Planning Application Details

P11/W2133Application Type: No Type (Show Map - opens in new window)
Status Bar
 
 Completed stage
 
 Current stage
 
 Next stage
Application registered
Consultation period
Application under consideration
Decision made
Description
Erection of two storey detached building comprising one ground floor and one first floor flat. Sub-division of gardens, erection of fences and creation of parking areas and vehicle cross overs to highway. As amended and amplified by Agent's e-mail and accompanying plans received on 06 March 2012.
Location
42 High Street Didcot OX11 8EG
Grid Reference
452921/189658
Applicant
Mr M Deeley
Portelet
Hithercroft
South Moreton
DIDCOT
OX11 9AL
Agent
AT Home Designs Ltd
Anchor Lane
Anchor Cottage
South Moreton
DIDCOT
OX11 9AN
Case Officer
Gabriella Brown
Telephone: 01235 422600
Email: planning@southoxon.gov.uk
Consultation / Notification
No further Representations on this application will be accepted.

Consultations / Notifications to date are shown below.

Name / Number
Date Sent
Response Date
 
Didcot Town Council
Civic Hall
Britwell Road
DIDCOT
Oxon
OX11 7HN
08 02 2012
01 03 2012
 
40 High Street
DIDCOT
Oxon
OX11 8EG
07 02 2012
28 02 2012
 
22 Kynaston Road
DIDCOT
OX11 8HD
07 02 2012
 
Area Liaison Officer
07 03 2012
20 02 2012
 
Civic Hall
Britwell Road
DIDCOT
Oxon
OX11 7HN
23 02 2012
 
42 High Street
DIDCOT
OX11 8EG
19 03 2012
 
Application Type
Minor
Application Progress
Date Received  
23rd January 2012
Registration Date  
23rd January 2012
Start Consultation Period  
23rd January 2012
End Consultation Period  
28th February 2012
Target Decision Date  
19th March 2012
Decision
Planning Permission on 23rd April 2012
Conditions / Refusal Reasons
The development to which this permission relates must be begun not later than the expiration of three years beginning with the date of this permission. Reason: By virtue of Sections 91 to 95 of the Town and Country Planning Act 1990 as amended by section 51 of the Planning and Compulsory Purchase Act 2004. Related application(s): P12/S1197/DIS

That the development hereby approved shall be carried out in accordance with the details shown on the following approved plans, 1 10 PP03, 1 10 PP04, 1 10 PP05, 1 10 PP07a, 1 10 PP10 and 1 10 PP11, except as controlled or modified by conditions of this permission. Reason: To secure the proper planning of the area in accordance with Development Plan policies. Related application(s): P12/S1197/DIS

Prior to the commencement of development samples of all materials to be used in the external construction and finishes of the development hereby permitted shall be submitted to and approved in writing by the local planning authority. Reason: To safeguard the character of the area in accordance with Policies D1, G2, G6 and H4 of the South Oxfordshire Local Plan 2011.

The first floor bathroom window in the west facing elevation of the building hereby permitted shall be glazed in obscure glass prior to the first occupation of the accommodation and it shall be retained as such thereafter. Reason: To ensure that the development is not unneighbourly in accordance with Policy D4 of the South Oxfordshire Local Plan 2011.

The ground floor kitchen window in the north facing elevation of the building hereby permitted shall be glazed in obscure glass prior to the first occupation of the accommodation and fixed shut and it shall be retained as such thereafter. Reason: To ensure that the development is not unneighbourly in accordance with Policy D4 of the South Oxfordshire Local Plan 2011.

The dwellings hereby permitted shall be designed to incorporate sustainable methods of construction, making reference to Code Level 3 of the Code for Sustainable Homes. Reason: To ensure high standards in the conservation and efficient use of energy, water and materials, in accordance with Policy D8 of the adopted South Oxfordshire Local Plan 2011.

Prior to the first occupation of the development, the parking and turning areas shall be provided in accordance with the approved plan 1 10 PP07a and shall be constructed, laid out, surfaced, drained and completed, and shall be retained unobstructed except for the parking of vehicles at all times. Reason: In the interests of highway safety and in accordance with Policies T1 and T2 and Appendix 5 (Car Parking Standards) of the South Oxfordshire Local Plan 2011. For the avoidance of doubt any introduced manoeuvring area surfacing used shall be installed to be compliant with Sustainable Drainage (SuDS) regulations. Any unbound material used in production of any manoeuvring space shall be retained on site through some mechanism to be submitted for approval to the LPA and shall be constructed, laid out, surfaced and completed in accordance with the approved plans.

The existing hedge that is shown to be retained on the approved plan 1 10 PP07a shall be retained and properly maintained at a height of not less than 1.5 metres and any plant which may die or be seriously damaged or destroyed within 5 years of the completion of the development shall be replaced and the replacement shall be properly maintained. Reason: To safeguard vegetation which is visually important to the character of the locality in accordance with Policies G6 and H4 of the South Oxfordshire Local Plan 2011.

Unless otherwise agreed by the Local Planning Authority 'LPA', development other than that required to be carried out as part of an approved remediation scheme must not commence until phases i) to iv) have been complied with, or further works have been deemed unnecessary as a result of conclusions based on risk assessments during phases i), ii) or iii), and this has been agreed upon in writing by the LPA. Document(s) detailing the works undertaken in each phase must be submitted to and approved by the LPA in writing before any other phase commences, and before occupation of any building in relation to phase v). All phases of investigation must be designed and conducted in accordance with DEFRA and the Environment Agency's 'Model Procedures for the Management of Land Contamination, CLR 11. i) A South Oxfordshire District Council contaminated land statement questionnaire. ii) A preliminary risk assessment, including a site walkover and conceptual site model detailing all potential contaminants, sources and receptors. iii) An intrusive site investigation to assess the type, nature, extent and risk(s) of any contamination identified in ii), whether or not it originates on site. It is recommended that the LPA are consulted on proposals. iv) A detailed remediation scheme, to bring the site to a condition suitable for the intended use. The scheme shall include all works to be undertaken, proposed remediation objectives and remediation criteria, a timetable of works and site management procedures. The scheme shall also ensure that after remediation the site will not qualify as Contaminated Land under Part 2A Environmental Protection Act 1990. v) Validation of the remediation scheme demonstrating the effectiveness of the remediation approved in iv). If contamination is found during the course of development that was not previously identified, the development must be halted on that part of the site to the extent specified by the LPA and until the LPA are satisfied that all necessary phases above have been undertaken. Reason: To ensure that risks from land contamination to future users of the land and neighbouring land are minimised, together with those to controlled waters, property and ecological systems, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other offsite receptors in accordance with policy EP8 of the adopted South Oxfordshire Local Plan.
Appeal
No appeal lodged.
Updates
These Planning Application Details were returned live from our back office database, and as such are as up to date as when the page was retrieved.