Planning Application Details

P06/W0592Application Type: No Type (Show Map - opens in new window)
Status Bar
 
 Completed stage
 
 Current stage
 
 Next stage
Application registered
Consultation period
Application under consideration
Decision made
Description
Erection of two power supply buildings, second storey extension to water treatment room and associated cable support on a temporary basis until 31/12/2022.
Location
Land North of Road 12, Culham Science Centre Culham (in the parish of Clifton Hampden)
Grid Reference
453589/196006
Applicant
UKAEA
c/o agent
Agent
Kemp & Kemp Property
Elms Court
Botley
OXFORD
OX2 0LP
Case Officer
Mr A.J.Coggins
Telephone: 01235 422600
Email: planning@southoxon.gov.uk
Consultation / Notification
No further Representations on this application will be accepted.

Consultations / Notifications to date are shown below.

Name / Number
Date Sent
Response Date
 
c/o Mr O Bowden
Westmoor
Oxford Road
Clifton Hampden
ABINGDON
Oxon
20 06 2006
20 07 2006
 
Tech.Dir, Monson Engineering Ltd
20 06 2006
22 06 2006
 
Environmental Health
28 06 2006
13 07 2006
 
Planning Liaison Team Leader
13 07 2006
11 08 2006
 
Application Type
Major
Application Progress
Date Received  
19th May 2006
Registration Date  
16th June 2006
Start Consultation Period  
16th June 2006
End Consultation Period  
20th July 2006
Target Decision Date  
11th August 2006
Decision
Planning Permission on 10th August 2006
Conditions / Refusal Reasons
The use of the land for the carrying on of atomic energy research and development in connection with the JET facility shall be terminated by December 2022 and all buildings, structures, materials or plant the subject of this application shall be removed from the land which shall be left in a tidy and orderly state. Reason: To accord with the provisions of the Structure Plan for Oxfordshire and in accordance with Policy RUR3 of the South Oxfordshire Local Plan.

That the buildings, structures or plant shall be solely used by UKAEA and their partners or by an organisation of which the authority and these partners are members for the carrying on of atomic energy research and development in connection with the Jet Facility up to 31 December 2022. Reason: To accord with the provisions of the Structure Plan for Oxfordshire and in accordance with Policy RUR3 of the South Oxfordshire Local Plan.

That no development shall take place until the Local Planning Authority are satisfied that contamination has been sufficiently investigated and any remedial action approved in writing. The site shall then not be occupied until any agreed action is implemented and approved by the Local Planning Authority. i. "The following measures (a-d) shall be undertaken to investigate and remediate any contamination on the site prior to commencement of the development: a) A desk study shall be submitted to and approved in writing by the Local Planning Authority. This study shall be conducted fully in line with the approach indicated in BS 10175: 2011 (Investigation of potentially contaminated sites - code of practice). The study shall include the identification of all previous site uses, potential contaminants that might reasonably be expected given those uses and other relevant information. If contamination is suspected at the site the information obtained must then be used to formulate an initial conceptual model for the site including all potential contaminant sources, pathways and receptors. b) Where contamination is identified as having the potential to be present in a) above, proposals for a site investigation to characterise the site must be submitted to and approved in writing by the Local Planning Authority. This proposal shall be designed having regard to the approved desk study and BS 10175. It should be clear about what information it seeks to obtain and how this will refine the initial conceptual model for the site. c) The approved site investigation referred to on b) above shall be fully implemented and a report submitted to the Local Planning Authority for written approval. The report shall be in line with BS 10175 and detail the works undertaken to characterise the site and contain a refined conceptual model in the light of the results of the investigation. N.B. If the Local Planning Authority is not satisfied that the site has been adequately characterised after the first stage of investigation, further works will be required to clarify any remaining uncertainties. d) Where unacceptable levels of contamination are identified, a remediation scheme shall be submitted to and approved in writing by the Local Planning Authority. The scheme shall incorporate details of the procedures and documentation employed to validate the remediation measures identified in c) above. ii. Prior to occupation of the site, the approved remediation and validation schemes in d) above shall be fully implemented and a report submitted and approved in writing by the Local Planning Authority. Reason: To ensure that any ground and water contamination is identified and adequately addressed to ensure the safety of the development, the environment and the public and ensure that the site is suitable for the proposed use and in accordance with Policy EP1 of the South Oxfordshire Local Plan.

That no development shall take place until the method of piling foundations have been submitted to and approved in writing by the Local Planning Authority. Reason: To prevent pollution of the water environment and in accordance with Policy EP1 of the South Oxfordshire Local Plan.

That details of surface water drainage works shall be submitted to and approved in writing by the Local Planning Authority prior to the development commencing. Reason: In the interests of public health and to avoid pollution and in accordance with Policy EP1 of the South Oxfordshire Local Plan.
Appeal
No appeal lodged.