Planning Application Details

P14/S3842/FULApplication Type: Full Application (Show Map - opens in new window)
Status Bar
 
 Completed stage
 
 Current stage
 
 Next stage
Application registered
Consultation period
Application under consideration
Decision made
Description
Demolition of existing Bungalow and garage and replacement with new Chalet Bungalow home and garage, along with new access to the highway from the property. (As amplified by Arboricultural Impact Assessment dated 22 December 2014 and amended by drawings A100 Rev G accompanying letter from agent altering the rear elevation and adding a hipped roof and drawings 547-LST-SK02 P1 and A102 Rev G, A103 Rev G moving the position of the garage.)
Location
153 Thame Road Warborough OX10 7DD
Grid Reference
459775/193767
Applicant
Mr & Mrs Dan Anderson
151 Thame Road
Warborough
WALLINGFORD
OX10 7DD
Agent
Tred-AD Ltd
8 Henfield View
Warborough
WALLINGFORD
OX10 7DB
Constraints
Warborough Conservation Area
Case Officer
Paul Bowers
Telephone: 01235 422600
Email: planning@southoxon.gov.uk
Consultation / Notification
No further Representations on this application will be accepted.

Consultations / Notifications to date are shown below.

Name / Number
Date Sent
Response Date
 
Warborough Parish Council
c/o Ms J Burns
The Greet Hall
171 Thame Road
Warborough
Wallingford, Oxon
OX10 7DG
05 02 2015
12 01 2015
 
County Archaeological Services (SODC)
16 12 2014
17 12 2014
 
Conservation Officer ( South )
05 02 2015
16 02 2015
 
Highways Liaison Officer (Oxfordshire County Council)
16 12 2014
 
151 Thame Road
Warborough
Wallingford
OX10 7DD
05 02 2015
 
Greenways
155 Thame Road
Warborough
Oxon
Ox10 7dd
05 02 2015
23 01 2015
 
149 Thame Road
Warborough
Wallingford
OX10 7DD
05 02 2015
 
Forestry Officer (South Oxfordshire District Council)
05 02 2015
24 02 2015
 
Application Type
Minor (Full Application)
Application Progress
Date Received  
2nd December 2014
Registration Date  
10th December 2014
Start Consultation Period  
10th December 2014
End Consultation Period  
25th January 2015
Target Decision Date  
27th February 2015
Decision
Planning Permission on 26th February 2015
Conditions / Refusal Reasons
The development to which this permission relates must be begun not later than the expiration of three years beginning with the date of this permission. Reason: By virtue of Sections 91 to 95 of the Town and Country Planning Act 1990 as amended by section 51 of the Planning and Compulsory Purchase Act 2004. Related application(s): P17/S2448/DIS

That the development hereby approved shall be carried out in accordance with the details shown on the following approved plans, A101, A107, A108, A100-F, A105-G, A104 Rev H, 547-LST-SK01, A102 Rev G and A103 Rev G, except as controlled or modified by conditions of this permission. Reason: To secure the proper planning of the area in accordance with Development Plan policies. Related application(s): P17/S2448/DIS

Prior to the commencement of the development hereby approved samples of the materials to be used for the external walls and roofs shall be submitted to and approved in writing by the Local Planning Authority. Reason: In the interests of the visual appearance of the development in accordance with Policy CSQ3 of the South Oxfordshire Core Strategy 2027 and Policy G2 of the South Oxfordshire Local Plan 2011.

The dwelling hereby approved shall achieve Level 4 of the Code for Sustainable Homes (or any such equivalent national measure of sustainability for house design which replaces that scheme). No dwelling shall be occupied until a final Code Certificate has been issued for it certifying that Code Level 4 (or any such equivalent national measure of sustainability for house design which replaces that scheme) has been achieved. Reason: To ensure high standards of sustainable design and construction in accordance with Policy CSQ2 of the South Oxfordshire Core Strategy 2027.

Prior to the commencement of any site works or operations relating to the development hereby permitted, an arboricultural method statement to ensure the satisfactory protection of retained trees during the construction period shall be submitted to and approved in writing by the Local Planning Authority. Written approval must be obtained prior to commencement of any site works including demolition. The matters to be encompassed within the arboricultural method statement shall include the following:- (i) A specification for the pruning of, or tree surgery to, trees to be retained in order to prevent accidental damage by construction activities; (ii) The specification of the location, materials and means of construction of temporary protective fencing and/or ground protection in the vicinity of trees to be retained, in accordance with the recommendations of BS 5837 'Trees in relation to design, demolition and construction' and details of the timing and duration of its erection; (iii) The definition of areas for the storage or stockpiling of materials, temporary on-site parking, site offices and huts, mixing of cement or concrete, and fuel storage; (iv) The means of demolition of any existing site structures, and of the re-instatement of the area currently occupied thereby; (v) The specification of the routing and means of installation of drainage or any underground services in the vicinity of retained trees; (vi) The details and method of construction of any other structures such as boundary walls in the vicinity of retained trees and how these relate to existing ground levels; (vii) The details of the materials and method of construction of any roadway, parking, pathway or other surfacing within the RPA, which is to be of a 'no dig' construction method in accordance with the principles of Arboricultural Practice Note 12 "Through the Trees to Development", and in accordance with current industry best practice; and as appropriate for the type of roadway required in relation to its usage. (viii) Provision for the supervision of ANY works within the root protection areas of trees to be retained, and for the monitoring of continuing compliance with the protective measures specified, by an appropriately qualified arboricultural consultant, to be appointed at the developer's expense and notified to the Local Planning Authority, prior to the commencement of development; and provision for the regular reporting of continued compliance or any departure there from to the Local Planning Authority. ix)Full and detailed drawings of the no dig foundation design to be used for the north western elevation and new garage. Thereafter the development shall be carried out in accordance with the approved details with the agreed measures being kept in place during the entire course of development. Reason: To safeguard trees which are visually important in accordance with Policy CSQ3 of the South Oxfordshire Core Strategy 2027 and Policies G2, C9 and D1 of the South Oxfordshire Local Plan 2011.

Prior to the first occupation of the development hereby approved, the parking and turning areas shall be provided in accordance with the approved plan A102 Rev G and shall be constructed, laid out, surfaced, drained and completed, and shall be retained unobstructed except for the parking of vehicles associated with the development at all times. Reason: In the interests of highway safety and in accordance with Policies T1 and T2 of the South Oxfordshire Local Plan 2011.
Appeal
No appeal lodged.
Updates
These Planning Application Details were returned live from our back office database, and as such are as up to date as when the page was retrieved.