Description
Refurbishment of existing service station to provide forecourt, canopy, shop, car wash, parking and associated services.
Conditions / Refusal Reasons
That the development must be begun not later than the expiration of five years beginning with the date of this permission and if this condition is not complied with this permission shall lapse.
Reason: By virtue of Sections 91 to 95 of the Town and Country Planning
Act 1990.
That samples of all materials to be used in the external construction and finishes of the development hereby permitted shall be submitted to and approved in writing by the Local Planning Authority before the development is commenced.
Reason: To ensure that the details of the development are satisfactory in
accordance with Policies G1 and G8 of the adopted South
Oxfordshire Local Plan.
That prior to the commencement of the development hereby approved, details of the floodlights shall be submitted to and approved in writing by the Local Planning Authority.
Reason: To ensure that the details of the development are satisfactory in
accordance with Policy G1 of the adopted South Oxfordshire Local
Plan.
That the parking provision shall be as shown on the deposited drawing, reference 12459/20 all constructed, surfaced and laid out, retained and maintained to the satisfaction of the Local Planning Authority.
Reason: To comply with the Local Planning Authority's vehicle parking
standards and to protect local amenities.
That development shall not begin until a scheme for the disposal of foul sewage has been submitted to and approved in writing by the Local Planning Authority.
Reason: In the interests of public health in accordance with Policy G6 of the
adopted South Oxfordshire Local Plan.
That surface water shall not be disposed of other than in accordance with a detailed surface water drainage scheme which shall first have been submitted to and approved in writing by the Local Planning Authority.
Reason: In the interests of public health in accordance with Policy G6 of the
adopted South Oxfordshire Local Plan.
There shall be no raising of existing ground levels on the site.
Reason: To prevent the increased risk of flooding due to impedance of flood
flows and reduction of flood storage capacity in accordance with
Policy G16 of the adopted South Oxfordshire Local Plan.
No spoil or materials shall be deposited or stored on that part of the site lying within the area of land liable to flood.
Reason: To prevent the increased risk of flooding due to impedance of flood
flows and reduction of flood storage capacity in accordance with
Policy G16 of the adopted South Oxfordshire Local Plan.
Any walls or fencing constructed within or around the site shall be designed to be permeable to flood water.
Reason: To prevent the increased risk of flooding due to impedance of flood
flows and reduction of flood storage capacity in accordance with
Policy G16 of the adopted South Oxfordshire Local Plan.
No development approved by this planning permission shall be commenced until:
a) A desktop study has been carried out which shall include the identification of previous site uses, potential contaminants that might reasonably be expected given those uses and other relevant information; and using this information a diagrammatical representation (conceptual model) for the site of all potential contaminant sources, pathways and receptors has been produced.
b) A site investigation has been designed for the site using the information obtained from the desktop study and any conceptual model. This shall be submitted to and approved in writing by the Planning Authority before the investigation is carried out on the site. The investigation shall be comprehensive enough to make:
a risk assessment to be undertaken relating to groundwater and surface water associated on and off the site that may be affected;
refinement of the conceptual model; and
the development of a method statement detailing the remediation requirements
c) The site investigation has been undertaken in accordance with details approved by the Planning Authority and a risk assessment has been undertaken.
d) A method statement detailing the remediation requirements, including measures to minimise the impact on ground and surface waters, using the information obtained from the site investigation, has been submitted to and approved in writing by the Planning Authority.
Reason: To prevent pollution of the water environment in accordance with
Policy G7 of the adopted South Oxfordshire Local Plan.
The development of the site should be carried out in accordance with the approved Method Statement.
Reason: To ensure that the development complies with approved details in the
interests of protection of Controlled Waters.
If during development, contamination not previously identified, is found to be present at the site then no further development (unless otherwise agreed in writing with the Local Planning Authority) shall be carried out until the developer has submitted, and obtained written approval from the Local Planning Authority for, an addendum to the Method Statement. This addendum to the Method Statement must detail how this unsuspected contamination shall be dealt with.
Reason: To ensure that the development complies with approved details in the
interests of protection of Controlled Waters in accordance with
Policy G7 of the adopted South Oxfordshire Local Plan.
Upon completion of the remediation detailed in the Method Statement a report shall be submitted to the Local Planning Authority that provides verification that the required works regarding contamination have been carried out in accordance with the approved Method Statement(s). Post remediation sampling and monitoring results shall be included in the report to demonstrate that the required remediation has been fully met. Future monitoring proposals and reporting shall also be detailed in the report.
Reason: To protect Controlled Waters by ensuring that the remediated site has
been reclaimed to an appropriate standard in accordance with
Policy G7 of the adopted South Oxfordshire Local Plan.
Clean, uncontaminated rock, subsoil, brick rubble, crushed concrete and ceramic only shall be permitted as infill material.
Reason: To prevent pollution of controlled waters in accordance with Policy G7
of the adopted South Oxfordshire Local Plan.
Foundation designs using penetrative methods are only acceptable in areas on site where they will not present a risk of groundwater. Where there is a potential risk then the principle of their use, the location(s) and form of the foundation design must be approved in writing by the Local Planning Authority. The piling shall thereafter be undertaken only in accordance with the approved details.
Reason: The site is contaminated/potentially contaminated and piling could
lead to the contamination of groundwater in the underlying aquifer in
accordance with Policy G7 of the adopted South Oxfordshire Local
Plan.
That the existing hedge along the whole of the south-west boundary of the land shall be retained and properly maintained at a height of not less than 4 metres, and that any plant which may die or be seriously damaged or destroyed within three years of the completion of the development shall be replaced and the replacement shall be properly maintained.
Reason: To help to assimilate the development into its surroundings in
accordance with Policy G8 of the adopted South Oxfordshire Local
Plan.