The development to which this permission relates must be begun not later than the expiration of three years beginning with the date of this permission.
Reason: By virtue of Sections 91 to 95 of the Town and Country Planning Act 1990 as amended by section 51 of the Planning and Compulsory Purchase Act 2004.
Related application(s):
P13/S3938/DISThat the development hereby approved shall be carried out in accordance with the details shown on the following approved plans, 13079-P03, 13079-L01, 13079-SU01, 13079-P02, 13079-P05, 13079-P03a. 13079-P01a, 13079-P04a and 13079-P06a, except as controlled or modified by conditions of this permission.
Reason: To secure the proper planning of the area in accordance with Development Plan policies.
Related application(s):
P13/S3938/DISThat the buildings specified in the application to be demolished shall be demolished prior to the first occupation of the new dwelling hereby permitted.
Reason: To ensure satisfactory comprehensive development in accordance with Policy CSQ3 of the South Oxfordshire Core Strategy 2027 and Policies G2 and D1 of the South Oxfordshire Local Plan 2011.
Related application(s):
P13/S3938/DISPrior to the commencement of the development hereby approved samples of all materials to be used in the external construction and finishes of the development hereby permitted shall be submitted to and approved in writing by the Local Planning Authority.
Reason: In the interests of the visual appearance of the development in accordance with Policy CSQ3 of the South Oxfordshire Core Strategy 2027 and Policies G2 and D1 of the South Oxfordshire Local Plan 2011.
That a scheme to secure replacement planting for the loss of the ash tree and section of boundary hedge, shall be submitted to and approved in writing by the Local Planning Authority prior to the commencement of the development hereby permitted. The scheme shall be implemented as approved within 12 months of the commencement of the approved development and thereafter be maintained in accordance with the approved scheme. In the event of any of the trees or shrubs so planted dying or being seriously damaged or destroyed within 5 years of the completion of the development, a new tree or shrub or equivalent number of trees or shrubs, as the case may be, of a species first approved by the Local Planning Authority, shall be planted and properly maintained in a position or positions first approved in writing by the Local Planning Authority.
Reason: To help to assimilate the development into its surroundings in accordance with Policy CSQ3 of the South Oxfordshire Core Strategy 2027 and Policies G2, C9 and D1 of the South Oxfordshire Local Plan 2011.
The dwelling shall achieve Level 4 of the Code for Sustainable Homes. No dwelling shall be occupied until a final Code Certificate has been issued for it certifying that Code Level 4 has been achieved.
Reason: To ensure high standards of sustainable design and construction in accordance with Policy CSQ2 of the South Oxfordshire Core Strategy 2027.
Before the proposed access is first used, the existing access onto Rectory Road, Great Haseley, shall be permanently stopped up by the means of reinstatement of the highway verge and proposed planting to the approval of the Local Planning Authority and in accordance with the local highway authority's specifications. Thereafter the closed access shall not be used by any vehicular traffic whatsoever.
Reason: In the interest of highway safety in accordance with Policy T1 of the South Oxfordshire Local Plan 2011.
The proposed vision splay shall be formed, laid out and constructed in accordance with drawing no 13079-P01A and the vision splays shall not be obstructed by any object, structure, planting or other material with a height exceeding or growing above 0.9 metres as measured from carriageway level.
Reason: In the interest of highway safety in accordance with Policy T1 of the South Oxfordshire Local Plan 2011.
Prior to the first occupation of the new dwelling hereby approved a turning area and car parking spaces shall be provided within the curtilage of the site so that motor vehicles may enter, turn round and leave in a forward direction and vehicles may park off the highway. The turning area and parking spaces shall be constructed, laid out, surfaced, drained and completed in strict accordance with specification details to be submitted to and approved in writing by the Local Planning Authority prior to the commencement of development. The turning area and car parking spaces shall be retained unobstructed except for the parking and manoeuvring of motor vehicles at all times.
As the applicant is intending to use gravel or a similar loose material on the driveway, concrete or blacktop should be laid in a 50cm strip from the boundary to the start of the gravelled area to help reduce the problem of gravel being carried onto the pavement.
Reason: In the interests of highway safety and to ensure the provision of off-street car parking in accordance with Policies T1 and T2 of the South Oxfordshire Local Plan 2011.
No surface water from the development shall be discharged onto the adjoining highway.
Reason: In the interests of highway safety in accordance with Policy T1 of the South Oxfordshire Local Plan 2011.
Any gates provided shall be set back a minimum of 5.0 metres from the edge of the carriageway and shall open inwards into the site.
Reason: To ensure that vehicles may wait clear of the highway while the gates are opened or closed in the interests of highway safety in accordance with Policy T1 of the South Oxfordshire Local Plan 2011.
The development hereby permitted shall be implemented in accordance with the recommendations contained in chapter 5 of the Ecology Survey Report produced by Windrush Ecology dated August 2013 in all respects. Any variation shall be agreed in writing by the Local Planning Authority before such change is made.
This condition will be discharged on receipt of a letter from the project ecologist providing evidence to demonstrate that the mitigation has been completed according to the approved report.
Reason: To protect the important species on the site, in accordance with Policy CSB1 of the Core Strategy and Policy C8 of the South Local Plan 2011.