Planning Application Details

P18/S1260/FULApplication Type: Full Application (Show Map - opens in new window)
Status Bar
 
 Completed stage
 
 Current stage
 
 Next stage
Application registered
Consultation period
Application under consideration
Decision made
Description
Erection of detached two-storey 3-bedroom dwelling replacing garage and outbuildings (Position, size and design of dwelling and parking layout altered as shown on amended plans received 6th June 2018 and drainage details shown on amended plan received 29th June 2018 and updated block plan received 4th October 2018).
Location
19 The Ridgeway Nettlebed RG9 5AN
Grid Reference
/
Applicant
Daytona Developments Ltd
19 Heathman's Road
London
SW6 4TJ
Agent
Progressive Architecture
4 Lewisham Road
Slaithwaite
Huddersfield
HD7 5AL
Case Officer
Paul Lucas
Telephone: 01235 422600
Email: planning@southoxon.gov.uk
View officers committee report (17/10/2018) here
Consultation / Notification
No further Representations on this application will be accepted.

Consultations / Notifications to date are shown below.

Name / Number
Date Sent
Response Date
 
Nettlebed Parish Coucil
Jo Pugh (Clerk)
11 Springfield Close
Watlington
OX49 5RF
04 07 2018
16 07 2018
 
Highways Liaison Officer (Oxfordshire County Council)
12 06 2018
18 06 2018
 
18 The Ridgeway
Nettlebed
Henley-On-Thames
RG9 5AN
12 06 2018
09 05 2018
 
Ridgeway Cottage
20 The Ridgeway
Nettlebed
Henley-On-Thames
RG9 5AN
12 06 2018
26 06 2018
 
15 The Ridgeway
Nettlebed
Henley-On-Thames
RG9 5AN
12 06 2018
 
17 The Ridgeway
Nettlebed
Henley-On-Thames
RG9 5AN
12 06 2018
17 06 2018
 
9 Wanbourne Lane
Nettlebed
Henley-On-Thames
RG9 5AH
12 06 2018
08 05 2018
 
22 The Ridgeway
Nettlebed
Henley-On-Thames
RG9 5AN
12 06 2018
10 05 2018
 
24 The Ridgeway
Nettlebed
Henley-On-Thames
RG9 5AN
12 06 2018
 
23 The Ridgeway
Nettlebed
Henley-On-Thames
RG9 5AN
12 06 2018
 
21 The Ridgeway
Nettlebed
Henley-On-Thames
RG9 5AN
12 06 2018
27 06 2018
 
The Bird's Nest
30 The Ridgeway
Nettlebed
Henley on Thames
RG9 5AN
12 06 2018
22 06 2018
 
WSP
14 06 2018
 
Drainage - (South&Vale)
04 07 2018
13 07 2018
 
Application Type
Minor (Full Application)
Application Progress
Date Received  
12th April 2018
Registration Date  
19th April 2018
Start Consultation Period  
20th April 2018
End Consultation Period  
18th July 2018
Target Decision Date  
23rd October 2018
Target Committee Meeting  
17th October 2018
Decision
Planning Permission on 19th October 2018
Conditions / Refusal Reasons
The development to which this permission relates must be begun not later than the expiration of three years beginning with the date of this permission. Reason: By virtue of Sections 91 to 95 of the Town and Country Planning Act 1990 as amended by section 51 of the Planning and Compulsory Purchase Act 2004. Related application(s): P18/S4272/DIS, P19/S2656/DIS

That the development hereby approved shall be carried out in accordance with the details shown on the following approved plans, P962-51-01, P962-55-04, P962-50-05, P962-03-01, P962-15, P962-01 and P962-05-01, except as controlled or modified by conditions of this permission. Reason: To secure the proper planning of the area in accordance with Development Plan policies. Related application(s): P18/S4272/DIS, P19/S2656/DIS

Except in the case of any building work hereby permitted, no change in the levels of the land shall take place unless in accordance with a detailed scheme which shall have been submitted to and approved in writing by the Local Planning Authority before the construction of the foundations commences. The scheme shall include detailed plans showing the existing and proposed ground levels of the site together with the slab and ridge levels of the proposed development, relative to a fixed datum point on adjoining land outside of the application site. Reason: To ensure a satisfactory form of development in accordance with Policy CSQ3 of the South Oxfordshire Core Strategy 2027 and Policies G2, D1 and H4 of the South Oxfordshire Local Plan 2011. Related application(s): P18/S4272/DIS, P19/S2656/DIS

Prior to the first use of any facing materials, a schedule of all materials to be used in the external construction and finishes of the development hereby permitted shall be submitted to and approved in writing by the Local Planning Authority. Reason: In the interests of the visual appearance of the development in accordance with Policy CSQ3 of the South Oxfordshire Core Strategy 2027 and Policies G2, D1 and H4 of the South Oxfordshire Local Plan 2011. Related application(s): P18/S4272/DIS

The stairwell window in the north-west-facing elevation of the dwelling hereby permitted shall be glazed in obscure glass with a minimum of level 3 obscurity, and shall be fixed shut with the exception of a top hung openable fanlight, prior to the first occupation of the accommodation and it shall be retained as such thereafter. Reason: To ensure that the development is not unneighbourly in accordance with Policies G2, D4 and H4 of the South Oxfordshire Local Plan 2011.

Notwithstanding the provisions of the Town and Country (General Permitted Development Order) 2015 (or any Order revoking or re-enacting that Order), no development as specified in Schedule 2, Part 1, Class A - Extensions; Class E - Outbuildings shall be undertaken without the prior written permission of the Local Planning Authority. Reason: The specific circumstances of this site warrant the Local Planning Authority having control over any further development as specified in the condition in the interests of amenity and in accordance with Policy CSQ3 of the South Oxfordshire Core Strategy 2027 and Policies G2, C9, D1, D4 and H4 of the South Oxfordshire Local Plan 2011.

Prior to the first occupation of the development, the existing means of access onto The Ridgeway shall be improved and laid out and constructed strictly in accordance with the local highway authority's specifications and all ancillary works specified shall be undertaken. Reason: In the interest of highway safety in accordance with Policies G2, H4 and T1 of the South Oxfordshire Local Plan 2011.

The vision splays shown on the approved plan P962-50-05 shall not be obstructed by any object, structure, planting or other material with a height exceeding or growing above 0.9 metres as measured from carriageway level. Reason: In the interest of highway safety in accordance with Policies G2, H4 and T1 of the South Oxfordshire Local Plan 2011.

Prior to the first occupation of the development hereby approved, the parking and turning areas shall be provided in accordance with the approved plan P962-50-05 and shall be constructed, laid out, surfaced, drained and completed to be compliant with sustainable drainage (SuDS) principles, and shall be retained unobstructed except for the parking of vehicles associated with the development at all times. Reason: In the interests of highway safety and in accordance with Policies G2, D2, H4, T1 and T2 of the South Oxfordshire Local Plan 2011.

No surface water from the development shall be discharged onto the adjoining highway. Reason: In the interest of highway safety in accordance with Policies G2, H4 and T1 of the South Oxfordshire Local Plan 2011.

Prior to the commencement of the development hereby permitted a scheme for the landscaping of the site, including the planting of live trees and shrubs, the treatment of the hardstandings, and the provision of boundary treatment shall be submitted to and approved in writing by the Local Planning Authority. The scheme shall be implemented prior to the first occupation or use of development and thereafter be maintained in accordance with the approved scheme. In the event of any of the trees or shrubs so planted dying or being seriously damaged or destroyed within 5 years of the completion of the development, a new tree or shrub or equivalent number of trees or shrubs, as the case may be, of a species first approved by the Local Planning Authority, shall be planted and properly maintained in a position or positions first approved in writing by the Local Planning Authority. Reason: To help to assimilate the development into its surroundings in accordance with Policies CSEN1 and CSQ3 of the South Oxfordshire Core Strategy 2027 and Policies G2, C9, D1 and H4 of the South Oxfordshire Local Plan 2011.

Prior to the commencement of development, a full surface water drainage scheme shall be submitted to and approved in writing by the Local Planning Authority. The scheme shall include details of the size, position and construction of the drainage scheme and results of soakage tests carried out at the site to demonstrate the infiltration rate. Three tests should be carried out for each soakage pit as per BRE 365 with the lowest infiltration rate (expressed in m/s) used for design. An exceedance plan shall be submitted. The development shall be carried out in accordance with the approved details prior to the first occupation of the development hereby approved. Reason: To ensure the proper provision for surface water drainage and/or to ensure flooding is not exacerbated in the locality in accordance with Policies EP1, EP4 and EP6 of the South Oxfordshire Local Plan 2011 and guidance in the NPPF and NPPG.

Prior to the commencement of development, a full foul water drainage scheme shall be submitted to and approved in writing by the Local Planning Authority. The scheme shall include details of the size, position and construction of the drainage scheme, all coupled with calculations to evidence this. The development shall be carried out in accordance with the approved details prior to the first occupation of the development hereby approved. Reason: To prevent pollution in accordance with Policy EP1 of the South Oxfordshire Local Plan 2011.
Appeal
No appeal lodged.
Updates
These Planning Application Details were returned live from our back office database, and as such are as up to date as when the page was retrieved.