The development shall begin within two years of the date of this approval for reserved matters.
Reason: To comply with conditions in the outline planning permission P12/S2530/O and by virtue of Sections 91 to 95 of the Town and Country Planning Act 1990 as amended by section 51 of the Planning and Compulsory Purchase Act 2004.
Related application(s):
P14/S1879/DIS,
P16/S0576/DIS,
P17/S0849/DISThat the development hereby approved shall be carried out in accordance with the details shown on the following approved plans, 12832-008B, 12832-009B, BH-1A, 12832-002F, 12832-003F, 12832-004G, 12832-007, 12832-011B, 12832-006B and 12832-10A, except as controlled or modified by conditions of this permission.
Reason: To secure the proper planning of the area in accordance with Development Plan policies.
Related application(s):
P14/S1879/DISPrior to the commencement of development samples of the materials to be used for the external walls and roofs shall be submitted to and approved in writing by the Local Planning Authority.
Reason: To ensure that the details of the development are satisfactory in accordance with Policies G2, H4 and D1 of the South Oxfordshire Local Plan 2011 and policies CSQ2 and CSEN1 of the South Oxfordshire Core Strategy.
Related application(s):
P14/S1879/DISThe dwellings shall achieve Level 3 of the Code for Sustainable Homes. No dwelling shall be occupied until a final Code Certificate has been issued for it certifying that Code Level 3 has been achieved.
Reason: To ensure high standards of sustainable design and construction in accordance with Policy CSQ2 of the South Oxfordshire Core Strategy 2027.
Related application(s):
P14/S1879/DISUnless otherwise agreed by the Local Planning Authority 'LPA', development other than that required to be carried out as part of an approved remediation scheme must not commence until phases i) to iii) have been complied with, or further works have been deemed unnecessary as a result of conclusions based on risk assessments during phase i), and this has been agreed upon in writing by the LPA.
Document(s) detailing the works undertaken in each phase must be submitted to and approved by the LPA in writing before any other phase commences, and before occupation of any building in relation to phase iii). All phases of investigation must be designed and conducted in accordance with DEFRA and the Environment Agency's 'Model Procedures for the Management of Land Contamination, CLR 11.
i) An intrusive site investigation to assess the type, nature, extent and risk(s) of any contamination, whether or not it originates on site. It is recommended that the LPA are consulted on proposals.
ii) A detailed remediation scheme, to bring the site to a condition suitable for the intended use. The scheme shall include all works to be undertaken, proposed remediation objectives and remediation criteria, a timetable of works and site management procedures. The scheme shall also ensure that after remediation the site will not qualify as Contaminated Land under Part 2A Environmental Protection Act 1990.
iii) Validation of the remediation scheme demonstrating the effectiveness of the remediation approved in ii).
If contamination is found during the course of development that was not previously identified, the development must be halted on that part of the site to the extent specified by the LPA and until the LPA are satisfied that all necessary phases above have been undertaken.
Reason: To ensure that risks from land contamination to future users of the land and neighbouring land are minimised, together with those to controlled waters, property and ecological systems, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other offsite receptors in accordance with policy EP8 of the South Oxfordshire Local Plan 2011.
Prior to the first occupation of the development hereby approved, the parking and turning areas shall be provided in accordance with the approved plan 12832-008 Rev B and shall be constructed, laid out, surfaced, drained and completed, and shall be retained unobstructed except for the parking of vehicles associated with the development at all times.
Reason: In the interests of highway safety and in accordance with Policies H4, T1 and T2 of the South Oxfordshire Local Plan 2011.
No gates shall be provided to the driveways.
Reason: To ensure that vehicles do not have to wait on the carriageway while the gates are opened or closed; in the interests of highway safety and in accordance with Policy T1 of the South Oxfordshire Local Plan 2011.
The garage accommodation shall be retained as such and shall not be adapted for living purposes without the prior written permission of the Local Planning Authority.
Reason: In the interests of highway safety and to ensure the provision of adequate off-street car parking in accordance with Policies H4, T1 and T2 and Appendix 5 (Car Parking Standards) of the South Oxfordshire Local Plan 2011.
In connection with the implementation of this permission no construction works shall take place outside the hours of 07:00 to 18:00 Mondays to Fridays and 08:00 to 13:00 on Saturdays. Works shall not take place on Sundays or Bank Holidays without the prior written approval of the Local Planning Authority.
Reason: To protect the occupants of nearby residential properties from noise and dust disturbance during the development of the site in accordance with South Oxfordshire Local Plan 2011 Policy EP1.
That a scheme for the landscaping of the site, including the planting of live trees and shrubs, shall be submitted to and approved in writing by the Local Planning Authority prior to the commencement of the development hereby permitted. The scheme shall be implemented as approved within 12 months of the commencement of the approved development and thereafter be maintained in accordance with the approved scheme. In the event of any of the trees or shrubs so planted dying or being seriously damaged or destroyed within 5 years of the completion of the development, a new tree or shrub or equivalent number of trees or shrubs, as the case may be, of a species first approved by the Local Planning Authority, be planted and properly maintained in a position or positions first approved by the Local Planning Authority.
Reason: To help to assimilate the development into its surroundings in accordance with Policies C9, H4 and D1 of the South Oxfordshire Local Plan 2011 and policy CSEN1 of the South Oxfordshire Core Strategy.
The development hereby permitted shall not be occupied until surface water drainage works have been carried out in accordance with details that have been previously submitted to and approved in writing by the Local Planning Authority.
Reason: To prevent pollution and flooding in accordance with Policies EP1, EP4 and EP6 of the South Oxfordshire Local Plan 2011 and policy CSQ2 of the South Oxfordshire Core Strategy 2027.
Prior to the commencement of development detailed plans showing the existing and proposed ground levels of the site together with the slab and ridge levels of the proposed development, relative to a fixed datum point on adjoining land outside of the application site, shall be submitted to and approved in writing by the Local Planning Authority. Thereafter the development shall be carried out in accordance with the approved details.
Reason: To ensure a satisfactory form of development in accordance with Policy CSQ3 of the South Oxfordshire Core Strategy 2027 and Policies G2 and D1 of the South Oxfordshire Local Plan 2011.
The first floor bathroom / ensuite windows in the side elevations of the dwellings hereby permitted shall be glazed in obscure glass, and shall be fixed shut with the exception of a top hung openable fanlight, prior to the first occupation of the accommodation and they shall be retained as such thereafter.
Reason: To ensure that the development is not unneighbourly in accordance with Policies D4 and H4 of the South Oxfordshire Local Plan 2011.