Planning Application Details

P10/E1830Application Type: No Type (Show Map - opens in new window)
Status Bar
 
 Completed stage
 
 Current stage
 
 Next stage
Application registered
Consultation period
Application under consideration
Decision made
Description
Erection of two storey four-bedroom replacement dwelling and new access. As additional information received 17th January 2011.
Location
Parkside Ipsden OX10 6AD
Grid Reference
464047/185738
Applicant
Mr & Mrs P Kirby
Whitehall Cottage
Whitehall Lane
Checkendon
READING
RG8 oTR
Agent
Mr Christopher Helsby
The Studio
70 Church Road
Wheatley
OXFORD
OX33 1LZ
Case Officer
Paul Lucas
Telephone: 01235 422600
Email: planning@southoxon.gov.uk
Consultation / Notification
No further Representations on this application will be accepted.

Consultations / Notifications to date are shown below.

Name / Number
Date Sent
Response Date
 
c/o Mrs S D Baker
Watership Down
Crabtree Corner
Ipsden
WALLINGFORD  Oxon
OX10 6BN
10 12 2010
10 01 2011
 
Countryside Officer
10 12 2010
17 12 2010
 
Waste Management Officer
10 12 2010
15 12 2010
 
CPRE -N J Moon (Rights of Way)
10 12 2010
10 12 2010
 
OCC Countryside Service
10 12 2010
15 12 2010
 
Hawthorns
Ipsden
WALLINGFORD
OX10 6AD
09 12 2010
 
Application Type
Minor
Application Progress
Date Received  
30th November 2010
Registration Date  
6th December 2010
Start Consultation Period  
6th December 2010
End Consultation Period  
18th January 2011
Target Decision Date  
31st January 2011
Decision
Planning Permission on 28th January 2011
Conditions / Refusal Reasons
The development to which this permission relates must be begun not later than the expiration of three years beginning with the date of this permission. Reason: By virtue of Sections 91 to 95 of the Town and Country Planning Act 1990 as amended by section 51 of the Planning and Compulsory Purchase Act 2004.

That the development hereby approved shall be carried out in accordance with the details shown on the following approved plans, 10016-P01B, 10016-P02C, 10016-P03C and 10016-P0B, except as controlled or modified by conditions of this permission. Reason: To secure the proper planning of the area in accordance with Development Plan policies.

Prior to the commencement of development detailed plans showing the existing and proposed ground levels of the site together with the slab levels and ridge heights of the proposed development, relative to a fixed datum point on adjoining land, shall be submitted to, and approved in writing by the Local Planning Authority. Reason: To ensure that the development properly relates to the levels of adjoining land in the interests of residential amenity and the character of the area in accordance with Policies G2, G6, C1, C2, D1, D4 and H12 of the South Oxfordshire Local Plan 2011.

Prior to the commencement of development a schedule of all materials to be used in the external construction and finishes of the development hereby permitted shall be submitted to and approved in writing by the local planning authority. Reason: To safeguard the character and appearance of the surrounding area in accordance with Policies G2, G6, C4, D1 and H12 of the South Oxfordshire Local Plan 2011.

Notwithstanding the provisions of the Town and Country (General Permitted Development Order) 1995 (or any Order revoking or re-enacting that Order), no development as specified in Schedule 2, Part 1, Classes A, C and E shall be undertaken without the prior written permission of the Local Planning Authority. Reason: The specific circumstances of this site warrant the Local Planning Authority having control over any further development as specified in the condition in the interests of the character of the surrounding area and residential amenity and in accordance with Policies G2, G6, C1, C2, D1, D4 and H12 of the South Oxfordshire Local Plan 2011.

The development hereby permitted shall be designed and constructed with the sustainable measures as set out in the application and these measures shall be in place prior to the first occupation of the development and thereafter retained as such. Reason: To ensure sustainable development in accordance with Policies G2, D8 and H12 of the South Oxfordshire Local Plan 2011.

Prior to the first occupation of the development, a scheme of waste storage and collection facilities shall be submitted to and approved in writing by the Local Planning Authority and shall be thereafter implemented and retained as such unless otherwise agreed. Reason: To ensure adequate provision for the management of waste in accordance with Policies G2, D10 and H12 of the South Oxfordshire Local Plan 2011.

Prior to the first occupation of the development, the parking and turning areas shall be provided in accordance with the approved plan 10016-P01B and shall be constructed, laid out, surfaced (bound material), drained and completed, and shall be retained unobstructed except for the parking of vehicles at all times. Reason: In the interests of highway safety and in accordance with Policies G2, D2, H12, T1 and T2 and Appendix 5 (Car Parking Standards) of the South Oxfordshire Local Plan 2011.

No surface water from the development shall be discharged onto the adjoining highway and a scheme to prevent this occurrence shall be submitted to and approved in writing by the Local Planning Authority and constructed prior to the commencement of building operations. Reason: In the interests of highway safety and in accordance with Policies G2, EP6, H12 and T1 of the South Oxfordshire Local Plan 2011.

Notwithstanding the plans as shown on approved plan 100016-P01A, any gates provided shall be set back a minimum of 5.0 metres from the edge of the carriageway and shall open inwards into the site. Reason: To ensure that vehicles may wait clear of the highway while the gates are opened or closed in the interests of highway safety and in accordance with Policies G2, H12 and T1 of the South Oxfordshire Local Plan 2011.

That a scheme for the landscaping of the site, including the planting of live trees and shrubs, shall be submitted to and approved in writing by the Local Planning Authority prior to the commencement of the development hereby permitted. The scheme shall be implemented as approved within 12 months of the commencement of the approved development and thereafter be maintained in accordance with the approved scheme. In the event of any of the trees or shrubs so planted dying or being seriously damaged or destroyed within 5 years of the completion of the development, a new tree or shrub or equivalent number of trees or shrubs, as the case may be, of a species first approved by the Local Planning Authority, be planted and properly maintained in a position or positions first approved by the Local Planning Authority. Reason: To help to assimilate the development into its surroundings in accordance with Policies G2, G6, C1, C2, C9, D1 and H12 of the South Oxfordshire Local Plan 2011.

Prior to the commencement of any site works (including demolition or site clearance) a protected area shall be designated for all existing trees which are shown to be retained, and the trees shall be protected in accordance with a scheme which complies with the current edition of BS 5837: "Trees in Relation to Construction" and shall have been submitted to, and approved in writing by, the local planning authority. The agreed measures shall be kept in place during the entire course of development Reason: To safeguard trees which are visually important in accordance with Policies G2, G6, C1, C2, C9, D1 and H12 of the South Oxfordshire Local Plan 2011.

The development hereby permitted shall be implemented in accordance with the scheme of mitigation contained in the Bat Survey Report by The Wildlife Survey Unit dated June 2010 in all respects. Any variation shall be agreed in writing by the Local Planning Authority before such change is made. Reason: To protect the important species on the site, in accordance with Policies G2, C8 and H12 of the South Oxfordshire Local Plan 2011.

Unless otherwise agreed by the Local Planning Authority 'LPA', development other than that required to be carried out as part of an approved remediation scheme must not commence until phases i) to iv) have been complied with, or further works have been deemed unnecessary as a result of conclusions based on risk assessments during phases i), ii) or iii), and this has been agreed upon in writing by the LPA. Document(s) detailing the works undertaken in each phase must be submitted to and approved by the LPA in writing before any other phase commences, and before occupation of any building in relation to phase v). All phases of investigation must be designed and conducted in accordance with DEFRA and the Environment Agency's 'Model Procedures for the Management of Land Contamination, CLR 11. i) A South Oxfordshire District Council contaminated land statement questionnaire. ii) A preliminary risk assessment, including a site walkover and conceptual site model detailing all potential contaminants, sources and receptors. iii) An intrusive site investigation to assess the type, nature, extent and risk(s) of any contamination identified in ii), whether or not it originates on site. It is recommended that the LPA are consulted on proposals. iv) A detailed remediation scheme, to bring the site to a condition suitable for the intended use. The scheme shall include all works to be undertaken, proposed remediation objectives and remediation criteria, a timetable of works and site management procedures. The scheme shall also ensure that after remediation the site will not qualify as Contaminated Land under Part 2A Environmental Protection Act 1990. v) Validation of the remediation scheme demonstrating the effectiveness of the remediation approved in iv). If contamination is found during the course of development that was not previously identified, the development must be halted on that part of the site to the extent specified by the LPA and until the LPA are satisfied that all necessary phases above have been undertaken. Reason: To ensure that risks from land contamination to future users of the land and neighbouring land are minimised, together with those to controlled waters, property and ecological systems, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other offsite receptors in accordance with Policies G2, EP8 and H12 of the South Oxfordshire Local Plan 2011.
Appeal
No appeal lodged.
Updates
These Planning Application Details were returned live from our back office database, and as such are as up to date as when the page was retrieved.