Planning Application Details

P14/S3242/FULApplication Type: Full Application (Show Map - opens in new window)
Status Bar
 
 Completed stage
 
 Current stage
 
 Next stage
Application registered
Consultation period
Application under consideration
Decision made
Description
Demolition of buildings and residential mobile home. Erection of a detached two-storey 5-bedroom dwelling and detached double garage and diversion of public footpath.
Location
Greyhound Kennels Judds Lane Tetsworth OX9 7AD
Grid Reference
469272/202574
Applicant
Mr M Redman
c/o Agent
Agent
Jeffrey Charles Emmett Planning Consultancy
Stable Court Studio
12a Bell Lane
THAME
OX9 3AL
Case Officer
Paul Lucas
Telephone: 01235 422600
Email: planning@southoxon.gov.uk
Consultation / Notification
No further Representations on this application will be accepted.

Consultations / Notifications to date are shown below.

Name / Number
Date Sent
Response Date
 
Tetsworth Parish Council
c/o Ms S Pullen
37 Britwell Road
Watlington
Oxon
OX49 5JT
17 10 2014
12 11 2014
 
Countryside Officer(South Oxfordshire & Vale of White Horse)
17 10 2014
05 11 2014
 
Highways Liaison Officer (Oxfordshire County Council)
17 10 2014
29 10 2014
 
Countryside Access
17 10 2014
24 10 2014
 
CPRE -N J Moon (Rights of Way)
29 10 2014
 
Health & Housing - Contaminated Land
12 11 2014
26 11 2014
 
23 Hawkswell Gardens
Oxford
OX2 7EX
13 11 2014
 
Application Type
Minor (Full Application)
Application Progress
Date Received  
13th October 2014
Registration Date  
13th October 2014
Start Consultation Period  
13th October 2014
End Consultation Period  
13th November 2014
Target Decision Date  
8th December 2014
Decision
Planning Permission on 8th December 2014
Conditions / Refusal Reasons
The development to which this permission relates must be begun not later than the expiration of three years beginning with the date of this permission. Reason: By virtue of Sections 91 to 95 of the Town and Country Planning Act 1990 as amended by section 51 of the Planning and Compulsory Purchase Act 2004. Related application(s): P16/S3113/DIS

That the development hereby approved shall be carried out in accordance with the details shown on the following approved plans, COM-001, LOC-001, PE-001 and SS-001, except as controlled or modified by conditions of this permission. Reason: To secure the proper planning of the area in accordance with Development Plan policies. Related application(s): P16/S3113/DIS

That all existing buildings on the site shall be demolished and any demolished material shall be removed from the land, before the first occupation of the new dwelling hereby permitted. Reason: To ensure satisfactory comprehensive development in accordance with Policies CSEN1 and CSQ3 of the South Oxfordshire Core Strategy 2027 and Policies G2, G4, D1 and H12 of the South Oxfordshire Local Plan 2011. Related application(s): P16/S3113/DIS

Prior to the commencement of development detailed plans showing the existing and proposed ground levels of the site together with the slab and ridge levels of the proposed development, relative to a fixed datum point on adjoining land outside of the application site, shall be submitted to and approved in writing by the Local Planning Authority. Thereafter the development shall be carried out in accordance with the approved details. Reason: To ensure a satisfactory form of development in accordance with Policies CSEN1 and CSQ3 of the South Oxfordshire Core Strategy 2027 and Policies G2, G4, D1 and H12 of the South Oxfordshire Local Plan 2011. Related application(s): P16/S3113/DIS

Prior to the commencement of the development hereby approved a schedule of all materials to be used in the external construction and finishes of the development hereby permitted shall be submitted to and approved in writing by the Local Planning Authority. Reason: In the interests of the visual appearance of the development in accordance with Policies CSEN1 and CSQ3 of the South Oxfordshire Core Strategy 2027 and Policies G2, G4, D1 and H12 of the South Oxfordshire Local Plan 2011. Related application(s): P16/S3113/DIS

Notwithstanding the provisions of the Town and Country (General Permitted Development Order) 1995 (or any Order revoking or re-enacting that Order), no development as specified in Schedule 2, Part 1, Class A - Extensions; Class B - Roof Extension; Class E - Outbuildings shall be undertaken without the prior written permission of the Local Planning Authority. Reason: The specific circumstances of this site warrant the Local Planning Authority having control over any further development as specified in the condition in the interests of amenity and in accordance with Policies CSEN1 and CSQ3 of the South Oxfordshire Core Strategy 2027 and Policies G2, G4, D1 and H12 of the South Oxfordshire Local Plan 2011. Related application(s): P16/S3113/DIS

The dwelling hereby approved shall achieve Level 4 of the Code for Sustainable Homes (or any such equivalent national measure of sustainability for house design which replaces that scheme). The dwelling shall be not be occupied until a final Code Certificate has been issued for it certifying that Code Level 4 (or any such equivalent national measure of sustainability for house design which replaces that scheme) has been achieved. Reason: To ensure high standards of sustainable design and construction in accordance with Policy CSQ2 of the South Oxfordshire Core Strategy 2027.

Prior to the first occupation of the development hereby approved, the parking and turning areas shall be provided in accordance with the approved plan 1 and shall be constructed, laid out, surfaced, drained and completed, and shall be retained unobstructed except for the parking of vehicles associated with the development at all times. Reason: In the interests of highway safety and in accordance with Policies G2, D2, H12, T1 and T2 of the South Oxfordshire Local Plan 2011.

No surface water from the development shall be discharged onto the adjoining highway. Reason: In the interests of highway safety in accordance with Policies G2, H12 and T1 of the South Oxfordshire Local Plan 2011.

Any gates provided shall be set back a minimum of 5.0 metres from the edge of the carriageway and shall open inwards into the site. Reason: To ensure that vehicles may wait clear of the highway while the gates are opened or closed in the interests of highway safety in accordance with Policies G2, H12 and T1 of the South Oxfordshire Local Plan 2011.

Prior to the commencement of the development hereby permitted a scheme for the landscaping of the site, including the planting of live trees and shrubs and the provision of boundary treatment, shall be submitted to and approved in writing by the Local Planning Authority prior to the commencement of the development hereby permitted. The hard landscaping scheme shall be implemented as approved prior to the first occupation of the development. The soft landscaping scheme shall be implemented as approved within the first planting season of the commencement of the approved development and thereafter be maintained in accordance with the approved scheme. In the event of any of the trees or shrubs so planted dying or being seriously damaged or destroyed within 5 years of the completion of the development, a new tree or shrub or equivalent number of trees or shrubs, as the case may be, of a species first approved by the Local Planning Authority, shall be planted and properly maintained in a position or positions first approved in writing by the Local Planning Authority. Reason: To help to assimilate the development into its surroundings in accordance with Policies CSEN1 and CSQ3 of the South Oxfordshire Core Strategy 2027 and Policies G2, G4, C9, D1 and H12 of the South Oxfordshire Local Plan 2011.

Prior to the commencement of any site works (including demolition or site clearance) a protected area shall be designated for all existing trees which are shown to be retained, and the trees shall be protected in accordance with a scheme which complies with the current edition of BS 5837: "Trees in relation to design, demolition and construction" that shall first have been submitted to, and approved in writing by, the Local Planning Authority. The agreed measures shall be kept in place during the entire course of development. Reason: To safeguard trees which are visually important in accordance with Policies CSEN1 and CSQ3 of the South Oxfordshire Core Strategy 2027 and Policies G2, G4, D1 and H12 of the South Oxfordshire Local Plan 2011.

Unless otherwise agreed by the Local Planning Authority 'LPA', development other than that required to be carried out as part of an approved remediation scheme must not commence until phases i) to iv) have been complied with, or further works have been deemed unnecessary as a result of conclusions based on risk assessments during phases i) or ii), and this has been agreed upon in writing by the LPA. Document(s) detailing the works undertaken in each phase must be submitted to and approved by the LPA in writing before any other phase commences, and before occupation of any building in relation to phase iv). All phases of investigation must be designed and conducted in accordance with DEFRA and the Environment Agency's 'Model Procedures for the Management of Land Contamination, CLR 11. i) A preliminary risk assessment, including a site walkover and conceptual site model detailing all potential contaminants, sources and receptors. ii) An intrusive site investigation to assess the type, nature, extent and risk(s) of any contamination identified in ii), whether or not it originates on site. It is recommended that the LPA are consulted on proposals. iii) A detailed remediation scheme, to bring the site to a condition suitable for the intended use. The scheme shall include all works to be undertaken, proposed remediation objectives and remediation criteria, a timetable of works and site management procedures. The scheme shall also ensure that after remediation the site will not qualify as Contaminated Land under Part 2A Environmental Protection Act 1990. iv) Validation of the remediation scheme demonstrating the effectiveness of the remediation approved in iv). If contamination is found during the course of development that was not previously identified, the development must be halted on that part of the site to the extent specified by the LPA and until the LPA are satisfied that all necessary phases above have been undertaken. Reason: To ensure that risks from land contamination to future users of the land and neighbouring land are minimised, together with those to controlled waters, property and ecological systems, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other offsite receptors in accordance with Policies G2, EP8 and H12 of the South Oxfordshire Local Plan 2011.

External lighting will only be permitted in accordance with a lighting scheme to be approved in writing by the Local Planning Authority. Any such lighting shall be directed downwards to prevent light spillage and shall be turned on only during the hours of operation and remain off at all other times. Reason: To safeguard the rural character of the countryside in accordance with Policies CSEN1 and CSQ3 of the South Oxfordshire Core Strategy 2027 and Policies G2, G4, D1, EP3 and H12 of the South Oxfordshire Local Plan 2011.
Appeal
No appeal lodged.
Updates
These Planning Application Details were returned live from our back office database, and as such are as up to date as when the page was retrieved.