Planning Application Details

P15/S2971/FULApplication Type: Full Application (Show Map - opens in new window)
Status Bar
 
 Completed stage
 
 Current stage
 
 Next stage
Application registered
Consultation period
Application under consideration
Decision made
Description
Demolish the existing boathouse off Abingdon Road, Burcot and to build a new one to store and launch sculling boats and to house an electric launch. (As amended by drawings BB/P201C, BB/P101B, BB/P100D reducing the height and depth of the building accompanying statement from applicant received 23 October 2015)
Location
The Boathouse Abingdon Road Burcot Oxon OX14 3DP
Grid Reference
456627/195558
Applicant
Mr Simon Broadbent
Manor House
Dorchester-on-Thames
OX10 7HZ
Agent
Mr Shahriar Nasser
48  Parkhill Road
London
Greater London
NW3 2YP
Case Officer
Paul Bowers
Telephone: 01235 422600
Email: planning@southoxon.gov.uk
Consultation / Notification
No further Representations on this application will be accepted.

Consultations / Notifications to date are shown below.

Name / Number
Date Sent
Response Date
 
Clifton Hampden Parish Council
c/o Mrs A Davies
6 Greystones Court
Kidlington
Oxon
OX5 1AR
28 10 2015
22 09 2015
 
John Masefield Cheshire Home
Burcot
Abingdon
OX14 3DP
28 10 2015
 
Drainage Engineer (South Oxfordshire - MONSON)
28 10 2015
09 11 2015
 
Environment Agency (Lesley Tims & Cathy Harrison)
28 10 2015
02 11 2015
 
Forestry Officer (South Oxfordshire District Council)
28 10 2015
29 10 2015
 
Stag House, 111 Abingdon Road
Dorchester-on-Thames
WALLINGFORD
OX10 7LB
28 10 2015
28 10 2015
 
Burcot Brook Lodge, Burcot Brook
Burcot
ABINGDON
OX14 3DP
28 10 2015
15 09 2015
 
Application Type
Minor (Full Application)
Application Progress
Date Received  
1st September 2015
Registration Date  
3rd September 2015
Start Consultation Period  
3rd September 2015
End Consultation Period  
11th November 2015
Target Decision Date  
17th November 2015
Decision
Planning Permission on 13th November 2015
Conditions / Refusal Reasons
The development to which this permission relates must be begun not later than the expiration of three years beginning with the date of this permission. Reason: By virtue of Sections 91 to 95 of the Town and Country Planning Act 1990 as amended by section 51 of the Planning and Compulsory Purchase Act 2004. Related application(s): P16/S1633/DIS

That the development hereby approved shall be carried out in accordance with the details shown on the following approved plans, BB-P201B, BB-S100, BB-S102A, BB-S103, BB-S200, BB-P100D, BB-P101B and BB-P201C, except as controlled or modified by conditions of this permission. Reason: To secure the proper planning of the area in accordance with Development Plan policies.

The exterior of the development hereby permitted shall only be constructed in the materials specified on the plans hereby approved or in materials which shall previously have been approved in writing by the Local Planning Authority. Reason: In the interests of the visual appearance of the development in accordance with Policy CSQ3 of the South Oxfordshire Core Strategy 2027 and Policies G2 and D1 of the South Oxfordshire Local Plan 2011.

The development permitted by this planning permission shall be carried out in accordance with the approved Flood Risk Assessment (FRA) and drawing number BB/P201C, and the following mitigation measures detailed in the FRA: 1. The boat store shall be built on piers with the roof of the boathouse set no lower than 48.2m AOD; 2. Rolling shutters shall be designed to allow the free flow of water through the boathouse. The mitigation measures shall be fully implemented prior to occupation and subsequently in accordance with the timing/phasing arrangements embodied within any other period as may subsequently be agreed, in writing, by the local planning authority. Reason: To prevent flooding elsewhere, in accordance with paragraph 103 of the NPPF, by ensuring that compensatory, storage of flood water is provided and that there will be no displacement of flow.

Prior to the commencement of any site works or operations relating to the development hereby permitted, an arboricultural method statement to ensure the satisfactory protection of retained trees during the construction period shall be submitted to and approved in writing by the Local Planning Authority. Written approval must be obtained prior to commencement of any site works including demolition. The matters to be encompassed within the arboricultural method statement shall include the following:- (i) A specification for the pruning of, or tree surgery to, trees to be retained in order to prevent accidental damage by construction activities; (ii) The specification of the location, materials and means of construction of temporary protective fencing and/or ground protection in the vicinity of trees to be retained, in accordance with the recommendations of BS 5837 'Trees in relation to design, demolition and construction' and details of the timing and duration of its erection; (iii) The definition of areas for the storage or stockpiling of materials, temporary on-site parking, site offices and huts, mixing of cement or concrete, and fuel storage; (iv) The means of demolition of any existing site structures, and of the re-instatement of the area currently occupied thereby; (v) The specification of the routing and means of installation of drainage or any underground services in the vicinity of retained trees; (vi) The details and method of construction of any other structures such as boundary walls in the vicinity of retained trees and how these relate to existing ground levels; (vii) The details of the materials and method of construction of any roadway, parking, pathway or other surfacing within the RPA, which is to be of a 'no dig' construction method in accordance with the principles of Arboricultural Practice Note 12 "Through the Trees to Development", and in accordance with current industry best practice; and as appropriate for the type of roadway required in relation to its usage. (viii) Provision for the supervision of ANY works within the root protection areas of trees to be retained, and for the monitoring of continuing compliance with the protective measures specified, by an appropriately qualified arboricultural consultant, to be appointed at the developer's expense and notified to the Local Planning Authority, prior to the commencement of development; and provision for the regular reporting of continued compliance or any departure there from to the Local Planning Authority. Thereafter the development shall be carried out in accordance with the approved details with the agreed measures being kept in place during the entire course of development. Reason: To safeguard trees which are visually important in accordance with Policy CSQ3 of the South Oxfordshire Core Strategy 2027 and Policies G2, C9 and D1 of the South Oxfordshire Local Plan 2011.
Appeal
No appeal lodged.
Updates
These Planning Application Details were returned live from our back office database, and as such are as up to date as when the page was retrieved.