Planning Application Details

P12/S0876/FULApplication Type: Full Application (Show Map - opens in new window)
Status Bar
 
 Completed stage
 
 Current stage
 
 Next stage
Application registered
Consultation period
Application under consideration
Decision made
Description
Demolition of existing dwelling and construction of two new detached family homes (as amended by drawing R.374.06C and R.374.07A and appendix 7 of the tree report accompanying Agents letter dated 17 July 2012).
Location
88 Peppard Road Sonning Common RG4 9RL
Grid Reference
471098/180224
Applicant
Goodrock Properties Limited
32A Grove Road
Sonning Common
READING
RG4 9RL
Agent
Mr Paul Watson
Phillips Planning Services Ltd
Kingsbrook House
7 Kingsway
BEDFORD
MK42 9BA
Case Officer
Emma Bowerman
Telephone: 01235 422600
Email: planning@southoxon.gov.uk
Consultation / Notification
No further Representations on this application will be accepted.

Consultations / Notifications to date are shown below.

Name / Number
Date Sent
Response Date
 
Sonning Common Parish Council
c/o Mr Philip Collings
Village Hall
Wood Lane
Sonning Common
Oxon
RG4 9SL
19 07 2012
07 08 2012
 
84 Peppard Road
Sonning Common
Reading
RG4 9RP
19 07 2012
 
86 Peppard Road
Sonning Common
Sonning Common
South Oxon
RG4 9RP
19 07 2012
02 08 2012
 
17 Red House Drive
Sonning Common
Reading
RG4 9NT
19 07 2012
 
18 Red House Drive
Sonning Common
Reading
RG4 9NT
19 07 2012
 
19 Red House Drive
Sonning Common
Reading
RG4 9NT
19 07 2012
 
20 Red House Drive
Sonning Common
Reading
RG4 9NT
19 07 2012
 
1 Heather Close
Sonning Common
Reading
RG4 9EF
19 07 2012
20 06 2012
 
87 Peppard Road
Sonning Common
READING
RG4 9RN
19 07 2012
 
89 Peppard Road
Sonning Common
READING
RG4 9RN
19 07 2012
 
6 Heather Close
Sonning Common
READING
RG4 9EF
19 07 2012
 
16 Red House Drive
Sonning Common
READING
RG4 9NT
19 07 2012
 
2 Heather Close
Sonning Common
READING
RG4 9EF
19 07 2012
 
5 Grove Road
Sonning Common
READING
RG4 9RH
19 07 2012
12 06 2012
 
3 Grove Road
Sonning Common
READING
RG4 9RH
19 07 2012
 
1A Grove Road
Sonning Common
READING
RG4 9RH
19 07 2012
03 08 2012
 
Countryside Access
01 06 2012
11 06 2012
 
Countryside Officer
01 06 2012
03 07 2012
 
Forestry Officer MDG
19 07 2012
13 08 2012
 
Area Liaison Officer
19 07 2012
28 06 2012
 
Waste Management Officer
01 06 2012
 
Application Type
Minor (Full Application)
Application Progress
Date Received  
24th May 2012
Registration Date  
24th May 2012
Start Consultation Period  
24th May 2012
End Consultation Period  
21st June 2012
Target Decision Date  
19th July 2012
Decision
Planning Permission on 24th August 2012
Conditions / Refusal Reasons
The development to which this permission relates must be begun not later than the expiration of three years beginning with the date of this permission. Reason: By virtue of Sections 91 to 95 of the Town and Country Planning Act 1990 as amended by section 51 of the Planning and Compulsory Purchase Act 2004. Related application(s): P12/S2292/DIS

That the development hereby approved shall be carried out in accordance with the details shown on the following approved plans, R.374-05, R.374.01, R.343.02, R.374.03, R.374.04, GS-CW-G-150A, R-374-06C and R-374-07A, except as controlled or modified by conditions of this permission. Reason: To secure the proper planning of the area in accordance with Development Plan policies. Related application(s): P12/S2292/DIS

That those buildings shown to be demolished on the plans accompanying the application shall be demolished, and any demolished material which is not to be utilised in the new development shall be removed from the land, before the development hereby permitted commences, and this provision shall apply unless an alternative scheme for the phased demolition of the buildings and removal of materials shall first have been submitted to and approved in writing by the Local Planning Authority. Reason: To ensure satisfactory comprehensive development in accordance with Policies G2, G6, H4 and D1 of the South Oxfordshire Local Plan 2011. Related application(s): P12/S2292/DIS

Prior to the commencement of development samples of all materials to be used in the external construction and finishes of the development hereby permitted shall be submitted to and approved in writing by the Local Planning Authority. Reason: To safeguard the character of the area in accordance with Policies G2, G6, H4 and D1 of the South Oxfordshire Local Plan 2011. Related application(s): P12/S2292/DIS

The first floor bathroom and en-suite windows in the northeast and southwest (side) elevations of the dwellings hereby permitted shall not at any time be glazed other than with obscured glass. They shall be fixed shut, with the exception of a top hung openable fanlight and be permanently so retained thereafter. Reason: To ensure that the development is not unneighbourly in accordance with Policies H4 and D4 of the South Oxfordshire Local Plan 2011. Related application(s): P12/S2292/DIS

Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 1995 (or any Order revoking or re-enacting that Order), the enlargement of any dwellinghouse as described in Schedule 2, Part 1, Class A of the Order shall not be undertaken without the prior written permission of the Local Planning Authority. Reason: To ensure the Local Planning Authority retains control over any future development as specified in the condition in the interests of amenity and in accordance with Policies G2 and D1 of the South Oxfordshire Local Plan 2011.

The measures set out in the sustainability statement, which accompanied the application, in respect of sustainable building, shall be implemented in accordance with the statement prior to the first occupation of any unit, unless as may otherwise be agreed in writing by the Local Planning Authority. Reason: To ensure sustainable development in accordance with Policy D8 of the adopted South Oxfordshire Local Plan.

Prior to the first occupation of the development, the parking and turning areas shall be provided in accordance with the approved plan and shall be constructed, laid out, surfaced, drained and completed, and shall be retained unobstructed except for the parking of vehicles at all times. Reason: In the interests of highway safety and in accordance with Policies T1 and T2 and Appendix 5 (Car Parking Standards) of the South Oxfordshire Local Plan 2011.

No surface water from the development shall be discharged onto the adjoining highway and a scheme to prevent this occurrence shall be submitted to and approved in writing by the Local Planning Authority and constructed prior to the commencement of building operations. Reason: In the interests of highway safety and in accordance with Policies T1 and EP6 of the South Oxfordshire Local Plan 2011.

Prior to the commencement of any works on site (including demolition), a Construction Traffic Management Plan (CTMP) shall be submitted to and approved in writing by the Local Planning Authority and shall be implemented as approved. Reason: In the interests of highway safety and to mitigate the impact of construction vehicles on the surrounding highway network, road infrastructure and local residents, particularly at morning and afternoon peak traffic times and in accordance with policy T1 of the South Oxfordshire Local Plan 2011.

Prior to the commencement of any site works or operations relating to the development hereby permitted, an arboricultural method statement to ensure the satisfactory protection of retained trees during the construction period shall be submitted to and approved in writing by the Local Planning Authority. Written approval must be obtained prior to commencement of any site works including demolition. The matters to be encompassed within the arboricultural method statement shall include the following: (i) A specification for the pruning of, or tree surgery to, trees to be retained in order to prevent accidental damage by construction activities; (ii) The specification of the location, materials and means of construction of temporary protective fencing and/or ground protection in the vicinity of trees to be retained, in accordance with the recommendations of the current edition of BS 5837 ''Trees in relation to design, demolition and construction'', and details of the timing and duration of its erection; (iii) The definition of areas for the storage or stockpiling of materials, temporary on-site parking, site offices and huts, mixing of cement or concrete, and fuel storage; (iv) The means of demolition any existing site structures, and of the re-instatement of the area currently occupied thereby; (v) The specification of the routing and mean of installation of drainage or any underground services in the vicinity of retained trees; Consideration will be made to avoid the sighting of utilities and service runs within the Root Protection Area (RPA) of all trees to be retained. Only where it can be demonstrated that there is no alternative location for the laying of utilities, will encroachment into the RPA be considered. Methodology for any installation works within the RPA will be provided and must be in compliance with NJUG Volume 4, 2007 'Guidelines for the planning and installation and maintenance of utility apparatus in proximity to trees'. (vi) The details and method of construction of any other structures such as boundary walls in the vicinity of retained trees and how these relate to existing ground levels; (vii) The details of the materials and method of construction of any roadway, parking, pathway or other surfacing within the RPA, which is to be of a 'no dig' construction method in accordance with the principles of Arboricultural Practice Note 12 "Through the Trees to Development'', and in accordance with current industry best practice; and as appropriate for the type of roadway required in relation to its usage. (viii) Provision for the supervision of ANY works within the root protection areas of trees to be retained, and for the monitoring of continuing compliance with the protective measures specified, by an appropriately qualified arboricultural consultant, to be appointed at the developer's expense and notified to the Local Planning Authority, prior to the commencement of development; and provision for the regular reporting of continued compliance or any departure there from to the Local Planning Authority. Reason: To safeguard trees which are visually important in accordance with Policies C9 and D1 of the South Oxfordshire Local Plan 2011.

Unless otherwise agreed by the Local Planning Authority 'LPA', development other than that required to be carried out as part of an approved remediation scheme must not commence until phases i) to iv) have been complied with, or further works have been deemed unnecessary as a result of conclusions based on risk assessments during phases i), ii) or iii), and this has been agreed upon in writing by the LPA. Document(s) detailing the works undertaken in each phase must be submitted to and approved by the LPA in writing before any other phase commences, and before occupation of any building in relation to phase v). All phases of investigation must be designed and conducted in accordance with DEFRA and the Environment Agency's 'Model Procedures for the Management of Land Contamination, CLR 11. i) A South Oxfordshire District Council contaminated land statement questionnaire. ii) A preliminary risk assessment, including a site walkover and conceptual site model detailing all potential contaminants, sources and receptors. iii) An intrusive site investigation to assess the type, nature, extent and risk(s) of any contamination identified in ii), whether or not it originates on site. It is recommended that the LPA are consulted on proposals. iv) A detailed remediation scheme, to bring the site to a condition suitable for the intended use. The scheme shall include all works to be undertaken, proposed remediation objectives and remediation criteria, a timetable of works and site management procedures. The scheme shall also ensure that after remediation the site will not qualify as Contaminated Land under Part 2A Environmental Protection Act 1990. v) Validation of the remediation scheme demonstrating the effectiveness of the remediation approved in iv). If contamination is found during the course of development that was not previously identified, the development must be halted on that part of the site to the extent specified by the LPA and until the LPA are satisfied that all necessary phases above have been undertaken. Reason: To ensure that risks from land contamination to future users of the land and neighbouring land are minimised, together with those to controlled waters, property and ecological systems, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other offsite receptors in accordance with policy EP8 of the adopted South Oxfordshire Local Plan.
Appeal
No appeal lodged.
Updates
These Planning Application Details were returned live from our back office database, and as such are as up to date as when the page was retrieved.