The development to which this permission relates must be begun not later than 13 September 2021.
Reason: By virtue of Sections 91 to 95 of the Town and Country Planning Act 1990 as amended by section 51 of the Planning and Compulsory Purchase Act 2004.
Related application(s):
P19/S4382/DIS,
P20/S0310/DIS,
P20/S3956/DIS,
P21/S0755/DISThat the development hereby approved shall be carried out in accordance with the details shown on the following approved plans (except as controlled or modified by conditions of this permission):
- Site Location Plan K1705.02.001;
- Block Plan K1705.02.002;
- Proposed Floor Plans K1705.02.016 Rev A;
- Proposed Volume K1705.02.019 Rev A;
- Proposed Areas K1705.02.021 Rev A;
- Proposed Floor Plan K1705.02.023 Rev A;
- Proposed Colour Layout K1705.02.026 Rev A;
- Access & Bin Collection K1705.02.027;
- Proposed Elevations K1705.02.028 Rev A;
- Proposed Elevations K1705.02.029 Rev A;
- Proposed Materials K1705.02.030 Rev A;
- Layout K1705.02.033.
Reason: To secure the proper planning of the area in accordance with Development Plan policies.
Related application(s):
P19/S4382/DISThe development shall be built using only the external materials specified on approved drawing K1705.02.030 Rev A - Proposed Materials, unless otherwise agreed in writing by the Local Planning Authority.
Reason: To ensure the Local Planning Authority retains control over any future development as specified in the condition in the interests of amenity and in accordance with POLICY1 of The Baldons Neighbourhood Development Plan, Policy CSQ3 of the South Oxfordshire Core Strategy 2027 and Policies G2 and D1 of the South Oxfordshire Local Plan 2011.
Prior to the occupation of the dwelling hereby permitted vision splays measuring 2.4 metres by 43 metres shall be provided to each side of the access and thereafter the vision splays shall not be obstructed by any object, structure, planting or other material with a height exceeding or growing above 0.9 metres as measured from carriageway level.
Reason: In the interest of highway safety in accordance with Policy T1 of the South Oxfordshire Local Plan 2011.
Prior to the first occupation of the development hereby approved, the parking and turning areas shall be provided in accordance with the approved plans Proposed Colour Layout K1705.02.026 Rev A and Layout K1705.02.033 and shall be constructed, laid out, surfaced, drained and completed to be compliant with sustainable drainage (SuDS) principles, and shall be retained unobstructed except for the parking of vehicles associated with the development at all times.
Reason: In the interests of highway safety and in accordance with Policies T1 and T2 of the South Oxfordshire Local Plan 2011.
The dwelling hereby approved shall not be occupied or brought into use until a scheme for the landscaping of the site, including the planting of live trees and shrubs, has been carried out in full in accordance with a written schedule (to include details of the numbers, locations, species, planting specifications and future maintenance) that has first been submitted to and approved in writing by the Local Planning Authority.
In the event of any of the trees or shrubs so planted dying or being seriously damaged or destroyed within 5 years of the completion of the development, a new tree or shrub or equivalent number of trees or shrubs, as the case may be, of a species first approved by the Local Planning Authority, shall be planted and properly maintained in a position or positions first approved in writing by the Local Planning Authority.
Reason: To help to assimilate the development into its surroundings in accordance with POLICY1 and POLICY3 of The Baldons Neighbourhood Development Plan, Policies CSEN1 and CSQ3 of the South Oxfordshire Core Strategy 2027 and Policies G2, C9 and D1 of the South Oxfordshire Local Plan 2011.
Prior to the commencement of any site works (including demolition or site clearance) a protected area shall be designated for all existing trees which are shown to be retained, and the trees shall be protected in accordance with a scheme which complies with the current edition of BS 5837: "Trees in relation to design, demolition and construction" that shall first have been submitted to, and approved in writing by, the Local Planning Authority. The agreed measures shall be kept in place during the entire course of development.
Reason: To safeguard trees which are visually important in accordance with POLICY1 and POLICY3 of The Baldons Neighbourhood Development Plan, Policies CSEN1 and CSQ3 of the South Oxfordshire Core Strategy 2027 and Policies G2, C9 and D1 of the South Oxfordshire Local Plan 2011.
Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 2015 (or any Order revoking or re-enacting that Order), the enlargement, improvement or other alteration of any dwellinghouse as described in Schedule 2, Part 1, Class A of the Order shall not be undertaken without obtaining planning permission for the Local Planning Authority.
Reason: To protect the openness of the Green Belt in accordance with POLICY1 of The Baldons Neighbourhood Development Plan, saved Policy GB4 of the South Oxfordshire Local Plan 2011, Policy CSEN2 of the South Oxfordshire Core Strategy, and Paragraph 145 of the NPPF.
Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 2015 (or any Order revoking or re-enacting that Order) the provision within the curtilage of the dwelling of any building, enclosure or swimming pool as described in Schedule 2, Part 1, Class E of the Order shall not be undertaken without obtaining planning permission for the Local Planning Authority.
Reason: To protect the openness of the Green Belt in accordance with POLICY1 of The Baldons Neighbourhood Development Plan, saved Policy GB4 of the South Oxfordshire Local Plan 2011, Policy CSEN2 of the South Oxfordshire Core Strategy, and Paragraph 145 of the NPPF.
Prior to the commencement of the development a phased risk assessment shall be carried out by a competent person in accordance with current government and Environment Agency Guidance and Approved Codes of Practice. Each phase shall be submitted to and approved in writing by the Local Planning Authority. (Phase 1 accompanied the original application).
Phase 2 shall include a comprehensive intrusive investigation in order to characterise the type, nature and extent of contamination present, the risks to receptors and if significant contamination is identified to inform the remediation strategy.
Phase 3 requires that a remediation strategy be submitted to and approved by the LPA to ensure the site will be rendered suitable for its proposed use.
Reason: To ensure that any ground, water and associated gas contamination is identified and adequately addressed to ensure the safety of the development, the environment and to ensure the site is suitable for the proposed use in accordance with Policy EP8 of the South Oxfordshire Local Plan 2011.
The development shall not be occupied until any previously approved remediation strategy has been carried out in full and a validation report confirming completion of these works has been submitted to and approved in writing by the Local Planning Authority.
Reason: To ensure that any ground, water and associated gas contamination is identified and adequately addressed to ensure the safety of the development, the environment and to ensure the site is suitable for the proposed use in accordance with Policy EP8 of the South Oxfordshire Local Plan 2011.