The development to which this permission relates must be begun not later than the expiration of three years beginning with the date of this permission.
Reason: By virtue of Sections 91 to 95 of the Town and Country Planning Act 1990 as amended by section 51 of the Planning and Compulsory Purchase Act 2004.
Related application(s):
P11/W0359/DISThat the development hereby approved shall be carried out in accordance with the details shown on the following approved plans, drawing number 33 and Existing Access Plan dated 21.09.2010 except as controlled or modified by conditions of this permission.
Reason: To secure the proper planning of the area in accordance with Development Plan policies.
All power washing should be directed away from the cliff face which is the interest feature
of the SSSI.
Reason: To safeguard an important natural feature of the site in accordance with Policy C7 of the South Oxfordshire Local Plan 2011.
Unless otherwise agreed by the Local Planning Authority 'LPA', development other than that required to be carried out as part of an approved remediation scheme must not commence until phases i) to iv) have been complied with, or further works have been deemed unnecessary as a result of conclusions based on risk assessments during phases i), ii) or iii), and this has been agreed upon in writing by the LPA.
Document(s) detailing the works undertaken in each phase must be submitted to and approved by the LPA in writing before any other phase commences, and before occupation of any building in relation to phase v). All phases of investigation must be designed and conducted in accordance with DEFRA and the Environment Agency's 'Model Procedures for the Management of Land Contamination, CLR 11.
i) A South Oxfordshire District Council contaminated land statement questionnaire.
ii) A preliminary risk assessment, including a site walkover and conceptual site model detailing all potential contaminants, sources and receptors.
iii) An intrusive site investigation to assess the type, nature, extent and risk(s) of any contamination identified in ii), whether or not it originates on site. It is recommended that the LPA are consulted on proposals.
iv) A detailed remediation scheme, to bring the site to a condition suitable for the intended use. The scheme shall include all works to be undertaken, proposed remediation objectives and remediation criteria, a timetable of works and site management procedures. The scheme shall also ensure that after remediation the site will not qualify as Contaminated Land under Part 2A Environmental Protection Act 1990.
v) Validation of the remediation scheme demonstrating the effectiveness of the remediation approved in iv).
If contamination is found during the course of development that was not previously identified, the development must be halted on that part of the site to the extent specified by the LPA and until the LPA are satisfied that all necessary phases above have been undertaken.
Reason: To ensure that risks from land contamination to future users of the land and neighbouring land are minimised, together with those to controlled waters, property and ecological systems, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other offsite receptors in accordance with Policy EP8 of the South Oxfordshire Local Plan 2011.
Prior to the occupation of the development, the parking and turning areas shall be provided in accordance with the submitted plan Drawing dated 21.9.2010, and shall be constructed, laid out, surfaced, drained and completed, and shall be retained unobstructed except for the parking of vehicles at all times.
Reason: In the interest of highway safety and in accordance with Policies T1 and T2 and Appendix 5 (car Parking Standards) of the South Oxfordshire Local Plan 2011.
Any introduced manoeuvring area surfacing used shall be installed to be compliant with Sustainable Drainage (SuDS) regulations. Any unbound material used in production of any manoeuvring space shall be retained on site through some mechanism to be submitted for approval to the LA and shall be constructed, laid out, surfaced drained and completed in accordance with approved plans.
Reason: In the interest of highway safety and in accordance with Policies T1 and T2 and Appendix 5 (car Parking Standards) of the South Oxfordshire Local Plan 2011.
Prior to the beneficial occupation of the proposed depot vision splays measuring 2.4m X 214m to the North of the access and 188m to the South of the access shall be provided and shall be maintained, as such, throughout the use of the site.
Reason: In the interest of highway safety and in accordance with Policy T1 of the South Oxfordshire Local Plan 2011.
Notwithstanding the submitted drawings (dated 21.9.2010) any gates provided shall be set back a minimum of 19.0 metres from the edge of the carriageway, and shall open inwards into the site.
Reason: To ensure that vehicles may wait clear of the carriageway or footway while the gates are opened or closed in the interests of highway safety and in accordance with Policy T1 of the South Oxfordshire Local Plan 2011.