The development to which this permission relates must be begun not later than the expiration of three years beginning with the date of this permission.
Reason: By virtue of Sections 91 to 95 of the Town and Country Planning Act 1990 as amended by section 51 of the Planning and Compulsory Purchase Act 2004.
Related application(s):
P13/S2708/DISThat the development hereby approved shall be carried out in accordance with the details shown on the following approved plans, TSL-02-240912, TSL-01-032013-03, TSL-01-032013-02A, TSL-01-240912-B, TSL-03-240912-B, TSL-01-032013-04B, D04 Rev 1 and D03 Rev 3, except as controlled or modified by conditions of this permission.
Reason: To secure the proper planning of the area in accordance with Development Plan policies.
Prior to the commencement of the development hereby approved samples of the materials to be used for the external walls and roofs shall be submitted to and approved in writing by the Local Planning Authority.
Reason: In the interests of the visual appearance of the development in accordance with Policy CSQ3 of the South Oxfordshire Core Strategy 2027 and Policy G2 of the South Oxfordshire Local Plan 2011.
The development hereby permitted shall be implemented in accordance with the scheme of mitigation outlined in the Biodiversity Survey and Report, dated May 2013 submitted with the application in all respects. Any variation shall be agreed in writing by the Local Planning Authority before such change is made. This condition will be discharged on receipt of a letter from the project ecologist providing evidence to demonstrate that the mitigation has been completed according to the method statement/approved report.
REASON: To protect the important species on the site, in accordance with Policy C8 of the adopted South Oxfordshire Local Plan 2011.
Informative:Your attention is drawn to the need obtain a European Protected Species (EPS) Licence before any development or demolition can proceed. You must be aware that to proceed with the development without first obtaining an EPS Licence could result in prosecution.
Prior to occupation of the dwelling hereby permitted the proposed means of access onto Slade End is to be formed and laid out and constructed strictly in accordance with the local highway authority's specifications and all ancillary works specified shall be undertaken.
Reason: In the interest of highway safety in accordance with Policy T1 of the South Oxfordshire Local Plan 2011.
Prior to the first occupation of the development hereby approved a turning area and car parking spaces shall be provided within the curtilage of the site so that motor vehicles may enter, turn round and leave in a forward direction and vehicles may park off the highway. The turning area and parking spaces shall be constructed, laid out, surfaced, drained and completed in strict accordance with specification details to be submitted to and approved in writing by the Local Planning Authority prior to the commencement of development. The turning area and car parking spaces shall be retained unobstructed except for the parking and manoeuvring of motor vehicles at all times.
Reason: In the interests of highway safety and to ensure the provision of off-street car parking in accordance with Policies T1 and T2 of the South Oxfordshire Local Plan 2011.
No surface water from the development shall be discharged onto the adjoining highway
Reason: In the interests of highway safety in accordance with Policy T1 of the South Oxfordshire Local Plan 2011.
The garage accommodation hereby approved shall be retained as such and shall not be adapted for living purposes without the prior written permission of the Local Planning Authority.
Reason: In the interests of highway safety and to ensure the provision of adequate off-street car parking in accordance with Policies T1 and T2 of the South Oxfordshire Local Plan 2011.
That, prior to the commencement of development the existing house shall be demolished and the materials removed from the land.
Reason: To ensure satisfactory comprehensive development in accordance with Policy G2, D1 and H4 of the South Oxfordshire Local Plan 2011.
The dwelling shall achieve Level 4 of the Code for Sustainable Homes as per the Planning Statement dated March 2013. The dwelling shall be occupied until a final Code Certificate has been issued for it certifying that Code Level 4 has been achieved.
Reason: To ensure high standards of sustainable design and construction in accordance with Policy CSQ2 of the South Oxfordshire Core Strategy 2027.