The development to which this permission relates must be begun not later than the expiration of three years beginning with the date of this permission.
Reason: By virtue of Sections 91 to 95 of the Town and Country Planning Act 1990 as amended by section 51 of the Planning and Compulsory Purchase Act 2004.
Related application(s):
P18/S2004/DISThat the development hereby approved shall be carried out in accordance with the details shown on the following approved plans, A101, A102, A103, A100 and A212, except as controlled or modified by conditions of this permission.
Reason: To secure the proper planning of the area in accordance with Development Plan policies.
The exterior of the development hereby permitted shall only be constructed in the materials specified within the application forms hereby approved or in materials which shall previously have been approved in writing by the Local Planning Authority.
Reason: In the interests of the visual appearance of the development in accordance with Policies CSEN3 and CSQ3 of the South Oxfordshire Core Strategy 2027 and Policies CON2, CON3, D1, G2 and H13 of the South Oxfordshire Local Plan 2011.
Prior to the commencement of any site works (including demolition or site clearance) a protected area shall be designated for all existing trees which are shown to be retained, and the trees shall be protected in accordance with a scheme which complies with the current edition of BS 5837: "Trees in relation to design, demolition and construction" that shall first have been submitted to, and approved in writing by, the Local Planning Authority. The agreed measures shall be kept in place during the entire course of development.
Reason: To safeguard trees which are visually important in accordance with Policies CSEN1 and CSQ3 of the South Oxfordshire Core Strategy 2027 and Policies C9, D1 and G2 of the South Oxfordshire Local Plan 2011.
The developer shall confirm in writing to the Local Planning Authority the presence of any unsuspected contamination encountered during the development. In the event of any contamination to the land and/or water being encountered, no development shall continue until a programme of investigation and/or remedial works to include methods of monitoring and certification of such works undertaken has been submitted to and approved in writing by the local planning authority.
Reason: To ensure that any ground, water and associated gas contamination is identified and adequately addressed to ensure the safety of the development, the environment and to ensure the site is suitable for the proposed use in accordance with Policy EP8 of the South Oxfordshire Local Plan 2011.
The development hereby approved shall take place in accordance with the approved Flood Risk Assessment (UK Flood Risk Consultants, Version 1.0, 24th April 2018). This shall include the following mitigation measures:
a) Finished Floor Levels (FFL's) to be set at or above the existing FFL for the existing dwelling;
b) Flood Resilient Construction measures shall be used as described within Section 6.2 of the FRA;
and
c) Surface Water to be drained via a suitably sized water butt/rainwater re-use system.
Reason: To prevent increased risk of flooding due to impedance of flood flows and reduction of flood storage capacity in accordance with the National Planning Policy Framework.