(s):
P19/S1646/DIS,
P20/S2654/DISThat the development hereby approved shall be carried out in accordance with the details shown on the following approved plans, 833-PL-02, 833-PL-11, 833-PL-12, 833-PL-05, 833-PL-07, 833-PL-09, 833-PL-04, 833-PL-06, 833-PL-06, 833-PL-01, 833-PL-03, 833-PL-13 and 833-PL-10 and 833-PL-10, except as controlled or modified by conditions of this permission.
Reason: To secure the proper planning of the area in accordance with Development Plan policies.
Related application(s):
P19/S1646/DISPrior to the commencement of the development hereby approved samples of all materials to be used in the external construction and finishes of the development hereby permitted shall be submitted to and approved in writing by the Local Planning Authority.
Reason: In the interests of the visual appearance of the development in accordance with Policy CSQ3 of the South Oxfordshire Core Strategy 2027 and Policies G2 and D1 of the South Oxfordshire Local Plan 2011.
Related application(s):
P19/S1646/DISPrior to the commencement of the development hereby permitted a scheme for the landscaping of the site, including the planting of a replacement hedge to Eyres lane and live trees and shrubs on the site, the treatment of the access road and hard standings, and the provision of boundary treatment shall be submitted to and approved in writing by the Local Planning Authority. The scheme shall be implemented prior to the first occupation or use of development and thereafter be maintained in accordance with the approved scheme. In the event of any of the trees or shrubs so planted dying or being seriously damaged or destroyed within 5 years of the completion of the development, a new tree or shrub or equivalent number of trees or shrubs, as the case may be, of a species first approved by the Local Planning Authority, shall be planted and properly maintained in a position or positions first approved in writing by the Local Planning Authority.
Reason: To help to assimilate the development into its surroundings in accordance with Policies CSEN1 and CSQ3 of the South Oxfordshire Core Strategy 2027 and Policies G2, C9 and D1 of the South Oxfordshire Local Plan 2011.
Related application(s):
P19/S1646/DISThe hours of operation for construction and demolition works shall be restricted to 08:00-18:00 Monday to Friday and 08:00-13:00 on a Saturday. No work is permitted to take place on Sundays or Public Holidays without the prior written authority of the Local Planning Authority.
Reason: To protect the occupants of nearby residential properties from noise disturbance in accordance with Policy EP2 of the South Oxfordshire Local Plan 2011.
Related application(s):
P19/S1646/DISDevelopment shall not begin until drainage works have been carried out in accordance with details to be submitted to and approved in writing by the Local Panning Authority.
Reason: To prevent pollution and flooding in accordance with Policies EP1, EP4 and EP6 of the South Oxfordshire Local Plan 2011.
Related application(s):
P19/S1646/DISThe bank to Eyres Lane shall only be removed to allow for access for construction traffic during the construction phase. Prior to the occupation of any dwelling the earth bank to the main road shall be re-instated. Details of the access for construction traffic and the re-instatement of the bank shall be submitted to and approved in writing by the LPA prior to the works being undertaken. Thereafter the bank shall be retained in accordance with the approved details.
Reason: To safeguard the character and visual appearance of the AONB in accordance with Policy CSEN1 of the South Oxfordshire Core Strategy 2027 and Policies G2 and C4 of the South Oxfordshire Local Plan 2011.
Related application(s):
P19/S1646/DISNo development shall commence on site (including any works of demolition), until a Construction Method Statement, which shall include the following:
a) the parking of vehicles of site operatives and visitors;
b) loading and unloading of plant and materials;
c) storage of plant and materials used in constructing the development;
d) the erection and maintenance of security hoarding including decorative displays and facilities for public viewing, where appropriate;
e) wheel washing facilities;
f) measures to control the emission of dust and dirt during construction;
g) a scheme for recycling/disposing of waste resulting from demolition and construction works;
h) measures for the protection of the natural environment;
i) hours of construction, including deliveries;
has been submitted to, and approved in writing by, the Local Planning Authority. The approved Statement shall be adhered to throughout the construction period. The development shall not be carried out otherwise than in accordance with the approved construction methods.
Reason: To protect the occupants of nearby residential properties from noise disturbance in accordance with Policy EP2 of the South Oxfordshire Local Plan 2011.
The vision splays shown on the approved plan 833/PL03 shall not be obstructed by any object, structure, planting or other material with a height exceeding or growing above 0.9 metres as measured from carriageway level.
Reason: In the interest of highway safety in accordance with Policy T1 of the South Oxfordshire Local Plan 2011.
Prior to the first occupation of the development hereby approved, the parking and turning areas shall be provided in accordance with the approved plan 833/PL-03 and shall be constructed, laid out, surfaced, drained and completed to be compliant with sustainable drainage (SuDS) principles, and shall be retained unobstructed except for the parking of vehicles associated with the development at all times.
Reason: In the interests of highway safety and in accordance with Policies T1 and T2 of the South Oxfordshire Local Plan 2011.
No surface water from the development shall be discharged onto the adjoining highway
Reason: In the interests of highway safety in accordance with Policy T1 of the South Oxfordshire Local Plan 2011.
Prior to the occupation of any dwelling hereby approved, one Electric Vehicle Charging Point shall be provided for that dwelling and made available for operational use. Thereafter the Electric Vehicle Charging Points shall be retained as approved, other than in the event subsequent upgraded equipment
or a replacement EVCP is installed.
Reason: To provide measures which contribute to the use of sustainable transport modes and provide facilities for charging plug-in and other ultra-low emission vehicles and address issues of adaptation to climate change, in accordance with paragraph 35 of the NPPF, and Policy CSQ2 of the South Oxfordshire Core Strategy 2027.
Prior to the commencement of development detailed plans showing the existing and proposed ground levels of the site together with the slab and ridge levels of the proposed development, relative to a fixed datum point on adjoining land outside of the application site, shall be submitted to and approved in writing by the Local Planning Authority. Thereafter the development shall be carried out in accordance with the approved details.
Reason: To ensure a satisfactory form of development in accordance with Policy CSQ3 of the South Oxfordshire Core Strategy 2027 and Policies G2, D1, D4 and H4 of the South Oxfordshire Local Plan 2011.