The development to which this permission relates must be begun not later than the expiration of three years beginning with the date of this permission.
Reason: By virtue of Sections 91 to 95 of the Town and Country Planning Act 1990 as amended by section 51 of the Planning and Compulsory Purchase Act 2004.
Related application(s):
P12/S2986/DIS,
P13/S0194/DISThat the development hereby approved shall be carried out in accordance with the details shown on the following approved plans, 5293-04C, 05A, 06A and 07 except as controlled or modified by conditions of this permission.
Reason: To secure the proper planning of the area in accordance with Development Plan policies.
Related application(s):
P12/S2986/DISPrior to the commencement of development samples of all materials to be used in the external construction and finishes of the development hereby permitted shall be submitted to and approved in writing by the Local Planning Authority.
Reason: To safeguard the character of the area in accordance with Policy D1 of the South Oxfordshire Local Plan 2011.
Related application(s):
P12/S2986/DISBefore the proposed access is first used, the existing access onto Cockcroft Road shall be permanently stopped up by the means of reinstatement of the highway footway to the approval of the Local Planning Authority and in accordance with the local highway authority's specifications. Thereafter the closed access shall not be used by any vehicular traffic whatsoever.
Reason: In the interest of highway safety and in accordance with Policy T1 of the South Oxfordshire Local Plan 2011.
Related application(s):
P12/S2986/DISUnless otherwise agreed by the Local Planning Authority 'LPA', development other than that required to be carried out as part of an approved remediation scheme must not commence until phases i) to iv) have been complied with, or further works have been deemed unnecessary as a result of conclusions based on risk assessments during phases i) or ii), and this has been agreed upon in writing by the LPA.
Document(s) detailing the works undertaken in each phase must be submitted to and approved by the LPA in writing before any other phase commences, and before occupation of any building in relation to phase iv). All phases of investigation must be designed and conducted in accordance with DEFRA and the Environment Agency's 'Model Procedures for the Management of Land Contamination, CLR 11.
i) A preliminary risk assessment, including a site walkover and conceptual site model detailing all potential contaminants, sources and receptors.
ii) An intrusive site investigation to assess the type, nature, extent and risk(s) of any contamination identified in ii), whether or not it originates on site. It is recommended that the LPA are consulted on proposals.
iii) A detailed remediation scheme, to bring the site to a condition suitable for the intended use. The scheme shall include all works to be undertaken, proposed remediation objectives and remediation criteria, a timetable of works
and site management procedures. The scheme shall also ensure that after remediation the site will not qualify as Contaminated Land under Part 2A Environmental Protection Act 1990.
iv) Validation of the remediation scheme demonstrating the effectiveness of the remediation approved in iii).
If contamination is found during the course of development that was not previously identified, the development must be halted on that part of the site to the extent specified by the LPA and until the LPA are satisfied that all necessary phases above have been undertaken.
Reason: To ensure that risks from land contamination to future users of the land and neighbouring land are minimised, together with those to controlled waters, property and ecological systems, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other offsite receptors in accordance with Policy EP8 of the South Oxfordshire Local Plan 2011.
Prior to the first occupation of the dwellings, the car and cycle parking shall be provided in accordance with the approved plan 5293 -06A and shall be constructed, laid out, surfaced (bound material), drained and completed, and shall be retained unobstructed except for the parking of vehicles at all times.
Reason: In the interests of highway safety and in accordance with Policies T1 and T2 and Appendix 5 (Car Parking Standards) of the South Oxfordshire Local Plan 2011.
Prior to the commencement of the development hereby permitted a scheme for the landscaping of the site, including the planting of live trees and shrubs and the provision of boundary fencing on the boundary with the allotments to the west of the site, shall be submitted to and approved in writing by the Local Planning Authority prior to the commencement of the development hereby permitted. The scheme shall be implemented as approved within 12 months of the commencement of the approved development and thereafter be maintained in accordance with the approved scheme. In the event of any of the trees or shrubs so planted dying or being seriously damaged or destroyed within 5 years of the completion of the development, a new tree or shrub or equivalent number of trees or shrubs, as the case may be, of a species first approved by the Local Planning Authority, be planted and properly maintained in a position or positions first approved by the Local Planning Authority.
Reason: To help to assimilate the development into its surroundings in accordance with Policies C9 and D1 of the South Oxfordshire Local Plan 2011.
Prior to the first occupation of the development hereby permitted, a turning area shall be provided within the curtilage of the site so that motor vehicles may enter, turn around and leave in a forward direction. The turning area shall be constructed, laid out, surfaced, drained and completed in accordance with specification details to be submitted to and approved in writing by the Local Planning Authority prior to the commencement of development and shall be retained unobstructed except for the manoeuvring of motor vehicles at all times.
Reason: In the interests of highway safety and in accordance with Policy T1 of the South Oxfordshire Local Plan 2011.
The development hereby permitted shall not commence until surface water drainage works have been carried out in accordance with details that have been submitted to and approved in writing by the Local Planning Authority.
Reason: To prevent pollution and flooding in accordance with Policies EP1, EP4 and EP6 of the South Oxfordshire Local Plan 2011.
Prior to the commencement of development a scheme for the provision of bollards within the highway verge on both road frontages of Cockcroft Road shall be submitted to and approved in writing by the Local Planning Authority. The bollards shall be provided in accordance with the approved scheme prior to the first occupation of the dwellings.
Reason: To protect the highway verges in the interests of highway safety and in accordance with Policy T1 of the South Oxfordshire Local Plan 2011.